Liebherr-Werk Biberach Wins Orders from Australia & New Zealand

By Joseph R. Fonseca
Sunday, August 17, 2014
Liebherr 542 HC-L luffing jib crane in Darling Harbour in Sydney

 

Liebherr-Werk Biberach GmbH has managed to win several orders in Australia and New Zealand. During the last few weeks four luffing jib cranes from the HC-L series and a top-slewing crane from the EC-H series have left Liebherr-Werk Biberach GmbH for the voyage down under.

Liebherr's exclusive distributor in Australia, Morrow Equipment Co. L.L.C. based in Caringbah, NSW near Sydney, has expanded its crane fleet. Morrow continues to expand its hire fleet with the purchase of two new 542 HC-L 18/36 Litronic cranes and a used 540 HC-L model. The high level of usage of the existing hire fleet, positive signals from the market and several pending large projects in the cities of Sydney and Brisbane were the reasons behind the purchases.

Morrow has rented the two brand new 542 HC-L luffing jib cranes to the Lend Lease Corporation, one of the largest construction contractors in Australia. The contractor plans to use the two cranes in the near future for the major construction site for the new Convention Center in Darling Harbour, Sydney. This prestigious project at Sydney's new landmark will enable the two cranes to show exactly what they can do.

A 420 EC-H 16 Litronic crane is on its way to Christchurch by sea. The New Zealand government is currently rebuilding the city, which was very badly damaged in the serious earthquake that struck in 2011. The rebuilding work and construction projects will take several more years to complete, however.

One of the largest projects on the south island of New Zealand is the reconstruction of the Justice Precinct in Christchurch. This is where the 420 EC-H 16 Litronic will be used, playing a major role in its construction. Its large radius of 75 m will enable the crane to cover the site completely.

The recently delivered 357 HC-L luffing jib crane is already in use in the construction of a dairy processing plant near Auckland. The 357 HC-L will primarily be used to erect prefabricated concrete components. The Micromove fine positioning mode is particularly useful for this work,

Liebherr-Werk Biberach

 

  • Liebherr 542 HC-L luffing jib crane in Darling Harbour in Sydney

    Liebherr 542 HC-L luffing jib crane in Darling Harbour in Sydney


Contracts

BP, ExxonMobil, ConocoPhillips 'Quit' Alaska LNG Project

BP, Conoco Phillips, and Exxon Mobil said that the 65-billion dollar megaproject would be too unprofitable for them to move into the next phase of development.

C-Job Designs Flettner Freighter for Switijnk

The Dutch shipping company family Switijnk has contracted C-Job Naval Architects to develop a Rotor Sail-equipped design to meet their specific loading and sailing profile.

Yangzijiang Shipbuilding to Slash 2,000 More Jobs

Chinese shipbuilder Yangzijiang Shipbuilding Holdings Ltd said it plans to cut 2,000 additional jobs, just under 10 percent of its current workforce, stepping up

News

NASA May Send Submarine to Titan

NASA has unveiled plans to send a submarine into the depths of the largest ocean of Saturn's biggest moon, Titan in a bid to explore the depths of its largest ocean.

Michelle Obama Sponsors Attack Submarine

General Dynamics Electric Boat has delivered to the U.S. Navy an attack submarine that is sponsored by first lady Michelle Obama and will be named for her home state, reports AP.

MV WERFTEN, Foreship Sign Design Agreements

MV WERFTEN signed a letter of intent with the engineering company Foreship in Stralsund today. The agreement includes parts of the basic design as well as design,

 
 
Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0818 sec (12 req/sec)