World First: Hyundai Samho Launches LNG Carrier Built On-ground

MarineLink.com
Monday, October 07, 2013
Arial view of launching LNG Carrier built on-ground

Hyundai Samho Heavy Industries (HSHI), a shipbuilding affiliate of Hyundai Heavy Industries, the world’s biggest shipbuilder, successfully launched a 162,000 m3 LNG carrier built using the on-ground shipbuilding method for the first time in the world, the shipyard claims.


The vessel, designed for delivering chilled natural gas, was ordered by Golar of Norway in February, 2012. It, measures 289 x 45.6 m with a 26 m depth, and is scheduled to be handed over to the owner by late July 2014 after outfitting and painting work. 


After about 270 large blocks, LNG containment system, an engine, a propeller are manufactured and assembled in the on-land shipbuilding area equipped with a 1,200-tonne gantry crane, four jib cranes and a floating dock, the assembled LNG carrier is loaded out onto a floating dock by hydraulic skidding, then the LNG ship is launched out by submerging the floating dock. Striking balance of the LNG carrier, which is about 30% heavier than other type of ships, on the hydraulic skidding facility and on the floating dock is the critical point of launching. 


Though this is the first LNG carrier Hyundai Samho has built using the on-ground method, the company has already built 50 other ships using this method since May 2008.


Since on-ground shipbuilding method allows higher productivity and cost effectiveness, facilitates efficient utilization of yard facilities and resources, and improves the safety of working conditions, Hyundai Samho Heavy Industries plans to build 10 of 12 LNG carriers in its order book using this method. 
 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Info-X Invests in $5m Headquarter Expansion

Transportation solutions provider capitalizes on outsourcing trend Info-X Software Technology, provider of software solutions and back-office support to U.S.

Daihatsu Joins ClassNK Research Project

Classification society ClassNK announced that it will embark on a joint research project together with Daihatsu Diesel Mfg. Co., Ltd. Through the partnership, ClassNK

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

Technology

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

Kongsberg to Supply FPSO Safety System

Kongsberg Maritime Engineering (KME), the wholly owned Engineering, Procurement and Construction (EPC) subsidiary of global maritime technology developer Kongsberg Maritime,

Shipbuilding

Keel Laid for Holland America Line’s New Ship

Holland America Line celebrated the keel laying of its new 2,650-guest Pinnacle Class ship on August 22 at Fincantieri’s Marghera shipyard in Italy. A 680-ton block

Jones Act is Critical to Conn. Economy

Study shows Connecticut shipbuilding industry worth $2.5 billion to state’s economy, supports nearly 23,000 jobs The American Maritime Partnership (AMP) joined

CWind Launches New Vessel

CWind, a provider of integrated services to the offshore wind industry, has launched its new vessel CWind Fulmar in a naming ceremony in Brightlingsea. The CWind Fulmar, built by CTruk Ltd.

LNG

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

SHIPPINGInsight Extends Early-bird Registration

SHIPPINGInsight 2014 is extending the deadline for early-bird registration to Sept. 15. Attendees registering online at www.shippinginsight.com/choose-event prior to midnight Sept.

LNG Finalizes Acquisition of Bear Head LNG Project

Liquefied Natural Gas Limited today informed having finalised the acquisition of 100% of Bear Head LNG Corporation (BHLC). This follows the announcement

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2398 sec (4 req/sec)