Hammerfest LNG Production Resumes After Leak

MarineLink.com
Wednesday, January 08, 2014
Snøhvit

Production at Hammerfest LNG Production from the Hammerfest LNG plant has been resumed after a gas leak Sunday night.

"We started run-up of the Hammerfest LNG plant Tuesday night, and the plant has now reached stable operation. All necessary repairs on the plant have been completed to ensure a safe and efficient start-up," says Knut Gjertsen, head of Snøhvit operations.

The Hammerfest LNG plant was shut down Sunday night due to a gas leak in the processing facility.

In connection with the plant run-up a condensate leak occurred which required extra time for the start-up preparations.

The incident will be investigated by Statoil.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Petrobras Downgrade Shakes Market

Moody's shocked bond investors this week with a surprise two-notch downgrade that put Brazilian oil company Petrobras in junk territory. The move was seen by some investors as overly assertive,

Brightoil Reports Steady Growth in Interim Results

Brightoil Petroleum (Holdings) Limited announced its interim results for the six months ended December 31, 2014, reporting steady growth over the period.   During the period,

Davie Building LNG-powered Ferries

Canadian shipbuilder Davie held a keel laying ceremony for MV Armand-Imbeau II, marking the beginning of the hull assembly for this first of two sisterships under

Energy

Petrobras Downgrade Shakes Market

Moody's shocked bond investors this week with a surprise two-notch downgrade that put Brazilian oil company Petrobras in junk territory. The move was seen by some investors as overly assertive,

Brightoil Reports Steady Growth in Interim Results

Brightoil Petroleum (Holdings) Limited announced its interim results for the six months ended December 31, 2014, reporting steady growth over the period.   During the period,

Mexico Approves 5 Shallow Water Areas in Round One Oil Tender

Mexico has approved the terms for five shallow water areas containing around 355 million barrels of oil equivalent as part of its Round One tender to open up the country's oil fields,

LNG

Davie Building LNG-powered Ferries

Canadian shipbuilder Davie held a keel laying ceremony for MV Armand-Imbeau II, marking the beginning of the hull assembly for this first of two sisterships under

ClassNK Updates Guidelines for Floating Offshore Facilities

ClassNK released a new version of its Guidelines for Floating Offshore Facilities for LNG/LPG Production, Storage, Offloading and Regasification.   Available on the ClassNK website,

Lithuania Looks to U.S. for Gas

Lithuanian liquefied natural gas (LNG) importer Litgas has signed a preliminary agreement with a U.S. supplier, looking to lessen the Baltic nation's dependence on Russia.

News

Ferus Smit to Launch Newbuild Bulker

Ferus Smit will launch newbuild bulk carrier Arklow Breeze on Friday, March 20 at Westerbroek.   Arklow Breeze is the sixth and last vessel of a series to be

Petrobras Downgrade Shakes Market

Moody's shocked bond investors this week with a surprise two-notch downgrade that put Brazilian oil company Petrobras in junk territory. The move was seen by some investors as overly assertive,

This Week's Top Stories

The top stories this week covered everything from a DP system failure, a facelift for a WWII torpedo boat, and some mysterious tankers off the coast of Philadelphia.

Maritime Safety

Somali Pirates Release Long-held Hostages

Somali pirates have freed four Thai nationals seized from a fishing vessel at sea in 2010, ending the longest-running hostage drama in the Horn of Africa state, the United Nations said on Friday.

Some Roads Reopened in Brazil, Truck Strike Persists

Striking truckers lifted their blockade of dozens of highways in Brazil after police began fining and arresting protesters, though strike organizers said they had

ClassNK Updates Guidelines for Floating Offshore Facilities

ClassNK released a new version of its Guidelines for Floating Offshore Facilities for LNG/LPG Production, Storage, Offloading and Regasification.   Available on the ClassNK website,

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2500 sec (4 req/sec)