Damen Launches its Longest (120m) Pontoon Ever

(MarineLink)
Wednesday, May 23, 2012
File Damen Shipyards announced that it launched the first of its newly designed Stan Pontoon (SPo) 12032. The SPo 12032 is the longest pontoon ever built by Damen (120m) and part of a series of 34 pontoons currently being built.
Damen Shipyards announced that it launched the first of its newly designed Stan Pontoon (SPo) 12032. The SPo 12032 is the longest pontoon ever built by Damen (120m) and part of a series of 34 pontoons currently being built.

Damen Shipyards announced that it launched the first of its newly designed Stan Pontoon (SPo) 12032. The SPo 12032 is the longest pontoon ever built by Damen and part of a series of 34 pontoons currently being built. In addition, Damen Pontoons & Barges has started building a second new design: the Damen Crane Barge (CBa) 6324, a transshipment barge for handling dry bulk and container operations.
The 120 m x 32.2 m Stan Pontoon was launched at Jiangsu Ganghua Shipyard, one of Damen’s Chinese partner yards. With a deck strength of 20 t/sq. m., its heavy duty deck is suitable for heavy RoRo operations. The pontoon’s ballast system includes Econosto valves and Azcue pumps. Furthermore, the SPo 12032 is equipped with two DMT-winches, a Van der Leun electrical system (incl. a Caterpillar generating set), an International Paint system and it is classified under Lloyd’s Register. Together with 16 smaller pontoons (varying between 41 x 13 m – 91 x 27 m), the new pontoon will arrive in the Netherlands in September 2012 on a semi-submersible vessel.

New Damen Crane Barge
Damen’s newly designed crane barge is called the CBa 6324. It’s a shallow draft transshipment barge (optionally self-propelled) able to on- and offload ship-to-ship and ship-to-quay and vice versa. The CBa 6324 (i.e. 63m x 23,5m) is outfitted with a Liebherr CBG 350 crane with a grab load capacity of 35 t @ 12-36m and a hook load capacity of 45 ton @ 12-36m. The average throughput will be around 20.000 T a day.  There’s accommodation for 12 crew, incl. a pantry, a change room, an office and of course cabins. Several of these new transshipment barges are currently being built, with the first ready for delivery in November 2012 (The Netherlands) and the second in December (China). Crane Barges 3 and 4 will be available in Q1-2013.

 

Damen’s newly designed crane barge is called the CBa 6324.
Damen’s newly designed crane barge is called the CBa 6324.
Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Intertek Opens Malaysian Exploration and Production Center

Intertek invested £900,000 (4,143,720 Malaysian Ringgit) in a new Malaysian regional center which will bring enhanced services to the exploration and production (E&P) sector in the region.

Kraken Completes U.S. Navy Sonar Trials

Kraken Sonar Systems Inc. announced that its Cooperative Research and Development Agreement (CRADA) with the U.S. Navy’s Naval Undersea Warfare Center (NUWC) in Newport, Rhode Island was successful.

MHI : Landmark LNG Carrier Shipbuild Contract

On May 17, 2013, Mitsubishi Heavy Industries Ltd. (MHI) will sign an agreement with Mitsui O.S.K. Lines Ltd. (MOL) to build a Sayaendo series new-generation liquefied natural gas (LNG) carrier.

Shipbuilding

Keel Authenticated for Ingalls’ Fifth National Security Cutter

Huntington Ingalls Industries' (HII) Ingalls Shipbuilding division authenticated the keel of the company's fifth U.S. Coast Guard National Security Cutter, James (WMSL 754).

USCG Contracts HII to Build Sixth National Security Cutter

The U.S. Coast Guard awarded a fixed‐price incentive firm target contract valued at approximately $487.1 million to Huntington Ingalls Industries for the production

Conrad Shipyards Earn Two Safety Awards

Conrad Shipyard, L.L.C. has received the 2012 Award for Excellence in Safety as well as the Award for improvement in Safety by the Shipbuilders Council of America (SCA).

Workboats

Subchapter M Looms Operators and Suppliers Respond

Amelia Island, Florida: At the second annual Workboat Exchange, held in April at the Ritz Carlton Hotel on beautiful Amelia Island, Florida, about 160 marine buyers

JonRie Supplies Equipment for New Great Lakes ASD

JonRie InterTech was commissioned for the supply of deck equipment for the new ASD Aura from Great Lakes Shipyard, Cleveland, Ohio. The new Tug is a Jensen designed

Damen Begins 14 Terminal Tugs for Kuwait Oil Co.

The Asymbolickeel-laying ceremony on the April 17, 2013 in Gorinchem, The Netherlands, officially launched the construction phase of 14 Damen ASD Tugs for Kuwait Oil Company (KOC).

Deck Machinery

Deepwater Heavy Lift Crane Orders for Cargotec

Cargotec's MacGregor contracted by Hornbeck Offshore Services Inc. to deliver 4 AHC cranes for 4 multi-purpose supply vessels (MPSV).   The cranes will be delivered

MTR100: Subsea Industry Awards Deadline Approaching

The July / August 2013 edition of Marine Technology Reporter will once again feature the MTR100, profiles of 100 leading companies in the global subsea sector. This editorial feature is free,

Earnings Advance at Ace Winches

ACE Winches announced post tax profits of £6.2m for 2012, a 15% increase on the previous year.  Turnover at the Aberdeenshire-based group soared to £31.1m in the year ended October 31,

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright