Vancouver Shipyards (VSY) has started design work under the Construction Engineering Contract for the Canadian Coast Guard’s Offshore Fisheries Science Vessel (OFSV). This contract will take a total of ten months to complete and lead to a build contract in early 2014. 1. Initial Design Phase – elements of the design will be matured and an initial cost model developed. 2. Functional Design Phase – design for spaces and systems will be completed, equipment identified, suppliers engaged and regulatory approval for the design obtained. 3. Production Design Phase – a detailed 3D model of the ship will be started to define final requirements for material and layout of spaces and systems.