OMM: New Maintenance Service to Renewables Sector

Thursday, December 22, 2011

Offshore Marine Management (OMM) has launched a new maintenance support service for offshore renewables operators. With little existing guidance and no legislation currently in place, operators may not be conducting the maintenance they need in order to guarantee the integrity of their assets – or they might be spending too much on completing unnecessary routine servicing. OMM’s new Inspection, Maintenance and Repair (‘IMR’) service can give operators the confidence they need in every aspect of their installation. By studying best practice approaches to maintenance that exist in other markets, including the oil and gas industry, and building in a stage where maintenance plans are verified by a third party, OMM believes it has identified an  approach that can be applied to any installation, regardless of size or age. Stephen Bolton, OMM’s Operations and Maintenance Director, commented: “Renewables operators are currently exposing themselves to unnecessary and potentially serious risks – risks that could result in lengthier, more costly repairs if  things go wrong and ultimately long periods of lost production.

“This new service takes a holistic approach to the problem. It examines every aspect of an installation, including the crucial sub-sea elements, and identifies those that represent the greatest risk to the project should they fail. In a first for our industry, it also ensures that the resulting maintenance plan is independently verified – giving operators and their backers the assurance they need that precisely the right level of maintenance is taking place.”
OMM is currently in discussions with a number of renewables operators regarding IMR, and is now looking for further opportunities with companies around the world, including those developing wind farms in the North Sea and off the coast  of northern Germany. Bolton continued: “This is not a one-size fits all approach – what we are advocating takes careful consideration of the nature of the project and is a technique that is thorough while remaining entirely flexible. With maintenance of high  value offshore assets becoming a more important issue as further wind farms are installed, now is the time for operators to ask if the processes they have in place right now are fit for purpose.”
 
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

ClassNK Holds LNG Fuel Technologies Seminars

ClassNk held LNG-Fuelled Vessel Technologies seminars in Shanghai and Singapore on 22 July and 24, July 2014, respectively. With the industry looking to adopt

USCG Change of Command in Galveston

A Coast Guard lieutenant commander and graduate of Hastings High School in Houston, took command of Maritime Safety and Security Team Galveston during a ceremony in Galveston Thursday.

Miller Rejoins TITAN as Salvage Master

Captain Stuart Miller has rejoined Crowley Maritime Corporation’s TITAN Salvage operations team as salvage master, bringing with him over 30 years of worldwide,

Contracts

Hamburg Süd to Acquire CCNI Liner Service

Compañía Chilena de Navegación Interoceánica S.A. (CCNI) with headquarters in Valparaiso, Chile, and Hamburg Südamerikanische Dampfschifffahrts-Gesellschaft KG (HSDG) with headquarters in Hamburg,

Asia VLCC Rates Could Nudge Higher on Activity

Rates for very large crude carriers (VLCCs) on key Asian freight routes could hold steady or gain next week as charterers seek to complete their vessel chartering

Star Bulk Takes Delivery of First Capesize from JMU

Athens, Greece-headquartered Star Bulk Carriers says it has taken delivery of 'M/V Peloreus' a 182,000 dwt Capesize built by Japan Marine United (“JMU”) and the

Offshore

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

Gas Prices Help Offset Statoil's Output Drop

Statoil's second quarter 2014 net operating income was NOK 32 billion, a decrease of NOK 2.3 billion compared to the second quarter of 2013. Adjusted earnings were NOK 32.

 
 
Maritime Security Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1629 sec (6 req/sec)