Marine Link
Saturday, April 20, 2024
SUBSCRIBE

Burial Protection News

06 Mar 2014

Study Targets Reduced Offshore Wind Costs

Xodus Group, Cathie Associates and UTEC Geomarine have formed an industry leading consortium to deliver a study which will aim to reduce the costs of generating electricity from offshore wind farms in U.K. waters. The Carbon Trust’s Offshore Wind Accelerator (OWA), which brings together nine offshore wind developers (DONG Energy, E.ON, Mainstream Renewable Power, RWE Innogy, ScottishPower Renewables, SSE Renewables, Statkraft, Statoil and Vattenfall) in a joint industry project, is working towards reducing the cost of offshore wind by at least 10% by 2015. Technology challenges are identified and prioritized by the OWA members based on the likely savings and the potential for the OWA to influence the outcomes.

21 Mar 2013

Dogger Bank (UK) Cable Route: OMM Completes Assessment

Offshore Marine Management (OMM) completes a feasibility study for Forewind’s planned North Sea wind energy development. The study was undertaken to assess route feasibility options along one of the development’s 160km long export cable corridors. The scope of work required OMM to analyse survey data, establish a Burial Protection Index (BPI) and carry out a burial assessment to recommend cable burial depths along the route. This was used to advise on the potential need for corridor widening and cable protection measures, including advising on appropriate techniques for cable burial and protection along the route. OMM used its in-house Esri GIS facilities to assess the data provided for geology…

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week