WW II Liberty Ship Leak-free after 70 Years

By David Gibbons
Wednesday, June 25, 2014
The John W. Brown

Seventy years later and still leak-free: World War II Liberty Ship tests longevity of grooved piping systems

To address the sudden need for supplies overseas during World War II, the United States government launched the Emergency Shipbuilding Program in 1941 that resulted in the construction of more than 5,700 cargo ships for the U.S. Maritime Commission. 2,710 of these vessels were of a design that became known as Liberty ships. These vessels were designed as economically and quickly built cargo steamers that formed the backbone of a massive sealift of troops, arms, materiel and ordnance to every theater of the war. Two-thirds of all cargo that left the U.S. during the war was shipped on Liberty ships. From beans to bullets and, in some cases, troops, each ship carried almost 9,000 tons of cargo.
Located in Baltimore, Maryland, the S.S. John W. Brown is one of two surviving fully operational Liberty ships preserved in the U.S. Launched at the Bethlehem-Fairfield Shipyard in Baltimore on September 7, 1942—Labor Day—the Brown was crewed by about 45 civilian merchant seamen, and its guns were manned by 41 Navy Armed Guard personnel assigned to the ship. The Brown was fitted out to carry troops as well as cargo. Around 500 soldiers at a time could be transported aboard the ship.
The John W. Brown saw duty in many Mediterranean ports during invasions and steamed in convoys that were attacked by enemy aircraft and submarines, but it was never seriously damaged. In total, the Brown made 13 voyages during and immediately after World War II. Her maiden voyage was to the Persian Gulf, carrying military equipment for Russia. Most of the rest of the ship’s wartime voyages were to the Mediterranean Sea, including duty during the Anzio landings. She also served an important supporting role for the invasion force of southern France during Operation Dragoon in August 1944.
Immediately following the war, the Brown carried government cargoes to help rebuild war-torn Europe. From 1946 to 1982, the ship served as a floating maritime high school in New York City. In 1983, Project Liberty Ship acquired the Brown and, in 1988, moved the vessel to the harbor of her birth where it serves as a memorial museum ship to this day. The John W. Brown is one of only a few ships listed in the National Register of Historic Places.

Quick Build, Long Life
Liberty ships like the Brown were not expected to last much longer than five years, but the 441-foot-6-inch-long Brown looks and sails almost exactly as she did at the end of the war. Still powered by a reciprocating, triple-expansion steam engine, a relic from an earlier time in maritime history, the Brown’s engine is fed with steam from two oil-fired boilers and drives a single four-bladed propeller 18 feet in diameter.
The longevity of the Brown can be credited to the students and instructors who lovingly cared for the ship during her years as a high school, and to the all-volunteer crew that returned it to operating condition and continue to maintain it today. Another element of its longevity is the systems selected and installed all those years ago, including the ballast lines that are joined with Victaulic grooved couplings.
According to Mike Schneider, a retired Navy captain and volunteer on the Brown for more than 25 years, while not all of the ballast lines are still used for their original purpose, “the lines still have fluid in them so they have to be integral or pipelines with integrity; we can’t have any leaks in them.”
For more than 70 years, the lines have remained leak-free. According to Schneider, there is no known record of any maintenance being performed on the ballast lines. The grooved couplings visible on the piping today are the original couplings installed in 1942. In more than 70 years of service, the couplings never leaked or required replacement.

The Details

Found on the grooved carbon steel piping of the ballast system are flexible malleable iron Victaulic couplings, which at the time were referred to as standard couplings for grooved steel pipe. Victaulic Style 77 flexible grooved couplings are the equivalent of these couplings today.
Lines from the engine room to the forepeak tank, the bilge wells in the forward three cargo holds, and the #1 and #2 cargo deep tanks are joined with the couplings. The four lines to the deep tanks are 4-inch diameter lines and have around 32 couplings. These cargo deep tanks and the associated piping are not in use today, but were designed to handle cargo oil carried in the tanks. The single line to the forepeak tank is a 3.5-inch diameter line and has approximately nine couplings. This line is still in use and carries fresh water stored in the forepeak tank.
The four lines to the bilge wells in the #1 and #2 cargo holds are 3 inches in diameter and are for pumping water from the bilge wells. There are approximately 18 couplings on these four lines. All numbers are estimates because not all couplings are presently exposed.

The Benefits
From ease and speed of installation to accommodation of piping system movement and vibration, many of the reasons grooved couplings were likely selected for the John W. Brown are the same reasons grooved systems are specified for new ship construction, retrofit and repair today.
Because Liberty ships needed to be constructed quickly—Bethlehem-Fairfield could build one in as few as 28 days and launched an average of almost two each week—speed and ease of installation was probably the most important factor in selecting grooved joining systems for the Brown. Simply put, grooved mechanical piping systems help yards build, commission, test and turn over ships quicker.
A grooved joint comprises four elements: grooved-end pipe, a gasket, coupling housing, and nuts and bolts. The groove is made by cold forming or machining a groove into the end of a pipe. A gasket is centered around two abutted grooved pipe ends, and the coupling housing segments are placed over the gasket so that the key sections of the housing engage the grooves. The bolts and nuts are tightened with a socket wrench or impact wrench. In the installed state, the coupling housing encases the gasket and engages the grooves around the circumference of the pipe to create a leak-tight seal in a self-restrained pipe joint. Following installation, the joint can be visually inspected: metal-to-metal bolt pad contact confirms proper assembly.
With no heat or flame required for assembly, grooved systems offer easier, safer installation than welded systems. The lack of welding reduces or eliminates fumes and particulate matter emissions, hot works, fire watches and the confined space considerations and other precautions specific to welding. Compared to flanges, grooved couplings offer considerable weight and space savings.
The flexibility and vibration attenuation qualities of grooved couplings likely helped increase the life of the Brown’s ballast system piping. Flexible grooved couplings permit a limited amount of linear and angular movement at the pipe joint, which can accommodate system expansion and contraction and help absorb the strains and stresses imposed on the piping as a result of typical ship operating conditions. This flexibility can also accommodate minor misalignment, which would have simplified the assembly of large prefabricated sections of the Brown and the coordinating piping systems within each section. Excessive vibration can decrease the lifetime of a piping system, but the elastomeric gasket contained within the grooved coupling creates discontinuity, reducing noise and vibration transmitted through the piping.
The longevity of the John W. Brown and its ballast system demonstrate the advantages grooved piping systems can bring to the shipbuilding industry. Many of the qualities considered in pipe-joining systems 70 years ago still hold true today: speed and ease of installation and maintenance, safety, reduced fire hazards and issues associated with welding, reduced downtime, and reduction in vibration and noise transmission. Liberty ships were at one point referred to as “five-year ships” for their expected service life, but the Brown has proven that a well-maintained vessel with durable, reliable piping systems—the veins and arteries of a ship—can greatly exceed expectations.

Project Liberty Ship

Project Liberty Ship is dedicated to the preservation of the Liberty ship S.S. John W. Brown as a living memorial to the men and women who built the great Liberty Fleet and to the merchant seamen and U.S. Navy Armed Guard who sailed the ships across the oceans of the world.  Project Liberty Ship offers public tours, educational programs and Living History Cruises aboard the Brown. This “Voyage into History” is an exciting six-hour ride during which guests learn about the ship’s history through historical reenactments, live music, flybys of vintage World War II aircraft and tours of the museum spaces, crew quarters, bridge, flying bridge, chart room, radio room, mess rooms, troop berthing areas, stern gun deck and more.
Visit www.liberty-ship.com for hours of operation, to purchase tickets and to learn more about the history of the vessel and volunteer opportunities.
Ship Location: Pier One, 2000 South Clinton Street, Baltimore, MD
Phone: 410-558-0646


About the Author
David Gibbons is Maritime Division Manager with Victaulic, a leading producer of mechanical pipe-joining and fire protection systems. Victaulic develops products for a full range of industrial, commercial and institutional applications. For more information, visit www.victaulic.com.

(As published in the June 2014 edition of Maritime Reporter & Engineering News - http://magazines.marinelink.com/Magazines/MaritimeReporter)

 

  • Ballast lines onboard John W. Brown

    Ballast lines onboard John W. Brown

  • Ballast lines onboard John W. Brown

    Ballast lines onboard John W. Brown

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

MSC Geneva Gets Fatter

A revolutionary new option to scrapping for younger panamax containerships deemed too small for a tradelane involves widening the vessel rather than adding length.

Record Bulk Shipping Demolition Rates in 1H15

Monthly demolition rates in the dry bulk shipping sector averaged 3.3 million DWT for 1H15, according to new figures from BIMCO, compared to 1.3 million DWT last year.

Silversea Cruises Plans New Flagship

Cruise operator Silversea Cruises has unveiled its new flagship, the Silver Muse, which will begin sailing the seas in April 2017.    Built by Italian shipbuilding company Fincantieri,

Navy

Fincantieri to Supply Four OPVs to the Bangladesh Coast Guard

Fincantieri has been awarded the contract with the Bangladesh Coast Guard (BCG) for the supply of four Italian Navy “Minerva” class corvettes to be upgraded and

Saab Bags $1 bln Order for Swedish Submarines

The Swedish Defence Materiel Administration (FMV) has awarded contracts worth Skr8.6bn ($1.03bn) to Saab AB for the construction of two new Type A26 submarines

Austal Delivers 7th Cape Class Patrol Boat

Shipbuilder Austal Limited announced it has delivered Cape Wessel, the seventh of eight Cape Class patrol boats being supplied to Australian Border Force under a $330 million design,

Marine Materials

Bestobell Bags HHI's Valve Order

Bestobell Marine, a world leading supplier of cryogenic valves for ships, has won a major new order from Hyundai Heavy Industries (HHI) in South Korea to supply valves for two new vessels.

The Submarine Electricity Transmission Market Is Expected to Reach $25 Billion in 2024

According to a new report from Navigant Research, the global submarine electricity transmission market is expected to grow from $16.8 billion in 2015 to $24.8 billion in 2024.

PPG Debuts New Antifoulings

Low-friction, self-lubricating coatings use patented technology to deliver reduced fuel consumption and improved tolerance to idle time.   PPG Protective and

Marine Equipment

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

Bestobell Bags HHI's Valve Order

Bestobell Marine, a world leading supplier of cryogenic valves for ships, has won a major new order from Hyundai Heavy Industries (HHI) in South Korea to supply valves for two new vessels.

CNOOC Acquires Asia's 1st LNG Powered Tug

China National Offshore Oil Corporation (CNOOC) has taken delivery of Asia’s first tugboat Hai Yang Shi You 525, designed to operate solely on liquefied natural gas as ship’s fuel.

Vessels

Aberdeen Pupils Peek into Subsea Oil & Gas Technology

Pupils at an Aberdeen primary school were given a rare insight into the depths of the oil and gas industry’s subsea sector after getting to sit in the driving

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

Bestobell Bags HHI's Valve Order

Bestobell Marine, a world leading supplier of cryogenic valves for ships, has won a major new order from Hyundai Heavy Industries (HHI) in South Korea to supply valves for two new vessels.

History

Antwerp, Duisburg Ports to Upgrade Rly Link

The Port of Antwerp and duisport are intensifying their cooperation as the Port of Antwerp will participate in the existing rail shuttle service connecting the two ports.

New Record Year in Dry Bulk Demolition Underway - BIMCO

The monthly average for the first six months in 2015 is 3.3m DWT. In 2014 the first half year averaged at 1.33m DWT per month.   April 2015 saw 5.36 million DWT being retired from active service,

New Imagery Allows Viewers to ‘Tour’ WWII Shipwrecks

High-tech underwater cameras help uncovering the secrets of HMAS Sydney   A recent expedition to survey historic World War II shipwrecks has produced a wealth

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2543 sec (4 req/sec)