Martek Introduces Compact BNWAS for Smaller Vessels

MarineLink.com
Wednesday, June 12, 2013

Martek Marine, U.K.-headquartered manufacturer of maritime safety systems, announced the launch of a Lloyd’s Register MED-approved BNWAS designed specifically for smaller bridges to meet the next stage of BNWAS implementation starting in July of this year. BNWAS regulations state that existing cargo vessels between 500-3000GT must be compliant by July 2013 and vessels between 150-500GT by July 2014.

The Navgard Mini offers the same functionality as Martek’s Navgard system in a more compact all-in-one-box unit. Navgard Mini is the only system available which has all IMO-compliant alarms and reset switches in a single enclosure, making it very simple to retrofit on the smaller bridges of tugs, OSVs and lower-capacity passenger vessels – the system simply requires a power supply to deliver full compliance with SOLAS regulation.

Existing systems require a button to be pushed to confirm the crew’s presence on the bridge. IMO legislation dictates that BNWAS systems’ first stage alarm must sound between every three to 12 minutes. If the reset button is not pressed, the second stage will activate after 15 seconds. If the button is still not pushed, the third alarm will sound between every 90 to 180 seconds.

Although effective in theory, there have been several incidents, including the grounding of MV Karin Schepers in 2009, on vessels which have had BNWAS installed but switched off, as crew have simply found it too demanding to continue with other necessary work while being disturbed by such frequent alarms and the requirement to push a button so regularly.

Martek has addressed this issue in several ways. Firstly, with the inclusion of the market’s first passive infrared (PIR) motion sensor. This is built in to the device’s panel and detects movement on the bridge. No alarm sounds as long as movement is detected on the bridge, and crew can work undisturbed. Only when the system detects no movement for a set time, between the IMO’s mandated three and 12 minutes, will the alarms sound. Because the PIR sensor is part of the panel, no extra installation is required and no additional wiring is needed, reducing the cost, installation time and space needed.

The second important feature is the password deactivation, also built in to the panel. Where BNWAS models have traditionally been turned off by a simple key, the Navgard Mini can only be deactivated by password. This increases accountability by giving the vessel’s Master the sole responsibility for the device’s operation. The system, which comes with a two-year warranty, also uses real-time data logging, providing essential evidence in the event of an incident and recording when the system is switched on and off so that checks can be made to ensure it is being used continuously.

Martek has compiled a BNWAS buyers’ guide with key questions and points for consideration with a comparison table, which is available here.
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

Naming Ceremony of Evergreen's EVER LYRIC

Evergreen Group today held the naming ceremony for EVER LYRIC, the eighth of its L-type vessels built by CSBC Corporation in Taiwan. The ceremony took place

MacGregor's Pusnes bow loading systems for Suezmax Tankers

MacGregor, part of Cargotec, has secured contracts to supply Pusnes bow loading systems for three newbuild shuttle tankers intended for operations in Brazilian waters.

Ancasta to Launch Prestige 680

Ancasta International Boat Sales is in the process of launching the Prestige 680, the newest luxury motor yacht from Prestige, which will have its world premiere at Cannes in September 2015.

Marine Electronics

Caterpillar Acquires ESRG Technologies

Caterpillar Marine has completed the acquisition of ESRG Technologies Group, LLC, a vessel monitoring and data analytics company in the marine industry.   The

AVEVA Launches Software Upgrade

New releases of AVEVA Electrical and AVEVA Instrumentation provides powerful new functionality for engineering teams   AVEVA announced new productivity enhancements

Dual Accreditation for VSTEP DP Simulators

In a timespan of one month, three types of VSTEP Dynamic Positioning Simulators have been officially certified and accredited by the Nautical Institute and Det

Navigation

Scandlines Enhance Puttgarden-Rødby Route Capacity

Scandlines has deployed the M/V Mercandia VIII ferry in order to increase the capacity for the following months, while the passenger ferry M/V Prinsesse Benedikte is at the yard.

Transas integrates Shipping Guides Port Data

Transas Marine has teamed up with Shipping Guides Ltd (UK) to incorporate port data within the Transas Navi-Planner 4000. Having detailed information on ports

Ships 10% Less Fuel Efficient Than Those Built in 1990

New ships today are no more efficient than they were over twenty years ago, despite shipping industry claims to the contrary. The efficiency of new ships has deteriorated

Electronics

Caterpillar Acquires ESRG Technologies

Caterpillar Marine has completed the acquisition of ESRG Technologies Group, LLC, a vessel monitoring and data analytics company in the marine industry.   The

AVEVA Launches Software Upgrade

New releases of AVEVA Electrical and AVEVA Instrumentation provides powerful new functionality for engineering teams   AVEVA announced new productivity enhancements

Caterpillar Acquires ESRG Technologies Group

Caterpillar Marine has announced  it has completed the acquisition of ESRG Technologies Group, LLC, a vessel monitoring and data analytics leader in the marine industry.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0964 sec (10 req/sec)