Marine Link
Thursday, April 25, 2024
SUBSCRIBE

Dominion News

23 Apr 2024

One-on-One: Rob Langford, VP, Global Offshore Wind, ABS

“We are engaged with multiple US OSW wind developments and seeing an up-tick for CVA, technology review and risk reduction services in early development phases. With new lease rounds coming and new opportunities, we do not see a big slowdown for OSW developments apart from the obvious project delays and re-bids.”
Rob Langford, VP, Global Offshore Wind, ABS

As the U.S. offshore wind industry endures a predictable number of stops and starts during its adolescence, common mantras are ‘learn from the established European model’ and ‘embrace technology transfer from the offshore oil and gas sector.’ In Robert Langford, the American Bureau of Shipping has all of that and more bundled in one neat package.Rob Langford has worked in the offshore industry for more than three decades, ‘cutting his teeth’ in a UK design firm working in the North Sea oil and gas platforms, the holy grail of rigorous conditions in offshore energy production.

18 Apr 2024

Marine News' 2024 US Shipbuilding Report

ECO Edison, the first U.S.-built wind farm service operations vessel (Photo: Ørsted)

If nothing else, building vessels in the U.S. is a complicated business.In a session on the domestic shipbuilding marketplace, at Marine Money’s late-November 2023 conference held in New Orleans, Ben Bordelon, president and CEO of Bollinger Shipyards (with more than a dozen facilities, in Mississippi and Louisiana), described his company’s architecture as a “three-legged stool approach: commercial newbuilds, government newbuilds and repair/conversion capabilities”.On the same panel…

18 Apr 2024

All Clear for Construction Start of Virginia’s 2.6GW Offshore Wind Farm

© DJ / Adobe Stock

The U.S. Environmental Protection Agency (EPA) has issued the final air quality permit for Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project located off the coast of Virginia Beach in the United States.Issued on April 9 following a 30-day public comment period, the permit authorizes the construction and operation of the largest offshore wind project in the U.S.

18 Apr 2024

DEME’s Orion Vessel Heads to US After Finishing Scottish Offshore Wind Job

DEME's Orion vessel (Credit: DEME)

DEME’s DP3 offshore installation vessel Orion has departed for the United States to prepare for the installation of 176 foundations on the Coastal Virginia Offshore Wind (CVOW) project, following the wrap up of works at the 882 MW Moray West offshore wind farm in Scotland.DEME’s flagship Orion vessel has completed monopile installation works on Ocean Winds’ Moray West offshore wind farm project in Scotland.Despite harsh winter conditions, DEME managed to install 29 monopiles in approximately two months.Meanwhile…

15 Apr 2024

First US-built WTIV Charybdis Launched

Principal Deputy Assistant Secretary for Land and Minerals Management Dr. Steve Feldgus, Bureau of Ocean Energy Management Director Elizabeth Klein and Bureau of Safety and Environmental Enforcement (BSEE) Deputy Director Paul Huang recently toured Dominion Energy’s Charybdis at the Seatrium AmFELS shipyard. (Photo: BOEM)

The United States' first Jones Act-compliant offshore wind turbine installation vessel (WTIV), Charybdis, was launched into the water at the Seatrium AmFELS shipyard in Brownsville, Texas.The 472-foot WTIV—the first and only to be constructed in the U.S.—is being built for Blue Ocean Energy Marine, a subsidiary of Dominion Energy, who announced the milestone on Monday. Welding of the ship's hull and commissioning of the vessel's four legs and related jacking system has been completed…

22 Feb 2024

Dominion Partners with Stonepeak to Fund Coastal Virginia Offshore Wind

(Photo: Dominion Energy)

U.S.

01 Feb 2024

Coastal Virginia Offshore Wind Farm Gets Final Federal Blessing

© Fokke Baarssen / Adobe Stock

Dominion Energy, the developer of Coastal Virginia Offshore Wind (CVOW) farm, has secured the last two major federal approvals needed to begin the construction of the 2.6 GW project.The approvals are keeping the largest offshore wind farm in the United States on schedule to generate clean, renewable energy to power up to 660,000 homes once fully constructed.The Bureau of Ocean Energy Management (BOEM) provided its final approval of CVOW's Construction and Operations Plan (COP), which authorizes construction offshore.The U.S.

19 Jan 2024

US Plugs in First Large Offshore Wind Farm as Developers Play Catch-up

(A GE Haliade-X turbine stands in the Vineyard Wind 1 project area south of Martha’s Vineyard. (Photo: Worldview Films, courtesy Vineyard Offshore)

The U.S. offshore wind industry reached an important milestone on January 2 when Vineyard Wind 1, the country’s first large scale project, supplied first power to the Massachusetts grid.“As the nation’s first utility-scale offshore wind farm this is a fairly momentous event,” Ken Kimmell, Chief Development Officer for Avangrid, the Iberdrola subsidiary co-developing the project with Copenhagen Infrastructure Partners (CIP), told Reuters Events.The turbine will be joined by 61 additional turbines to provide 806 MW of power to the grid by the end of the year…

07 Jan 2024

2023 Coast Guard Engineer of the Year Named

Source: US Coast Guard

Lt. Lena “Lexie” Royster, a mechanical engineer in the U.S. Coast Guard Marine Safety Center, in Washington, has been selected as the 2023 Coast Guard Engineer of the Year.The Coast Guard Engineer of the Year Award recognizes Coast Guard active duty and civilian engineers for their accomplishments and achievements. The award’s selection panel considers many factors including engineering accomplishments, awards, honors and educational achievements.“I am extremely thankful for the opportunities the Coast Guard has given me,” said Royster.

26 Dec 2023

US Offshore Wind Poised for 2024 Success After Turbulent 2023

© Cavan / Adobe Stock

The U.S. offshore wind industry is eying a brighter 2024, with work expected to start on several projects following a year marked by stalled developments and billions of dollars in write-offs.The offshore wind industry is expected to play a major role in helping several states and U.S. President Joe Biden meet goals to decarbonize the power grid and combat climate change.But progress slowed in 2023 after offshore developers canceled contracts to sell power in Massachusetts, Connecticut and New Jersey…

27 Nov 2023

The $1 Billion Offshore Wind Prize for US Shipyards

© A / Adobe Stock

The U.S. offshore wind market presents a $1 billion long-term opportunity to builders of crew transfer vessels (CTV) and service operation vessels (SOV) that will support both wind farm construction and long-term operations and maintenance. Unlike many of the construction vessels to be deployed on U.S. wind projects, CTVs and SOVs must be Jones Act compliant, meaning they will be built, owned and operated by U.S. companies and personnel.However, although seen as somewhat commoditized vessels…

27 Nov 2023

Biden's Clean Energy Agenda Faces Mounting Headwinds

Credit: Dragon Claws/AdobeStock

Canceled offshore wind projects, imperiled solar factories, and fading demand for electric vehiclesA year after the passage of the largest climate change legislation in U.S. history, meant to touch off a boom in American clean energy development, economic realities are fraying President Joe Biden’s agenda.Soaring financing and materials costs, unreliable supply chains, delayed rulemaking in Washington and sluggish permitting have wrought havoc ranging from offshore wind developer Orsted’s project cancellations in the U.S.

01 Nov 2023

U.S. Approves Construction of 2.6 GW Offshore Wind Project

Credit: BOEM

The U.S. Department of Interior on Tuesday approved the construction and operations plan for the 2.6 GW Coastal Virginia Offshore Wind project, located approximately 23.5 nautical miles off Virginia Beach, VA.This is the fifth approval of a commercial-scale offshore wind energy project in the United States.Located approximately 23.5 nautical miles offshore Virginia Beach, the CVOW commercial project is the largest yet.According to the Department of Interior, the project is expected to provide about 900 jobs each year during the construction phase and support an estimated 1…

19 Oct 2023

Offshore Wind Developers Likely to Cancel Some Contracts After NY Decision

© nblxer / Adobe Stock

Developers in the U.S. offshore wind industry will likely cancel some power sales contracts in New York after the state last week denied passing on more of the costs to consumers, but major projects off Massachusetts and Rhode Island are set to start up later this year.Several states and U.S. President Joe Biden's administration consider offshore wind to be a key part of their plans to transition away from fossil fuels for energy, create jobs and reduce carbon dioxide emissions.Last week…

09 Oct 2023

US Committed to Tackling Offshore Wind Challenges -Intelatus

© Chirapriya / Adobe Stock

Despite the negative headlines around the longer-term prospects for the U.S. offshore wind segment, business intelligence company Intelatus Global Partners sees continued efforts by the federal government and, in particular, the East Coast states to find solutions to the challenges faced by the industry as whole, which can be grouped under three headings: high inflation, supply chain development and high interest rates.On the side of the federal government, offshore wind leasing and permitting is being prioritized over oil and gas development.

03 Oct 2023

Offshore Wind: Support Vessel Bottlenecks Loom in the US

(© David Maddock / Adobe Stock)

An offshore wind industry is growing in the U.S. with an aim to meet the Biden Administration’s goal of 30 gigawatts (GW) of offshore wind by 2030, and eventually 110 GW by 2050.But as is the case for any new industry that is building up, there are going to be bumps along the way. The U.S. offshore wind industry is currently grappling with rising costs amid unprecedented supply chain issues and inflation, among other issues.One of the main challenges unique to offshore wind is a shortage of vessels.

26 Sep 2023

First Monopiles for Giant U.S. Offshore Wind Project Set Sail

Credit:  EEW SPC

German offshore wind monopile maker EEW SPC said Monday that the first eight monopiles for the Dominion Energy Coastal Virginia Offshore Wind Project in the U.S. were loaded at the Rostock quayside in Germany, and set sail for the U.S. on September 21, 2023.In preparation for RoRo loading, the monopiles were lifted into the transport cradle using the Strand Jack system. Now aboard the carrier deck, the foundations are on their way to Portsmouth Marine Terminal in Portsmouth, Va.…

25 Sep 2023

U.S. BOEM Completes Environmental Review of Coastal Virginia Offshore Wind Project

Credit: Alex/AdobeStock

The U.S. Bureau of Ocean Energy Management (BOEM) said Monday it had completed its environmental review of the proposed Coastal Virginia Offshore Wind (CVOW) commercial project.“The completion of our environmental review marks another step towards a clean energy future—one that benefits communities and co-exists with other ocean users,” said BOEM Director Elizabeth Klein. “The best available science and knowledge shared by Tribes, other government agencies, local communities, ocean users…

30 Aug 2023

"You're gonna need a bigger crane..."

Jan De Nul's Voltaire jack-up sporting Huisman's largest delivered LEC to date.
Credit: Jan De Nul (File image)

Offshore wind turbines are reaching new heights both literally (meters), and figuratively (megawatts). As the demand for larger turbines surges, so do the challenges faced by offshore installation contractors, which need to come up with bigger vessels, and, consequentially, bigger cranes for those vessels.When I took on the assignment to produce a piece focusing on heavy-lifting cranes and deck machinery for OE, I immediately thought of Huisman as a company best suited for coverage in this space…

28 Aug 2023

14th Annual Maritime Risk Symposium to be Held Nov. 14-16 at SUNY Maritime

The 2023 Maritime Risk Symposium (MRS) will be held Nov. 14-16, 2023, as an in-person event, hosted by Maritime College, State University of New York (SUNY) at the Maritime Academic Center. The theme of the 14th annual event is “Managing Impacts of Supply Chain Disruptors, Renewable Energy, Emerging Technology on the Maritime Transportation System (MTS)” with a focus on offshore infrastructure risk and disruptors. Founded in 1874, Maritime College is the oldest maritime college in the United States, providing mariner training for 150 years.

04 Aug 2023

Dominion Sees Virginia Offshore Wind Farm Complete in Late 2026

Coastal Virginia Offshore Wind pilot project (Photo: Stephen Boutwell / BOEM)

U.S. energy company Dominion Energy said on Friday that its roughly $10 billion Coastal Virginia Offshore Wind project was on budget and on track for completion in late 2026.The company said in its second quarter earnings presentation that it expected to get a Record of Decision from the U.S. Bureau of Ocean Management (BOEM) in the second half of 2023. The Record of Decision is a step in the process before construction can start.The roughly 2,600-megawatt (MW) project consists of 176 turbines…

28 Aug 2023

Offshore Wind: US Shipbuilders Answering the Call

From left to right: Lasse Petterson, CEO of Great Lakes Dredge and Dock; Rep. Mary Gay Scanlon, D-Pa.; President Joe Biden; and Steinar Nerbovik, CEO of Philadelphia Shipyard (Photo: Philly Shipyard)

It’s a big deal when a U.S. president visits an American shipyard, and these trips always send a message. When President Obama spoke at HII’s Newport News Shipbuilding in 2013, he warned of the consequences of sequestration. President Trump’s 2020 speech at Fincantieri Marinette Marine touted a $5.5 billion naval contract that gave a welcome boost to the Wisconsin shipyard and its supply chain partners. Most recently, President Biden traveled to Philadelphia’s Philly Shipyard…

05 Sep 2023

How Serious a Problem is the Cost Issue in U.S. Offshore Wind?

Credit: mark_gusev/AdobeStock

Much has been written recently about the challenges facing U.S. offshore wind projects, resulting in requests to terminate or renegotiate contracts to sell power to states. Examples of these challenges can be found from Massachusetts to Virginia. Coming on top of last week’s somewhat disappointing events of the Gulf of Mexico lease auction, speculation has mounted around the longer-term prospects for U.S. wind. But how serious is this problem, and what does it mean to the longer-term goals of the federal administration to deploy 30 GW of offshore wind by 203 and 110 GW by 2050?Below…