Marine Link
Wednesday, April 24, 2024
SUBSCRIBE

Gas Turbine Engine Replacement News

31 Jul 2014

Rolls Royce Marine Awarded LCS Engine Repair Contract

U.S. Department of Defense informs that Rolls Royce Marine North America, Walpole, Massachusetts, is being awarded a US$9,000,000 firm-fixed-price repair order (N00104-09-G-A755) for the repair of one Marine Trent 30 marine gas turbine engine for the Littoral Combat Ship (LCS) Freedom variant. DoD explains that this contract provides for the repair and overhaul of the Marine Trent 30 marine gas turbine engine, replacement of non-repairable re-assembly to the LCS configuration, and pass-off testing to validate performance. Work will be performed in Bristol, United Kingdom, and is expected to be completed by February 2016. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

17 Jun 2014

DoD Awards $36-Million LCAC Contracts to L-3 Unidyne

Is a $22,231,067 firm-fixed-priced contract for the service life extension program (SLEP) for four landing craft, air-cushioned (LCAC) craft in fiscal 2014, 2015 and 2016. The LCAC SLEP will extend the service life from 20 to 30 years, sustain/enhance craft capability, replace obsolete electronics, repair corrosion damage, reduce life cycle cost by improving reliability and maintainability, increase survivability, and establish a common configuration baseline. The LCAC SLEP scope of effort includes repair and upgrade of the buoyancy box, gas turbine engine replacement, installation of a new skirt, installation of an integrated C4N equipment package, and accomplishment of selected craft alterations and repair work.

02 Jul 2009

Oceaneering Receives Naval Funding

Oceaneering International Inc., Chesapeake, Va., is being awarded an $11,984,265 firm-fixed-price contract for the Landing Craft Air Cushion (LCAC) service life extension program (SLEP) for the LCACs 30 and 56. The LCAC SLEP will extend the service life of LCAC from 20 to 30 years, sustain/enhance craft capability, replace obsolete electronics, repair corrosion damage, reduce life cycle cost by improving reliability and maintainability, increase survivability, and establish a common configuration baseline. The LCAC SLEP scope of effort includes repair and upgrade of the buoyancy box, gas turbine engine replacement, installation of a new skirt, installation of an integrated C4N equipment package, and accomplishment of selected craft alterations and repair work.