BP released the findings of its internal investigation into the Deepwater Horizon explosion and oil leak in the Gulf of Mexico. The company said no single factor caused the Macondo well tragedy. Rather, a sequence of failures involving a number of different parties led to the explosion and fire which killed 11 people and caused widespread pollution in the Gulf of Mexico earlier this year.

A report released by BP concluded that decisions made by “multiple companies and work teams” contributed to the accident which it says arose from “a complex and interlinked series of mechanical failures, human judgments, engineering design, operational implementation and team interfaces.”

The report – based on a four-month investigation led by Mark Bly, BP’s Head of Safety and Operations and conducted independently by a team of over 50 technical and other specialists drawn from inside BP and externally – found that:
•    The cement and shoe track barriers – and in particular the cement slurry that was used – at the bottom of the Macondo well failed to contain hydrocarbons within the reservoir, as they were designed to do, and allowed gas and liquids to flow up the production casing;
•    The results of the negative pressure test were incorrectly accepted by BP and Transocean, although well integrity had not been established;
•    Over a 40-minute period, the Transocean rig crew failed to recognise and act on the influx of hydrocarbons into the well until the hydrocarbons were in the riser and rapidly flowing to the surface;
•    After the well-flow reached the rig it was routed to a mud-gas separator, causing gas to be vented directly on to the rig rather than being diverted overboard;
•    The flow of gas into the engine rooms through the ventilation system created a potential for ignition which the rig’s fire and gas system did not prevent;
•    Even after explosion and fire had disabled its crew-operated controls, the rig’s blow-out preventer on the sea-bed should have activated automatically to seal the well. But it failed to operate, probably because critical components were not working.
Commenting on the report, BP’s outgoing chief executive Tony Hayward said: “The investigation report provides critical new information on the causes of this terrible accident. It is evident that a series of complex events, rather than a single mistake or failure, led to the tragedy. Multiple parties, including BP, Halliburton and Transocean, were involved.

“To put it simply, there was a bad cement job and a failure of the shoe track barrier at the bottom of the well, which let hydrocarbons from the reservoir into the production casing. The negative pressure test was accepted when it should not have been, there were failures in well control procedures and in the blow-out preventer; and the rig’s fire and gas system did not prevent ignition.

“Based on the report, it would appear unlikely that the well design contributed to the incident, as the investigation found that the hydrocarbons flowed up the production casing through the bottom of the well.”
 
BP’s incoming chief executive Bob Dudley said: “We have said from the beginning that the explosion on the Deepwater Horizon was a shared responsibility among many entities. This report makes that conclusion even clearer, presenting a detailed analysis of the facts and recommendations for improvement both for BP and the other parties involved. We have accepted all the recommendations and are examining how best to implement them across our drilling operations worldwide.

“This was a tragic accident that resulted in the loss of 11 lives and impacted the communities and the environment along the Gulf Coast region. We deeply regret this event. We have sought throughout to step up to our responsibilities. We are determined to learn the lessons for the future and we will be undertaking a broad-scale review to further improve the safety of our operations. We will invest whatever it takes to achieve that. It will be incumbent on everyone at BP to embrace and implement the changes necessary to ensure that a tragedy like this can never happen again.”

Based on its key findings, the investigation team has proposed a total of 25 recommendations designed to prevent a recurrence of such an accident. The recommendations are directed at strengthening assurance on blow-out preventers, well control, pressure-testing for well integrity, emergency systems, cement testing, rig audit and verification, and personnel competence.

The company said it expected a number of the investigation report’s findings to be considered relevant to the oil industry more generally and for some of the recommendations to be widely adopted.

BP said the report was based on information available to the investigating team. It noted that additional relevant information may be forthcoming, for example, when Halliburton’s samples of the cement used in the well are released for testing and when the rig’s blow-out preventer is fully examined now that it has been recovered from the sea-bed. There will also be additional information from the multiple ongoing US government investigations.

The investigation report and a video are available online at: www.bp.com
 

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Colfax to Supply Pumps for Massive Heavy-lifting Ship

Colfax Fluid Handling, a business of Colfax Corporation, was awarded a contract as the exclusive supplier of hydraulic pumps for a ship capable of lifting the topside

Atlantic Offshore and Ocean Response

Multi-role Rescue Vessel (MRV) and Platform Supply Vessel (PSV) specialist Atlantic Offshore recently took its active fleet number to 19 vessels (six newbuilds are also under construction),

Norwegian Software Improves Efficiency for Offshore Divers

Norwegian software company Tero Marine developed a new solution that they say will reduce workload and help improve safety for offshore divers. “It has enabled

Casualties

Coast Guard Evacuate 78 From Blazing Fishing Vessel

Crewmembers aboard the 314-ft fishing vessel 'Arctic Storm' extinguised an engine-room fire using the ship's Halon chemical firefighting system. The Coast Guard

Costa Concordia: Board Members Under Investigation

Five board members of owners, Costa Crociere, have been placed under investigation in connection with the January 2012 cruise ship accident. The executives are

Passenger Ship Grounded off Scotland Coast

The passenger ship 'Serenissima' grounded Monday night in Oban Bay, was refloated the next day & awaits underwater inspection. The UK Maritime and Coastguard Agency

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright