LCS MCM MP Puts Navy Closer to Fleet Implementation

By Joseph R. Fonseca
Thursday, August 21, 2014
It’s All in the Package the Littoral Combat Ship’s Mission Modules

NSWC Panama City hosted a two-week demonstration in July that verified Sailors' ability to conduct maintenance on the Littoral Combat Ship's Mine Countermeasure Mission Package without the assistance of civilian scientists or engineers.
 

The Littoral Combat Ship Mine Countermeasure Mission Package (LCS MCM MP) Sustainment Demonstration (S-Demo) puts the Navy a step closer to transitioning mine countermeasure mission modules to the fleet, offering Joint Force Commanders mine detection and neutralization capability that does not put ships at risk in minefields.
 
The LCS MCM mission package conducts its mine countermeasures operations through the employment of aviation assets and unmanned surface, semi-submersible, and submersible vehicles, equipped with an array of sensors and systems to detect, localize, neutralize, and sweep mines. These systems are designed to be employed while the LCS remains outside the mine threat area.  Future mission package increments add capability, including beach zone mine detection, mine sweeping, near surface mine neutralization, and buried and surf zone mine detection.
 
"The purpose of the S-Demo is to identify gaps in training, processes, and procedures to make sure gaps are minimized for future operations and support," said Michelle Parker, NSWC PCD S-Demonstration Test Team.
 
During the demonstration, Sailors assigned to operate and maintain the MCM package, the Littoral Combat Ship Squadron (LCSRON) Mission Package detachment, followed systems and processes in place to perform maintenance tasks on the deployable LCS mine countermeasures equipment, while civilian scientists and engineers collected data. The data gathered will help to improve maintenance processes Sailors will use while on deployment.

"It's our way of ensuring the requisite amount of technical rigor is in place to ensure program success, because at the end of the day we must provide a safe and effective solution to the Fleet," said Ed Stewart, NSWC Panama City Technical Director.
 
By better estimating the actual time required to perform corrective and preventative maintenance, the sailors have more accurate data when calculating the time necessary to clear a minefield or complete a specific tactic at sea.
 
"At some point during development, a system will go through what is called a Maintainability Demonstration (M-Demo)," said Peter Halvorson, Lead for Integrated Logistics Support at NSWC Panama City.  "It is an event where failures are intentionally introduced into the system to see if trained Sailors can use the written repair procedures (technical manuals) to fix it. This proves out the quality of both training and technical documentation.  We're taking this a step further for the LCS MCM MP.  We are starting our event with the process leading up to the repair - who gets called, what forms/documentation are filed electronically to alert someone that there is a failure, etc."
 
Halvorson said a "reach back" process was added to the event, so that if trained Sailors are unable to fix the problem with the technical procedures provided, they are trained to "reach back" into the support infrastructure, typically the Mission Package Support Facility or an In-Service Engineering Agent, and ask for an extra level of expertise to help troubleshoot and fix the failed component.
 
-NAVSEA-
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

HMS Prince of Wales Bridge Sets Sail

The bridge section of the second Queen Elizabeth Class aircraft carrier set sail today from Glasgow on its first sea voyage to Rosyth.   Upper Block 07 is where

The German Shipbuilding Rebound

German shipbuilding has made a significant turnaround. The country’s shipbuilding industry has seen increases in the number of employees, orders and deliveries compared to 2013,

News

Goliat FPSO in Norway

The Goliat FPSO was successfully floated off the heavy-lift vessel, Dockwise Vanguard, in the fjord outside Hammerfest, says Eni Norge    The Goliat platform has arrived in Hammerfest,

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

Long Beach, Los Angeles ports host forum to gather input

More than 100 cargo owners, trucking firm leaders, longshore labor, marine terminals and other goods movement industry representatives turned out Wednesday for

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1482 sec (7 req/sec)