Russian LNG Carrier Launched

Press Release
Thursday, January 24, 2013
LNG carrier 'Velikiy Novgorod': Photo credit SCF

Sovcomflot’s new state-of-the-art LNG carrier 'Velikiy Novgorod' launched from STX Offshore & Shipbuilding shipyard.

The Velikiy Novgorod was ordered by OAO Sovcomflot for operations under a long-term agreement with Gazprom Global LNG (part of Gazprom) as the first of two vessels ordered by SCF from STX Offshore & Shipbuilding Co. Ltd and her construction is scheduled to be completed in December, 2013. At the end of June, 2012, a steel cutting ceremony was held for the second gas carrier in the same series, Pskov, which is due to be delivered in 2014.

These state-of-the-art Ice2 (C1) Atlanticmax class gas carriers have a cargo capacity of around 170,000 cubic metres and are designed and equipped for navigation in challenging icy conditions. This makes them capable of transporting gas on a year-round basis from practically any existing LNG terminal in the world, including Russia’s first LNG project Sakhalin-II.

Seven years ago, SCF began to use its own gas carriers for the transportation of liquefied natural gas (LNG); successfully breaking in to a new market segment that was previously inaccessible to Russian companies. SCF gas carriers operate all over the world, including all main regions of LNG production and consumption. These vessels are engaged in operations on various Russian and international projects involving LNG transportation and transhipment (including ship-to-ship).

The SCF fleet includes 8 LNG and LPG carriers which are engaged in both Russian and international projects. A further six gas carriers are under construction as part of a long-term time charter agreement with the world’s largest oil & gas companies.


Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Pressure for Australia Sub Deal Grows

Australia to spend A$65 bln on ships and subs over 20 years; PM pledges A$40 bln for domestic shipbuilders. Australia will spend A$89 billion ($65 billion) on

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

LNG Ferry Construction for Tallink Begins

The start of production of Tallink's new generation LNG powered fast ferry for the Tallinn-Helsinki route was celebrated on the 4th of August 2015 at Meyer Turku shipyard.

LNG

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

Egypt Gets FSRU from BW Gas

Norway-based BW Gas will provide Egypt with a liquefied natural gas (LNG) floating import terminal under a five-year contract.   This comes as as the North African

Tanker Retrofitted with Dual Fuel Engine

Caterpillar Marine informs it has begin a dual fuel engine retrofit conversion onboard the 472-foot Fure West tanker, owned by Furetank Rederi A/B. The MaK M 43

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1457 sec (7 req/sec)