Marine Link
Thursday, March 28, 2024
SUBSCRIBE

Birkenhead News

16 Feb 2024

Stena Line Commences Dublin-Liverpool Freight Route

Source: Stena Line

Swedish ferry operator, Stena Line has officially commenced its new Dublin – Liverpool (Birkenhead) freight service. The addition of the new route is expected to further boost the company’s freight volumes following a record year on its Irish Sea services in 2023.The return service will operate daily from Dublin in the morning, making the evening return journey from 12 Quays terminal in Birkenhead.The addition of the new service will be Stena Line’s seventh route in the Irish Sea region complementing its Belfast - Cairnryan…

20 Dec 2023

CSL and Adbri to Build Fully Electric Battery Capable Self-unloading Ship

(Image: CSL)

Canadian shipping company CSL announced it is partnering with Adelaide Brighton Cement Ltd. (Adbri) to build and operate the world’s first fully electric battery capable self-unloading vessel.Under a 20-year strategic partnership agreement, the custom-designed ship will replace Adbri’s Accolade II and will support the company’s limestone operations in South Australia with a focus on enhanced efficiency and environmental responsibility. The ship will carry up to 2.7 million tonnes of limestone per year…

19 Dec 2023

Cammell Laird to Build New Mersey Ferry

(Photo: Cammell Laird)

U.K. shipbuilder Cammell Laird has been awarded a contract to construct the first new Mersey ferry in 60 years.The Birkenhead facility, part of the APCL group, signed a deal with the Liverpool City Region Combined Authority to design and build the vessel on-site for a target delivery date of the end of 2025.The ferry will feature Azi-pull propeller system for reduced fuel usage, along with a diesel-electric hybrid-ready propulsion system – with potential for future conversion to full electric propulsion at a later date.

17 Feb 2023

Stena Line Inks Deal to Operate Birkenhead Terminal Until 2100

(Photo: Stena Line)

One of Europe’s largest ferry route and port operators, Stena Line, said it has signed a new deal with U.K. port operator Peel Ports to operate its 12 Quays port and ferry terminal in Birkenhead until the beginning of the 22nd Century. The Swedish company has operated twice daily ferry services to Belfast since 2011 and this new deal will see them continue to operate there for at least another 77 years, until 2100.The value of the deal has not been disclosed.Stena Line operates six routes and 12 vessels across the region and Birkenhead has been a key focus for investment in recent years.

20 Jan 2023

UK Defense Ministry Buys Offshore Construction Vessel for Subsea Cable, Pipelines Protection

The UK defense ministry has acquired a subsea construction vessel that used to work in the offshore energy industry. The vessel, Topaz Tangaroa, will undergo a period of military modification and will be used to protect subsea cables and oil and gas pipelines.The Topaz Tangaora, to be renamed as it joins the Royal Fleet Auxiliary fleet, is the first of two future undersea surveillance ships, and it arrived at Cammell Laird, Birkenhead. Thursday.Once operational, the ship will be used to protect seabed telecommunications cables and oil and gas pipelines. "The 98-meter-long, adaptable offshore patrol vessel – the length of Big Ben – will act as a ‘mother ship’…

29 Jun 2021

Stena Line Bolsters its Baltic Sea Fleet

Image courtesy Photo courtesy Stena Line

Stena Line is strengthening its position and expanding services in the Baltic Sea Region, by deploying two new ferries on the route between Ventspils in Latvia and Nynäshamn in Sweden this year. The first of the two vessels, Stena Scandica -- at 222-m long it is 30% larger than the existing vessels on the route -- has entered Ventspils port on June 29, 2021, to get ready for its maiden voyage on the route. The vessel adds another 70% cabin capacity compared to the existing vessels…

25 Feb 2021

RRS James Clark Ross Makes Its Last Antarctic Call

Last call of the JCR at Rothera (Photo: Alex Wallace / BAS)

It's the end of an era for the U.K.'s RRS James Clark Ross, which made its final call to Rothera Research Station in Antarctic on February 19 after 30 years of service. British Antarctic Survey (BAS) said the polar research vessel will be sold at the end of the 2020/2021 Antarctic season and replaced by the newly built RRS Sir David Attenborough.Rothera was the RRS James Clark Ross’s final call of the ship’s five-and-a-half-month mission to deliver scientific and operational staff to Antarctica, and to resupply the U.K. stations in Antarctica for another year.

02 Feb 2021

Historic Steam-driven Tug Returns to Service

Daniel Adamson (Photo: Thordon Bearings)

One of the world’s oldest tugboats, the 117-year-old, steam-driven Daniel Adamson, is set to return to service offering short cruises along the River Weaver, a tributary of the fabled Mersey River in England, after the completion of a project to install new propeller shaft bearings.The 1903-built steamship, rescued from scrap merchants 15 years ago, was fully restored in 2016 at Birkenhead’s Cammell Laird yard, the original builder of the vessel. Thordon Bearings’ SXL water lubricated propeller shaft bearings were installed last year after competitor bearings failed.Chris Simmons…

03 Jan 2021

New RoPax Ship Stena Embla Arrives in Belfast

Stena Embla is the third new ship to be added to Irish Sea routes. Photo: Stena Line

Stena Embla, the third E-Flexer ferry to be commissioned for Stena Line’s Irish Sea routes in the last 12 months, recently arrived in Belfast. Touted by the owner as "three of the most modern ferries in the world," Stena Embla join her sister ship on the popular Belfast – Liverpool route later this month. Stena Embla has the capacity to carry 1,000 passengers, 120 cars and 3,100 lane metres of freight. This will provide a significant 20% increase in freight capacity for the route…

01 Dec 2020

Stena Line Takes Delivery of New Ferry Stena Embla

Stena Embla (Photo: CMI Jinling Weihai Shipyard)

Swedish ferry company Stena Line said it has taken ownership of its newest ferry, Stena Embla, following a handover ceremony in Weihai, China. The vessel is the third of five new next-generation E-Flexer RoPax vessels that are being constructed at the CMI Jinling Weihai Shipyard, as part of an extensive modernization of the company’s fleet. It is last of three new vessels due for the Irish Sea, which marks the end of a seven-year development program totaling a £400 million investment…

21 Oct 2020

Stena Line's New Irish Sea RoPax Completes Sea Trials

Stena Embla (Photo: Stena Line)

Ferry company Stena Line announced that Stena Embla, the last of its three new ferries destined for the Irish Sea, has completed its sea trials in China’s Yellow Sea and is set to arrive in Belfast at the end of 2020.Stena Embla is the latest new Stena Line next generation RoPax vessel that is being constructed at the CMI Jingling Weihai Shipyard in China, marking the end of significant recent investment on the Irish Sea by the Swedish owned ferry company. The global pandemic did not delay the build of the vessel…

10 Mar 2020

Stena Edda Enters Service

Stena Edda (Photo: Stena Line)

The next generation of ferry travel went into service Monday as Stena Line reaffirmed its commitment to freight and travel operations on the Irish Sea.Stena Edda, the biggest ferry ever to sail on the Belfast to Liverpool route, embarked on its maiden voyage on Monday evening as it left Merseyside.With 40% more deck capacity, 40% more cabins and 30% more fuel efficiency than current vessels on the route, Edda accommodates up to 1,000 passengers, 120 cars in its dedicated garage deck and 3…

31 Jan 2020

Polar Research Ship Commissions Lifeboats

UK’s new polar research ship being built at Cammell Laird in Birkenhead RRS Sir David Attenborough has achieved another important milestone with the commissioning and testing of the ship’s lifeboats and lifeboat davits.The lifeboats, each capable of carrying 90 people, are now in position on both sides of the vessel, along with the operational davits that allow for the safe deployment and recovery of the boats.RRS Sir David Attenborough is the first International Maritime Organisation’s Polar Code-compliant ship to have been built in the UK. These regulations extend to the ship’s lifeboats and davits, all of which are capable of operating at the Polar Service Temperature of -35ᵒC.British Antarctic Survey and Norsafe worked closely to develop the equipment…

20 Sep 2019

HMS Prince of Wales Goes for Maiden Voyage

Britain's newest aircraft carrier has sailed out of Rosyth dockyard for the first time. The GBP3bln, 65000 ton HMS Prince of Wales will sit at anchor in the River Forth for around 2-7 days following departure from the dockyard to complete Initial Sea Safety Training.The vessel is the sister ship of HMS Queen Elizabeth."Cammell Laird is proud to have played a key role in the construction of this magnificent vessel – one of the most powerful surface warships ever constructed in the UK," said a press release from the British shipbuilding company.Following Cammell Laird’s successful completion of nine units for the first Queen Elizabeth-class aircraft carrier, the company’s block building expertise was called upon once again in 2013.

06 Sep 2019

Polar RV Sir David Attenborough Naming Ceremony

The RRS Sir David Attenborough, Britain’s new polar research vessel: the naming ceremony for the ship will be held at shipbuilder Cammell Laird’s yard in Birkenhead, England on September 26.

(Photo: British Antarctic Survey)

On Thursday, 26 September, the ceremonial naming of the new British polar research ship RRS Sir David Attenborough will take place at the Cammell Laird Birkenhead shipyard.The ship was commissioned by the UK’s Natural Environment Research Council, built by Cammell Laird, and operated by the British Antarctic Survey. This vessel is designed to transform how ship-borne science is conducted in the Polar Regions and its commissioning is part of a major UK Government polar infrastructure…

08 May 2019

Cammell Laird Finishes RFA Fort Victoria Refit

UK based shipbuilding and engineering company Cammell Laird  has completed GBP44mln Royal Fleet Auxiliary (RFA) Fort Victoria Refit.The supply ship Fort Victoria, one of the largest vessels operated by the UK Ministry of Defence, has put to sea following the completion of the refit by the Birkenhead-base shipyard and marine engineering services provider.The year-long programme of work, represented phase two of RFA Fort Victoria’s life extension programme to keep her in service until 2025.Dubbed ‘Britain’s number one pirate catcher’ after playing a key role in numerous counter-piracy operations off the coast of Somalia, the ship has rejoined the UK’s surface fleet…

06 Mar 2019

First RFA Tanker Arrives at Cammell Laird

British shipbuilding company Cammell Laird has welcomed the first Royal Fleet Auxiliary (RFA) vessel, RFA Tidespring, to its Birkenhead shipyard as part its GBP619mln deal to maintain nine vessels over the next 10 years.The 39,000 tonne Tide-class tanker RFA Tidespring is now moored for its inaugural docking period.The Ministry of Defence (MOD) announced in October 2018 that Cammell Laird had been chosen to provide support to all four Tide class tankers – RFA Tidespring, RFA Tiderace, RFA Tidesurge and RFA Tideforce – following a competitive two-year tender process.At the same time the company was awarded a second 10-year contract that will see it continue to provide support for the vessels RFA Fort Victoria…

27 Aug 2018

Cammell Laird’s Leander Frigate Generates Global Interest

Photo courtesy of BAE

Birkenhead-based shipbuilder Cammell Laird is attracting international interest after it proposed the T31 Leander in the UK competition for five Royal Navy frigates.The business believes the low price point and proven technology makes the Type 31e frigate extremely attractive to the international market.The Ministry of Defense took its first steps to reopening competition for the frigate shipbuilding contracts and Cammell Laird now using that momentum to demonstrate its global…

10 Jul 2018

Roxtec Secures Order for Britain’s $265m Polar Ship

Photo: Roxtec

International manufacturer Roxtec is helping protect Britain’s new £200m ($265m) polar research vessel - RRS Sir David Attenborough – after supplying a range of specialist safety seals.The new build ship is being funded by the Natural Environment Research Council (NERC) built by Cammell Laird in Birkenhead and run by the British Antarctic Survey (BAS).It will operate in extreme conditions in both Antarctica and the Arctic, enduring up to 60 days in sea-ice for scientists to gather…

23 Jul 2018

Cammell Laird Leads Welding Research Project

John Eldridge, principal engineer at Cammell Laird (Photo: Cammell Laird)

Merseyside shipyard and engineering services company Cammell Laird has won a £1.5 million tender with Innovate UK to develop electron beam welding technology in the shipbuilding, offshore and nuclear sectors.Cammell Laird will act as primary contractor to test the equipment at its Birkenhead site using its team of welders and engineers, together with partners TWI Limited which will provide research, and support in welding codes and standards. The third partner, Cambridge Vacuum Engineering will manufacture the electron beam machine.John Eldridge…

06 Aug 2018

SeaKing Electrical Wins Windermere Ferry Repair Deal

The Mallard (Photo: SeaKing Electrical)

Birkenhead, Merseyside based maritime engineering company SeaKing Electrical has won a tender from Cumbria County Council to repair the electrics on the council-owned car ferry the Mallard following a fire earlier this year.The ferry’s engine room caught fire in March following a hydraulic leak causing an evacuation of 80 people from the vessel while it was operating on Lake Windermere in England’s Lake District. The Mallard has capacity for 100 passengers and 18 cars.SeaKing…

27 Mar 2018

UK Team to Resolve Type 45 Destroyer Power Issues

(Photo: BAE Systems)

An alliance team led by BAE Systems has won the contract to resolve propulsion issues that have been plaguing the U.K.’s most advanced air defense warships. The team, which also includes Cammell Laird and BMT, has been tasked to improve the resilience in the Royal Navy’s Type 45 Destroyer power and propulsion system by replacing the existing two diesel generators, fitting an additional diesel generator and modifying the high voltage system on each ship. The warships had reportedly suffered a number of breakdowns at sea due to problems with their propulsion systems.

10 Apr 2018

Latest Innovations in Heavy Duty Machinery

RollDock Shipping: sophisticated loading/unloading systems for wind turbine component transportation. (Photo courtesy of Roll Group)

In the first of a series of marine industry sector reviews, MR&EN correspondent Tom Mulligan reports on the latest innovations in heavy lifting machinery technology with a selective overview of new product launches and recent equipment installations on board ships, ferries and workboats, as well as in ports, docks, harbors and shipping terminals worldwide. Markey Machinery’s Render/Recover and Asymmetric Render/Recover ‘active heave’ compensating winches have been recognized as…