Nordic Yards to Build Deckhouse for Russian Icebreaker

MarineLink.com
Friday, August 09, 2013
Nordic Yards rendering of Icebreaker LK-25

Nordic Yards has been awarded the tender for the construction of a deckhouse for a Russian icebreaker. A contract for the fabrication of a deckhouse as part of the superstructure for the icebreaker LK-25 was concluded between the St. Petersburg Baltic Shipyard, which is part of the Russian state-owned United Shipbuilding Corporation OSK, and Germany's Nordic Yards. According to the terms of the contract, the deckhouse weighs 2,500 tonnes and is fully fitted out.
The keel-laying for the icebreaker "Viktor Tschernomyrdin", otherwise known as “Project 22600”, took place on October 10th, 2012 in dock at the Baltic Shipyard. The total cost of the project is around RUB 7.94 billion (about EUR 200 million). The delivery of the ship to the Russia’s state-owned seaports agency Rosmorport is planned for December 2015.


According to a statement by the First Vice-General Director of Baltic Shipyard, Artjom Pidnik, the high outfitting quality and modern comfort standards of the living quarters were the reasons for the decision in favor of Nordic Yards. The new icebreaker is designed for 90 specialists and a crew of 38, and offers them excellent on-board working conditions.

The icebreaker is equipped with a 25-megawatt (MW) diesel-electric propulsion system to provide the vessel with the capability to break ice up to two metres thick and ensure the free passage of ships in and out of frozen harbour basins and along the Northern Sea Route. It will also find use on rescue and salvage missions under Arctic conditions as well as on expeditions.

"We continue to be the best by far in icebreaker construction. Icebreakers are an exclusive niche product and we are at the forefront in the construction of these ships. Accordingly, the hull and mechanical engineering are reserved for us and some Russian subcontractors. But when it comes to on-board amenities, European yards have long been world champions and without doubt this contract will contribute to the success of the whole project," said Artjom Pidnik.

Nordic Yards in Germany said it is experienced in the construction of icebreaking ships. The shipyard can look back on more than 100 ice-going vessels constructed to date. In 2011, an Arctic tanker was handed over to the Russian mining and smelting company Norilsk Nickel. Construction of the two icebreaking salvage and rescue ships is due to start in 2013, the contracts for which were awarded by the Russian transport ministry in 2012. Moreover, Nordic Yards has experience in the construction of "4-star plus" cruise ships. "We look forward to this cooperative relationship and will contribute this experience while working alongside Russian suppliers in the construction of this deckhouse," said Nordic Yards’ owner and managing director Vitaly Yusufov.

nordicyards.com
 

  • Nordic Yards rendering of Icebreaker LK-25

    Nordic Yards rendering of Icebreaker LK-25

  • Nordic Yards rendering of Icebreaker LK-25

    Nordic Yards rendering of Icebreaker LK-25

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Diana Extends Containership Time Charters

Diana Containerships Inc. announced direct continuation of time charter agreements for m/v Cap Domingo and m/v Cap Doukato   Diana Containerships Inc., a global

BMT Supports Samalaju Port Development

BMT subsidiaries in the Asia-Pacific region have been awarded a contract to provide design expertise for an advanced bulk-material handling system for the emerging port of Samalaju in East Malaysia.

EU: Ships Will Measure CO2 Emissions

Shippers to begin monitoring from 2018; Environmental groups say law is weak, shippers favorable. The shipping sector will for the first time have to monitor

Shipbuilding

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

MacGregor Deck Equipment for Intership's Eco-bulkers

MacGregor, part of Cargotec, has secured a deck equipment contract from New Times Shipyard in China for Intership Navigation Co Ltd.'s three new 36,500 dwt laker-class bulk carriers.

Naval Architecture

Production Begins on Sovcomflot’s New MPSV

Arctech Helsinki Shipyard started production of the new icebreaking multipurpose supply vessel   The production of the icebreaking multipurpose supply vessel

Glosten Designing Vigor’s Alaska Class Ferries

Glosten using Nupas-Cadmatic software for Vigor’s Alaska Class Ferry project   Seattle-based naval architecture consultancy Glosten has joined the list of North

Bollinger Delivers 11th FRC to the US Coast Guard

Bollinger Shipyards, Inc. has delivered the William Trump, the 11th Fast Response Cutter (FRC) to the United States Coast Guard.   The announcement was made by Bollinger Chief Operating Officer,

News

USCG Suspend Search for Crabber Near Anacortes, Wash.

The Coast Guard has suspended the search for a crabber reported overdue near Anacortes, Wednesday. Dean Harvey, 48, of Bremerton, remains missing. Search

Third Strike, Mansour Is Out

The M/V "MANSOUR M" with IMO number 7600586 has been banned for the 3rd time after subsequent detentions after the second refusal of access order in the Paris MoU region.

MHI Completes Development of "Sayaringo STaGE"

Mitsubishi Heavy Industries, Ltd. (MHI) has completed development of the "Sayaringo STaGE," a next-generation LNG (liquefied natural gas) carrier. The Sayaringo

Arctic Operations

MSC Approves SOLAS Amendments

SOLAS amendments to make IGF Code mandatory approved by Maritime Safety Committee   The International Maritime Organization’s (IMO) Maritime Safety Committee (MSC),

Production Begins on Sovcomflot’s New MPSV

Arctech Helsinki Shipyard started production of the new icebreaking multipurpose supply vessel   The production of the icebreaking multipurpose supply vessel

Strategy Can Maximize UKCS potential

Companies operating in the North Sea require a cultural shift to make the most of the its potential, according to a new report from Deloitte, the business advisory firm.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2036 sec (5 req/sec)