Arctech Launches Russian Icebreaking Rescue Vessel

MarineLink.com
Thursday, December 12, 2013
Photo: Arctech Helsinki Shipyard

Arctech launched the icebreaking multipurpose emergency and rescue vessel for the Russian Federal Agency of Sea and River Transport and to be operated by the FGI Gosmorspassluzhba (Russian Marine Emergency Rescue Service) on December 12, 2013 at Helsinki Shipyard. Baltika will be used in icebreaking, rescue and oil combating operations in the Gulf of Finland.

The vessel being built at Helsinki shipyard represents a completely new type of innovative technology. The vessel features an asymmetric hull, patented oblique design and three 360 degrees rotating propulsors, which allow the vessel to operate efficiently sideways, astern and ahead. In oblique mode the vessel will be able to generate 50 m wide channel in 0.6 m thick ice. Bow and stern first the vessel can operate in 1.0 m thick ice. The design of the vessel is based on ARC 100 concept, which has been developed by Aker Arctic Technology.

“It has been great to build the first-ever sideways operating icegoing vessel. I believe this vessel will be the benchmark when developing and building innovative Arctic vessels. The icebreaking multipurpose emergency and rescue vessel is technically advanced and building it has required a special knowledge”, comments the Managing Director of Arctech Helsinki Shipyard, Esko Mustamäki.

When the vessel is delivered, she will be used in the Gulf of Finland in icebreaking, rescue and oil combatting operations. The advanced oil recovery system is suitable for operation also in heavy waves. The vessel measures 76.4 m in length and 20.5 m in breadth. The three main diesel generator sets have the total power of 9 MW and the total propulsion power is 7.5 MW.

”This project is very important for Russian Federation. The building of this vessel and its future operation in the Gulf of Finland is a significant step in the co-operation between Finland and Russia”, commented the Head of the Federal Agency of Sea and River Transport Rosmorrechflot, Alexander Davydenko.

The vessel is being built in co-operation with Kaliningrad based Shipyard Yantar JSC, which has produced the blocks of the vessel. The hull assembly started in June 2013 at Helsinki Shipyard. In addition to hull assembly, design, outfitting and commissioning is done by Arctech. The vessel will be delivered to the customer in spring 2014.

arctech.fi
 

  • Photo: Arctech Helsinki Shipyard

    Photo: Arctech Helsinki Shipyard

  • Photo: Arctech Helsinki Shipyard

    Photo: Arctech Helsinki Shipyard

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Cecon Secures Finances to Complete Newbuild

Cecon ASA has petitioned for a debt restructuring agreement (in Norwegian: gjeldsforhandling). Certain funds managed by York Capital Management Global Advisors,

NMEA Updates Installation Standards

2014 edition of NMEA 0400, Version 4.00 features extensive updates and new information   The National Marine Electronics Association (NMEA) has published Edition 2014, Version 4.

HII Board of Directors Elects Two VPs

Huntington Ingalls Industries’ (HII) board of directors has elected Kellye Walker to serve as corporate vice president and general counsel and Charles R. “Chuck” Monroe Jr.

News

WSC CEO Koch to Retire in 2015

Chris Koch, current president and CEO of the World Shipping Council (WSC), will retire from his position on July 31, 2015, and WSC Senior Vice-President and General Counsel,

NMEA Updates Installation Standards

2014 edition of NMEA 0400, Version 4.00 features extensive updates and new information   The National Marine Electronics Association (NMEA) has published Edition 2014, Version 4.

Port of Galveston to Repair Public Pier

Galveston Wharves’ board of trustees today unanimously approved a project to repair pilings and pier deck in the Pier 19 area of the port. The board awarded the contract,

Vessels

Cecon Secures Finances to Complete Newbuild

Cecon ASA has petitioned for a debt restructuring agreement (in Norwegian: gjeldsforhandling). Certain funds managed by York Capital Management Global Advisors,

Waterjet-propelled Crewboat Delivered to Petrobras

BS Camburi, a 36-meter Monohull Crewboat built in Brazil by Arpoador Engenharia to the Petrobras type P2 specification has been launched and delivered.   Designed by Incat Crowther,

K Line to Expand Use of Eco-efficiency Software

Three further K Line vessels to install ClassNK-NAPA GREEN eco-efficiency software after reporting fuel savings during trials on an 8,600 TEU container vessel   NAPA

Arctic Operations

BSEE Attends Arctic Council Meeting

The Bureau of Safety and Environmental Enforcement’s (BSEE) David M. Moore recently traveled to Seattle, Wash., for a meeting of the Arctic Council Emergency Prevention,

RV Sikuliaq: Modern Electric Propulsion & Power Management

While ships have used electricity to help power vessels for a long time, new and sophisticated diesel-electric technologies are making serious gains in efficiency,

BigRoll Orders Two MC Class Vessels

BigRoll Shipping announced that COSCO Dalian Shipyard Co. Ltd has been contracted to build two more MC Class Module Carriers, bringing the total number of vessels under construction to four.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1804 sec (6 req/sec)