Russian Icebreaker to Norway for Upgrade

Barents Observer
Wednesday, May 23, 2012

Preparing for seismic mapping in the Barents Sea, the icebreaker "Dikson" is soon heading to Kirkenes, Norway, for equipment upgrades

Head engineer in the Sevmorgeo company, Yuri Kuzmin, confirms that the conventionally powered “Dikson” will spend 15 days in Kirkenes for the upgrade. Another icebreaker, the “Kapitan Dranitsyn” will undergo a similar upgrade in a yard in Murmansk, reports the 'Barents Observer'.

While the “Kapitan Dranitsyn” will engage in mapping of the seabed in order to collect data on the extension of the Russian Arctic shelf, it is expected that the “Dikson” will engage first of all in the collection of seismic data from the formerly disputed waters in the region. As previously reported, Russian authorities last year confirmed that Russian seismic studies would start in 2012 .

Norway started the mapping of is part of the newly delimited waters in summer 2011.

The upgrade of the “Dikson” will include the installation of satellite navigation equipment, as well as all necessary equipment for the seismic works, Kuzmin says. The vessel will head to sea at 1 August and return to its home base in late September or early October.

It is the first time Russia uses its diesel-run icebreaker for this kind of operations. For several years, the country has used the “Akademik Fyodorov ” research vessel assisted by nuclear-powered icebreakers in connection with shelf extension studies.



 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

Gas Prices Help Offset Statoil's Output Drop

Statoil's second quarter 2014 net operating income was NOK 32 billion, a decrease of NOK 2.3 billion compared to the second quarter of 2013. Adjusted earnings were NOK 32.

Energy

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

Gas Prices Help Offset Statoil's Output Drop

Statoil's second quarter 2014 net operating income was NOK 32 billion, a decrease of NOK 2.3 billion compared to the second quarter of 2013. Adjusted earnings were NOK 32.

Marine Equipment

Eliminating Cat Fines to Marine Diesel Engines

One can assume that P&I Clubs and shipowners would be very interested in preventing catastrophic Cat Fines damage to diesel engines. Cat Fines have been damaging

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

HydroComp to Hold Propeller 'Mini-Workshop'

A special version of HydroComp's intensive Propeller Workshops will be brought to Tampa before the start of IBEX 2014.   The Mini-Workshop is a special version

Vessels

MOL Commended with Quality Ship Awards

MOL Commended for ‘FY2013 Best Quality Ship Award’; MOL president Koichi Muto meets with captain and chief engineer, exchanging views and working to establish a more solid safe operation system.

Farstad Offshore Vessel Squadron Chartered Out

Farstad Shipping ASA reports the following charter contracts, with a total value (including options) of approximately NOK 1.75-billion, as follows: Inpex has awarded

Better Operational News from Fugro

Fugro says that (an as yet unidentified vessel) recently affected by a fire is back in operation. The total time out of operation amounted to seven weeks. Secondly,

Arctic Operations

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

House Subcommittee Hearing Highlights “Dismal State” of U.S. Icebreaking Capability

At the July 23, 2014, hearing of the House Subcommittee on Coast Guard and Maritime Transportation on “Implementing U.S. Policy in the Arctic” the committee chairman, Rep.

GTT Wins DSME Order for 9 More Icebreaking LNGCs

Gaztransport & Technigaz (GTT), a designer of membrane containment systems for the maritime transportation and storage of Liquefied Natural Gas (LNG), announced

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1369 sec (7 req/sec)