ESAB Introduces SVHC for Plasma Arc Cutting

press release
Monday, April 09, 2012

ESAB Cutting Systems continues its long history of plasma cutting system innovation with the new Smart Voltage Height Control (SVHC) system. 

 

SVHC improves plasma cut quality and maximizes plasma consumable life by automatically compensating for electrode wear.  By integrating a number of plasma and CNC features that have existed for many years, this new system lets plasma users receive maximum value from their cutting machines, improving performance and driving down the total cost of production.

 

The SVHC system utilizes ESAB’s PB-MB-1 plasma torch station, and integrates capabilities from the arc-voltage sample & hold feature pioneered by ESAB in the 1990s, and the electrode wear detection system patented by ESAB in 1998.  The torch station features pneumatically balanced tool-tip sensing, magnetic breakaway crash protection, and an encoder for accurate Z-axis position control.  The Pneumatically Balanced Magnetic Breakaway torch holder allows accurate initial height sensing.  It is combined with an electrical touch-sensor that also detects when the torch is in contact with the plate.  This dual-sensor system provides the most accurate sensing of the plate surface, which is used as the reference for initial cutting height. 

 

The SVHC system uses an encoder in the z-axis to precisely control the torch height for initial piercing and cutting height.  Once the torch has fired and moved down to its cutting height, the arc voltage is electronically measured and digitized.  The system then switches to arc voltage height control, and maintains that same voltage throughout the remainder of the cut. 

 

By sampling and holding the voltage after every pierce, SVHC keeps the nozzle to plate distance constant throughout the life of the electrode.  On a standard arc voltage control system, the torch will cut closer to the plate as the electrode wears.  This changes the cut quality, and eventually causes torch crashes and premature consumable changes.  SVHC maintains consistent cut quality even as the electrode wears by keeping the nozzle the same distance from the plate.  This also allows the electrode to be fully used before change out.

 

Controlling the SVHC system is simplified with ESAB’s Vision T5 touch-screen based CNC.  This easy-to-learn controller features a built-in process database that simplifies plasma torch setup through a simple touch-screen process selector. It also integrates perfectly with ESAB’s m3 plasma system, which features the most advanced gas control system in the industry.  The operator simply selects the material type and thickness, and the Vision T5 CNC automatically selects and mixes the optimal start, cut and shield gas combination, then displays a picture and part number for the each of consumables that is needed.

 

SVHC is integrated tightly with the Vision T5, which gives the operator visual feedback from all of the peripheral devices.  The Vision T5 displays the actual and measured arc voltage for each plasma station.  It also shows the amount of arc voltage correction, giving the operator a visual indication of electrode wear so he can see when the consumables need to be changed.

 

SVHC operation is simple and automatic, and requires no special operating procedures.  Once enabled, SVHC automatically compensates for electrode wear without any intervention. SVHC is available with all ESAB CNC plasma shape cutting machines equipped with ESAB’s m3 Plasma™ systems.  Power supplies are available featuring 200 Amps, 360 Amps, 450 Amps, or 600 Amps.  Each of these rugged power supplies is capable of 100% duty cycle and features CNC controlled output current for improved starting and extended consumable life. 

 

Depending on the configuration, the system can pierce and cut mild steel up to 2” thick when using ESAB’s XR Series Nozzles for the PT-36 torch. Only ESAB offers fully integrated plasma cutting and process control, all operated through the Vision T5 CNC.  As the technology leader in machine and process automation and the only total system supplier, ESAB is uniquely qualified to integrate the entire plasma cutting process.  By integrating arc voltage height control, Z-axis motion control, and complete plasma process control, ESAB leads the way to higher productivity and lowest overall cost-per-part. ESAB Welding & Cutting Products is one of the world’s largest and most experienced manufacturers of welding and cutting equipment and welding filler metals.

 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

WCI Applauds Increased USACE Funding

Today WCI applauded the leadership of Senate Appropriations Committee Chairman Thad Cochran (R-MS) and Senate Energy & Water Development (E&WD) Appropriations Subcommittee

SoCal Beach Cleanup Could Take Months

The U.S. Coast Guard captain overseeing cleanup of oil spilled from a pipeline rupture that closed two California state beaches and fouled offshore waters near

MPC Honors Crowley for Tank Vessel Safety

Crowley Maritime Corporation’s petroleum services division has once again been honored by Marathon Petroleum Company (MPC) with its annual Elite Vessel Award, which

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

Ship Repair & Conversion

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

Marine Equipment

DMW Marine Takes the Lead in Military Cranes

DMW Marine Group, LLC. has completed a number of projects for the U.S. Navy and foreign Navies in recent years, claiming a place as a go-to supplier for Navy departments globally.

Protea to Launch Heavy-Lift Cranes at Nor-Shipping

Protea, a global manufacturer of offshore handling equipment, will launch two types of heavy lift cranes at Nor-Shipping 2015 in Oslo, June 2-5. Tomasz Paszkiewicz,

Long Beach Port to Set-up Peak Relief Chassis Fleet

The Port of Long Beach will seek bids on the creation of a new fleet of truck chassis for peak periods of the year, complementing the existing equipment used

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3756 sec (3 req/sec)