Nordic Yards to Build Deckhouse for Russian Icebreaker

MarineLink.com
Friday, August 09, 2013
Nordic Yards rendering of Icebreaker LK-25

Nordic Yards has been awarded the tender for the construction of a deckhouse for a Russian icebreaker. A contract for the fabrication of a deckhouse as part of the superstructure for the icebreaker LK-25 was concluded between the St. Petersburg Baltic Shipyard, which is part of the Russian state-owned United Shipbuilding Corporation OSK, and Germany's Nordic Yards. According to the terms of the contract, the deckhouse weighs 2,500 tonnes and is fully fitted out.
The keel-laying for the icebreaker "Viktor Tschernomyrdin", otherwise known as “Project 22600”, took place on October 10th, 2012 in dock at the Baltic Shipyard. The total cost of the project is around RUB 7.94 billion (about EUR 200 million). The delivery of the ship to the Russia’s state-owned seaports agency Rosmorport is planned for December 2015.


According to a statement by the First Vice-General Director of Baltic Shipyard, Artjom Pidnik, the high outfitting quality and modern comfort standards of the living quarters were the reasons for the decision in favor of Nordic Yards. The new icebreaker is designed for 90 specialists and a crew of 38, and offers them excellent on-board working conditions.

The icebreaker is equipped with a 25-megawatt (MW) diesel-electric propulsion system to provide the vessel with the capability to break ice up to two metres thick and ensure the free passage of ships in and out of frozen harbour basins and along the Northern Sea Route. It will also find use on rescue and salvage missions under Arctic conditions as well as on expeditions.

"We continue to be the best by far in icebreaker construction. Icebreakers are an exclusive niche product and we are at the forefront in the construction of these ships. Accordingly, the hull and mechanical engineering are reserved for us and some Russian subcontractors. But when it comes to on-board amenities, European yards have long been world champions and without doubt this contract will contribute to the success of the whole project," said Artjom Pidnik.

Nordic Yards in Germany said it is experienced in the construction of icebreaking ships. The shipyard can look back on more than 100 ice-going vessels constructed to date. In 2011, an Arctic tanker was handed over to the Russian mining and smelting company Norilsk Nickel. Construction of the two icebreaking salvage and rescue ships is due to start in 2013, the contracts for which were awarded by the Russian transport ministry in 2012. Moreover, Nordic Yards has experience in the construction of "4-star plus" cruise ships. "We look forward to this cooperative relationship and will contribute this experience while working alongside Russian suppliers in the construction of this deckhouse," said Nordic Yards’ owner and managing director Vitaly Yusufov.

nordicyards.com
 

  • Nordic Yards rendering of Icebreaker LK-25

    Nordic Yards rendering of Icebreaker LK-25

  • Nordic Yards rendering of Icebreaker LK-25

    Nordic Yards rendering of Icebreaker LK-25

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

MacGregor Wins RoRo Cargo Access Equipment Order

MacGregor has won an order from Daewoo Shipbuilding and Marine Engineering (DSME) in South Korea for the design and delivery of MacGregor RoRo cargo access equipment.

RWE Dea Awarded Two New Concessions in Egypt

In the International Bid Round 2013, RWE Dea has been awarded two new offshore concessions with operatorship by the Egyptian General Petroleum Corporation (EGPC).

Woodside Names LR Energy as Global Inspection Provider

Australia’s Woodside has signed on Lloyd’s Register Energy to act as its global inspection provider across a number of assets.Lloyd’s won the contract to provide surveillance inspection,

Shipbuilding

MacGregor Wins RoRo Cargo Access Equipment Order

MacGregor has won an order from Daewoo Shipbuilding and Marine Engineering (DSME) in South Korea for the design and delivery of MacGregor RoRo cargo access equipment.

World’s Largest Fast Crew Boat Christened at Incat

The 70-meter Fast Crew Boat (FCB) was christened Muslim Magomayev at a ceremony at the Incat shipyard on Monday, September 15. This is the first vessel that

Aiming to Make Less Fuel Go Further: Maersk Drilling

Maersk Drilling says it is engaged in an energy efficiency project for its newbuilds together with Maersk Maritime Technology. The project involves an Energy Management System (MSPS),

Naval Architecture

Robert Allen Designed Tug Launched in Italy

Rimorchiatori Riuniti bolsters Porto di Genova fleet with another Robert Allan Ltd. designed tug Rimorchiatori Riuniti currently operates five Robert Allan Ltd.

First-of-type Walk-to-Work Crewboat Launched

Incat Crowther announced the launch and sea trials of Muslim Magomayev, a first-of-type 70m Catamaran Fast Crew Boat (FCB). Constructed by Incat Tasmania, Muslim

Austal Delivers Fourth JHSV to the US Navy

The U.S. Navy accepted delivery of USNS Fall River (JHSV 4) from Austal USA yesterday, a week shy of six months from the date they took delivery of JHSV 3. This

News

MacGregor Wins RoRo Cargo Access Equipment Order

MacGregor has won an order from Daewoo Shipbuilding and Marine Engineering (DSME) in South Korea for the design and delivery of MacGregor RoRo cargo access equipment.

World’s Largest Fast Crew Boat Christened at Incat

The 70-meter Fast Crew Boat (FCB) was christened Muslim Magomayev at a ceremony at the Incat shipyard on Monday, September 15. This is the first vessel that

Continental Resources Names New President after Bott's Quick Exit

Continental Resources Inc, the largest oil producer in North Dakota's Bakken shale formation, promoted Jack Stark to president on Wednesday, less than a week after Rick Bott quit the position.

Arctic Operations

Upcoming Expo 'Offshore Marintec Russia'

ExpoForum Convention and Exhibition Centre in St. Petersburg, October 7-10  will host the International Specialised Offshore Exhibition and Conference 'Offshore

World’s Largest Iceberg Continues to Break Apart

The United States National Ice Center (NIC) named three new icebergs after a previous iceberg B15T broke into four pieces. B15T remains, while the resultant icebergs are named B15Z, B15AA and B15AB.

Arctic Wreck Found after 169 Years

After more than 169 years, Canadian researchers discovered one of the two ships from the doomed Arctic expedition of Sir John Franklin, cracking one of the largest mysteries in sea exploration.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2247 sec (4 req/sec)