Hammerfest LNG Production Resumes After Leak

MarineLink.com
Wednesday, January 08, 2014
Snøhvit

Production at Hammerfest LNG Production from the Hammerfest LNG plant has been resumed after a gas leak Sunday night.

"We started run-up of the Hammerfest LNG plant Tuesday night, and the plant has now reached stable operation. All necessary repairs on the plant have been completed to ensure a safe and efficient start-up," says Knut Gjertsen, head of Snøhvit operations.

The Hammerfest LNG plant was shut down Sunday night due to a gas leak in the processing facility.

In connection with the plant run-up a condensate leak occurred which required extra time for the start-up preparations.

The incident will be investigated by Statoil.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

DNV Type Approved Anchor Winch for the Arctic Prowler

JK Fabrication has landed DNV certification for its 40-30-3000-DNV series Anchor Winch. Culminating a two-year process, JK’s C-series winch was at last awarded

US Coast Guard Travelling Inspectors' Centenary

July 2014 marked the 100th anniversary of the traveling inspection staff, originally created under the Steamboat Inspection Service. These travelers are highly

Pumps Reach Sinking Shrimper Just in Time

A commercial fishing vessel from Brownsville is slowly making its way back to port, thanks to some quick actions by its crew and Coast Guard units, informs the US Coastguard,

Energy

Mass Flow Metering System for MFO delivery in Singapore

As the world's leading bunkering port Singapore is to provide quality bunkering services to vessels lifting bunkers in the port. The use of the Mass Flow Metering

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

BP Reports Better Second Quarter 2014 Results

BP today announced its financial results for the second quarter of 2014. Underlying replacement cost profit for the quarter of 2014 was $3.6 billion, 34% higher than the $2.

LNG

Höegh LNG Partners Launch IPO

Höegh LNG Partners LP ("Partnership"), a Marshall Islands limited partnership formed by Höegh LNG Holdings Ltd. ("Company"), announced today that it has commenced an initial public offering of 9,

Floating Production: $1.2b Speculative FLNG Ordered

The floating production business continues to be very strong, particularly in the LNG gas processing sector.  Last month saw a speculatively ordered floating liquefaction plant – a $1.

ABS to Class the World's First CNG Ship

ABS announced it has been chosen to class the world's first compressed natural gas (CNG) carrier ordered by Pelayaran Bahtera Adhiguna, a subsidiary of Indonesia's

News

DNV Type Approved Anchor Winch for the Arctic Prowler

JK Fabrication has landed DNV certification for its 40-30-3000-DNV series Anchor Winch. Culminating a two-year process, JK’s C-series winch was at last awarded

HHLA Creates 50 Jobs at Container Terminal Burchardkai

  Hamburger Hafen und Logistik AG (HHLA) said it needs 50 additional commercial employees for the container terminal Burchardkai (CTB). The company continues

Condition-Based Engine Monitoring Systems for MAN B&W Engines

ClassNK to participate in a joint project together with Mitsui Engineering & Shipbuilding Co., Ltd. and MES Technoservice Co., Ltd. to support research into

Maritime Safety

US Coast Guard Travelling Inspectors' Centenary

July 2014 marked the 100th anniversary of the traveling inspection staff, originally created under the Steamboat Inspection Service. These travelers are highly

Pumps Reach Sinking Shrimper Just in Time

A commercial fishing vessel from Brownsville is slowly making its way back to port, thanks to some quick actions by its crew and Coast Guard units, informs the US Coastguard,

Resolve Maritime Academy's New Wet Trainer Facility

Resolve Maritime Academy says it has started on the construction of a new, two-story wet trainer, larger and more expansive than its original, the L/V Gray Manatee.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1763 sec (6 req/sec)