VT HALTER Lays Keel for Navy Survey Ship

Wednesday, February 02, 2011

VT Halter Marine, Inc. held a keel laying ceremony for T-AGS 66 USNS Maury, which is currently under construction at Halter Moss Point. In December 2009, VT Halter Marine was awarded a contract of approximately $87M to build an enhanced version of the T-AGS 60 Class oceanographic survey ship for the U.S. Navy. Delivery of the vessel is expected in July 2013.

T-AGS 60 Class ships are designed and constructed to provide multi-purpose oceanographic capabilities for typical missions such as: oceanographic sampling and data collection of surface, midwater and ocean floor parameters; launching, recovering, and towing scientific packages, both tethered and autonomous, including handling, monitoring, and servicing remotely operated vehicles (ROVs); shipboard oceanographic data processing and sample analysis; and precise navigation, track line maneuvering, and station keeping to support deep ocean and coastal surveys.

VT Halter Marine is the leading designer and builder of specialized oceanographic ships for the U.S. Navy and has experience in building the previous six ships of the T-AGS 60 Class; T-AGOS 13 through T-AGOS 18 ocean surveillance ships; a T-AGOS 23 Class SWATH ocean surveillance ship, T-AGS 51 and T-AGS 52 hydrographic survey ships; oceanographic survey ships AGOR 23, 24 and 25; NOAA AGOR Ronald H. Brown; and four fisheries survey vessels (FSVs) for NOAA. A T-AGM 25 missile range instrumentation ship is currently under construction at VT Halter Marine in Pascagoula.
 

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Navy Shipyard Puget Sound Seeks Volunteer Workers

Puget Sound Naval Shipyard and Intermediate Maintenance Facility (IMF) are seeking shipyard volunteers to help overcome a staffing shortage of more than 600 mechanics,

Wärtsilä to Provide Harvey Gulf Vessels Integrated Package

Wärtsilä has been awarded a contract by Eastern Shipbuilding Group, of Panama City, Florida to supply an integrated solution for a new multipurpose support vessel

Final Section of Giant Aircraft Carrier Sets Sail

The final section of HMS Queen Elizabeth, the first of two new aircraft carriers being built for the U.K. Royal Navy, has left BAE Systems’ shipyard at Scotstoun

Navy

Navy Shipyard Puget Sound Seeks Volunteer Workers

Puget Sound Naval Shipyard and Intermediate Maintenance Facility (IMF) are seeking shipyard volunteers to help overcome a staffing shortage of more than 600 mechanics,

BAE Gets Navy Contract for USS Arlington

The Department of Defense awards a Navy contract for work on LPD 24 to BAE Systems, Norfolk, Va. BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded a $22,

U.S. Merchant Marine Academy Hosts 2013 Graduation

The U.S. Merchant Marine Academy (USMMA) graduated 201 new maritime leaders as part of its Class of 2013 commencement ceremony. The keynote speaker, General William M.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright