Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Elf Petroleum News

22 Aug 2011

Hoists Designed for the Oil and Gas Industry Used in FPSO Mooring System

A hydraulically operated overhead crane with a hoist lift capacity of 18 tons, manufactured by J D Neuhaus for Bardex Corporation

The J D Neuhaus company have a long established reputation for the design and manufacture of materials handling products. They also supply purpose designed equipment for specialized applications such as the oil and gas industry where safety and reliability are primary requisites. For this purpose they can supply hoists, with a lift capacity range from 0.25Kg up to 100 tons, to API7K certification. These are high durability products rated explosion proof/spark resistant and powered by compressed air or hydraulics with corrosion resistant options also available.

24 Feb 2009

Bardex Supplies Total’s USAN FPSO

Bardex Corporation, with headquarters in Goleta, California, has signed a major contract with Hyundai Heavy Industries of Korea to design, manufacture and supply a mooring system for use on Total's USAN FPSO destined for operation offshore Nigeria. The USAN field is located 62 miles south east of Bonny Island and the FPSO, which will be moored in 2,460 ft water depth, will be operated by Elf Petroleum Nigeria. The specially designed mooring system includes sixteen BarLatch fairlead stoppers sized to hold the 1,770 tonnes break strength of the system's 147 mm R3 studless chain, four moveable linear chain jacks rated for a stall pull of 382 tonnes, two 255 tonnes pull-in messenger winches and two hydraulic power units each of which can provide up to 480 kW.

20 May 2008

Total Goes Deep Off Nigeria

Total reportedly launched its second Nigerian deep water drilling project, scheduled to come on stream in 2012 and expected eventually to yield 180,000 barrels a day, according to an AFP report. The new Usan project follows Total's first Nigerian deep water investment, the Akpo field. Deep water fields are further out to sea than offshore fields in shallower waters nearer the coastline. The new field will be operated by Elf Petroleum Nigeria Limited, a Total subsidiary. (Source: AFP)

06 Nov 2001

Global Marine Announces Two Long-Term Drilling Contracts Offshore West Africa

Global Marine today announced it received a letter of commitment from Elf Petroleum Nigeria Limited, a subsidiary of TotalFinaElf, for two-year contracts for both the Glomar Adriatic I and Glomar Baltic I jackup rigs to work on the Amenam/Kpono field offshore Nigeria. Producing Nigeria Unlimited operates this field development project. The contracts for the two units include key rig upgrades, which are anticipated to cost about $23 million in total. The two contracts are expected to generate combined revenues of approximately $121 million to Global Marine. for extension of up to one year. four operating offshore Nigeria," Marion Woolie, president of Global Marine Drilling Company, said. 410 feet of leg.

24 Oct 2007

Oil Worker’s Children Abducted in Nigeria

Two children, Fransisca Ehileme, age six, and her five-year-old brother, Francis, both children of an oil worker, were abducted by gunmen on their way to school around Rumuigbo junction in Port Harcourt, the Rivers State capital. Security sources informed the Nigerian Tribune in Port Harcourt that the father of the children, Mr. Maximus Ehileme, a production superintendent with Elf Petroleum, was taking them to school in his car at about 6:50 a.m. when the armed hoodlums blocked his car near Obi Wali Road junction by Rumu-Echieolu Street. A source from the State Security Service (SSS) told the Nigerian Tribune that no contact had been established with the kidnappers yet, but added that the SSS had already taken up the case and would be handling the negotiations for their release.

10 Aug 2007

Dockwise Awarded Contract for Transportation and Installation

Dockwise Ltd has been awarded the transportation and installation assistance contract of the OFP2 Topsides by Technip for the OFON Phase 2 project in Nigeria, field operated by Elf Petroleum Nigeria Ltd on behalf of the Nigerian National Petroleum Corp/Elf Petroleum Nigeria Ltd joint venture. The value of the float-over contract is in excess of $15m. The transportation and installation assistance work will be executed by Dockwise s open stern vessel Transshelf. The work is scheduled in 2010 for a period of 4 to 5 months.

23 Jul 2007

Hyundai Wins Order for O&G Platform

Hyundai Heavy Industries Co., Ltd. (HHI) signed a contract with Elf Petroleum Nigeria Ltd. (EPNL), a Nigerian subsidiary of French oil company Total S.A., to build an oil and gas production platform worth US $520 m. The platform will be completed by 2010 and will be able to produce 105,000 barrels of oil and 3 million cubic meters of natural gas a day. It will be located in the Ofon field, which is in water 40 meters deep, 40 km southeast of Nigeria. The platform will be operated by a joint venture between EPNL and the Nigerian National Petroleum Corporation. HHI will carry out all phases of the project on a turnkey basis, from the engineering, procurement, and installation to the test runs and commissioning work.

18 Jan 2006

Willbros Announces New Contracts, Sale of Opal Facility

Willbros Group, Inc. announced that business units in Canada, the United States, the Middle East and West Africa have been awarded multiple projects valued in excess of $175 million. Willbros MSI Canada Inc. (Willbros Canada) has been awarded a contract for the fabrication of process modules by Canadian Natural Resources Limited (CNRL). The modules will be fabricated in Edmonton, Alberta at Willbros Canada's new 90,000 square foot fabrication facility which was readied for service over the past year. The contract will run through the third quarter of 2006 and anticipates the follow-on services to erect, install and commission the modules at CNRL's Horizon Oil Sands Project. In the United States, Willbros RPI, Inc.

09 Aug 2001

Coflexip Stena Offshore Wins Bongo Installation Deal

Coflexip Stena Offshore International has been awarded through Single Buoy Moorings (SBM) a significant part of the mooring and installation package for Shell Nigeria Exploration & Production Company's (SNEPCO) Bonga field development. This field is located in OML* 118 some 120 km offshore Nigeria's Niger Delta South West coastline in 3,600 ft. (1,100 m) of water. The field is operated by SNEPCO (55%) on behalf of Nigerian National Petroleum Company in partnership with Esso Exploration and Production Company Nigeria Ltd (20%), Nigeria Agip Exploration Ltd (12.2%) and Elf Petroleum Nigeria Ltd (12.5%). CSO International's scope will cover project management, engineering, procurement, transportation and installation of three dynamic 19-in.