2 STS Cranes Commissioned at Flinders ACT
Two new ship-to-shore container cranes have been fully commissioned at Flinders Adelaide Container Terminal, Outer Harbor. The new cranes, which cost $24 million, are essential for South Australia to secure the direct shipping services needed for the State's exports to remain competitive on the world stage. Weighing in at 950 tonnes each, the cranes stand 65 metres high and are capable of reaching heights of 105 metres with the boom raised. Their efficiency is expected to improve vessel turn-around times by up to 25%, and they have a number of innovative safety features. The cranes were assembled at a special site adjacent to the Terminal to avoid any disruption to terminal operationsā¦
Flinders Adelaide Orders Liebherr Container Cranes
Liebherr Container Cranes has recently signed a contract for the supply of two ship to shore container cranes to Flinders Adelaide Container Terminal in South Australia. The container cranes were purchased as part of a 30-year strategic plan to boost service levels at the Port Adelaide Terminal. The cranes have an operational outreach of 50m and a safe working load of 65 metric tons under twin lift spreader and 80 metric tons under hook beam. The lift height over rail is 38 m, the span is 25.3 m and the back reach is 20 m.