Arctech Launches Russian Icebreaking Rescue Vessel

MarineLink.com
Thursday, December 12, 2013
Photo: Arctech Helsinki Shipyard

Arctech launched the icebreaking multipurpose emergency and rescue vessel for the Russian Federal Agency of Sea and River Transport and to be operated by the FGI Gosmorspassluzhba (Russian Marine Emergency Rescue Service) on December 12, 2013 at Helsinki Shipyard. Baltika will be used in icebreaking, rescue and oil combating operations in the Gulf of Finland.

The vessel being built at Helsinki shipyard represents a completely new type of innovative technology. The vessel features an asymmetric hull, patented oblique design and three 360 degrees rotating propulsors, which allow the vessel to operate efficiently sideways, astern and ahead. In oblique mode the vessel will be able to generate 50 m wide channel in 0.6 m thick ice. Bow and stern first the vessel can operate in 1.0 m thick ice. The design of the vessel is based on ARC 100 concept, which has been developed by Aker Arctic Technology.

“It has been great to build the first-ever sideways operating icegoing vessel. I believe this vessel will be the benchmark when developing and building innovative Arctic vessels. The icebreaking multipurpose emergency and rescue vessel is technically advanced and building it has required a special knowledge”, comments the Managing Director of Arctech Helsinki Shipyard, Esko Mustamäki.

When the vessel is delivered, she will be used in the Gulf of Finland in icebreaking, rescue and oil combatting operations. The advanced oil recovery system is suitable for operation also in heavy waves. The vessel measures 76.4 m in length and 20.5 m in breadth. The three main diesel generator sets have the total power of 9 MW and the total propulsion power is 7.5 MW.

”This project is very important for Russian Federation. The building of this vessel and its future operation in the Gulf of Finland is a significant step in the co-operation between Finland and Russia”, commented the Head of the Federal Agency of Sea and River Transport Rosmorrechflot, Alexander Davydenko.

The vessel is being built in co-operation with Kaliningrad based Shipyard Yantar JSC, which has produced the blocks of the vessel. The hull assembly started in June 2013 at Helsinki Shipyard. In addition to hull assembly, design, outfitting and commissioning is done by Arctech. The vessel will be delivered to the customer in spring 2014.

arctech.fi
 

  • Photo: Arctech Helsinki Shipyard

    Photo: Arctech Helsinki Shipyard

  • Photo: Arctech Helsinki Shipyard

    Photo: Arctech Helsinki Shipyard

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Scorpio Tankers Receive 7 More Newbuildings

Scorpio Tankers Inc. say it has recently taken delivery of seven newbuilding vessels as follows: STI Madison and STI Park, LR2 product tankers, were delivered

LHA 6 'America' Maiden Voyage Completes at San Diego

The Navy informs that the soon to-be-commissioned amphibious assault ship 'USS America' (LHA 6) arrived at its homeport of San Diego after completing its two-month

Austal Delivers Fourth JHSV to the US Navy

The U.S. Navy accepted delivery of USNS Fall River (JHSV 4) from Austal USA yesterday, a week shy of six months from the date they took delivery of JHSV 3. This

News

Bangladeshi Albedo Survivors Helped by their Govt.

Yesterday, 16th September 2014, Chirag Bahri, MPHRP's Regional Director for South Asia, attended a ceremonial event organised by the Ministry of Shipping, Bangladesh

Simmons Assumes Command of USS James E. Williams

Capt. Anthony L. Simmons relieved Cmdr. Curtis B. Calloway as commanding officer of the guided-missile destroyer USS James E. Williams (DDG 95) at sea on Sept.

CEVA Opens European Center of Logistics Excellence

CEVA Logistics, a leading global supply chain management company, today announced the opening of its first Center of Logistics Excellence in Europe. Situated in Ashby de la Zouch,

Vessels

Fifth Jackup Contract for Keppel from Gulf Drilling

Keppel FELS Limited, a wholly owned subsidiary of Keppel Offshore & Marine, has secured a contract from Gulf Drilling International Ltd. of Qatar to build a

Fugro Takes Delivery of 2nd Coastal Survey Vessel from Damen

Fugro yesterday took delivery of its second of the three Fugro Offshore Coastal Survey Vessels (FOCSV) being built by Damen. The Fugro Pioneer is a compact,

Austal Delivers Fourth JHSV to the US Navy

The U.S. Navy accepted delivery of USNS Fall River (JHSV 4) from Austal USA yesterday, a week shy of six months from the date they took delivery of JHSV 3. This

Arctic Operations

Maritime Academy Awarded DHS Grant for Arctic Training

Maine Maritime Academy receives $450,000 grant From U.S. Department of Homeland Security for ice navigation and maritime first responder courses for the Arctic Maine

PPG Offers SIGMASHIELD 1200 Coating for Shipping

PPG Industries' protective and marine coatings business is fulfilling growing demand for "ice class" marine coatings for hull protection with SIGMASHIELD® 1200 coating.

Vard Orders Rolls-Royce Equipment for Rem OCV/AH

Rolls-Royce has won a £19m contract with the Norwegian shipbuilding group Vard to deliver deck machinery, propulsion and engines to a new offshore construction

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1731 sec (6 req/sec)