Marine Link
Thursday, March 28, 2024
SUBSCRIBE

Executive Steering Group News

08 Sep 2006

CVN 78 Ship Specification Signed

The Naval Sea Systems Command (NAVSEA) and the Program Executive Officer (PEO) Aircraft Carriers held a signature and awards ceremony on Sept. 5 at the Washington Navy Yard to commemorate the certification of the ship specifications for the CVN 78 Class Aircraft Carriers, which makes up the CVN 21 program. NAVSEA's Ship Design, Integration and Engineering Directorate (SEA 05) led efforts, in cooperation with Northrop Grumman Newport News, the lead design shipyard, to develop the CVN 78 ship specifications with support from across the Navy Enterprise. The certification of the CVN 78 ship specifications marks a major milestone in the future aircraft design process and forms the basis of the technical data package used to prepare a ship construction contract.

10 Aug 2006

CVN 78 Ship Specifications Certified

The CVN 78 ship specifications were certified at a Senior Stakeholder Board/Executive Steering Group meeting held recently, after 12 months of specification writing and three months of intense reading sessions. The Naval Sea Systems Command’s (NAVSEA) Ship Design, Integration and Engineering Directorate (SEA 05), in cooperation with Northrop Grumman Newport News (the Lead Design shipyard), led efforts to develop the ship specifications with support from across the Navy enterprise. NAVSEA and the Program Executive Officer for Aircraft Carriers (PEO Carriers) will commemorate the certification of the ship specifications for the CVN 78 Class Aircraft Carriers in a signing and awards ceremony to be held Sept. 5 at the Washington Navy Yard.