Marine Link
Monday, March 18, 2024
SUBSCRIBE

Gerald R Ford News

21 Feb 2024

Newport News Begins Topside EMALS Testing on John F. Kennedy (CVN 79)

(Photo: HII)

HII announced today that its Newport News Shipbuilding division (NNS) recently began topside testing of the electromagnetic aircraft launch system (EMALS) on aircraft carrier John F. Kennedy (CVN 79).EMALS, first integrated into USS Gerald R. Ford (CVN 78), replaces the existing steam catapults currently in use on the U.S. Navy’s Nimitz-class aircraft carriers.Following successful “no-load” testing on catapults one and two, known as the ‘bow cats,’ the NNS team, alongside the John F. Kennedy crew, has now started “dead-load” testing.

08 Nov 2023

Newport News Shipbuilding Opens Additional Site in Norfolk

(Photo: HII)

HII announced its Newport News Shipbuilding division has begun production at an additional campus in Norfolk, Va. to support the shipyard’s continued progress toward more effective and efficient shipbuilding.The Newport News Shipbuilding Norfolk Campus is located on land leased from Fairlead in the Lambert’s Point area, at a development known as Fairwinds Landing. NNS shipbuilders have worked at the site for several months constructing steel panels that will eventually make up units of Gerald R.

24 Jul 2023

HII Awarded Contract for Aircraft Carrier Maintenance

(Photo: HII)

HII announced Monday that its Newport News Shipbuilding (NNS) division has been awarded a contract from the U.S. Navy to support maintenance of nuclear-powered aircraft carriers in San Diego. The indefinite delivery, indefinite quantity (IDIQ), cost-plus incentive and award contract has a potential value of $528.4 million over five years, if all options are exercised.The contract covers maintenance, repair and modernization efforts for Nimitz- and Gerald R. Ford-class aircraft carriers home-ported in and visiting the San Diego area.

24 Jul 2023

The Need for [U.S. Navy Shipbuilding] Speed

The world's largest aircraft carrier USS Gerald R. Ford (CVN 78) steams in the Adriatic Sea, June 23, 2023.
(U.S. Navy photo by Mass Communication Specialist 2nd Class Jackson Adkins)

The Navy wants, and needs, more ships; but it can’t build them fast enough.While the U.S. Navy aims to achieve a 355-ship fleet, it is decommissioning older (and some not so old) ships at about the same rate it's adding new ones.A Congressional Research Service report stated that, as of April 17, 2023, the Navy included 296 battle force ships. "The Navy projects that under its FY2024 budget submission, the Navy would include 293 battle force ships at the end of FY2024 and 291 battle force ships at the end of FY2028."But there is progress…

19 Jun 2023

Austal USA to Build Fifth T-ATS Ship for the US Navy

(Image: Austal USA)

Mobile, Ala. shipbuilder Austal USA has been awarded a $71,706,745 fixed-price incentive contract option from the U.S. Navy for the construction of an additional Navajo-class Towing, Salvage and Rescue Ship (T-ATS 15).With the award, the company is now under contract for five T-ATS, having received awards for T-ATS 13 and 14 in July 2022 and T-ATS 11 and 12 in October 2021.Paddy Gregg, CEO of Austal USA's Australian parent company Austal, said the contract award again highlights Austal USA’s growing steel shipbuilding capability…

24 May 2023

World's Biggest Aircraft Carrier Sails into Oslo for NATO Exercises

The U.S. Navy aircraft carrier USS Gerald R. Ford © U.S. Navy photo by Mass Communication Specialist 2nd Class Jackson Adkins (File Photo)

The world's largest aircraft carrier, the USS Gerald R. Ford, sailed into Oslo on Wednesday, a first for such a U.S. ship, in a show of NATO force at a time of heightened tension between NATO and Russia over the war in Ukraine.The ship and its crew will be conducting training exercises with the Norwegian armed forces along the country's coast in the coming days, the Norwegian military said."This visit is an important signal of the close bilateral relationship between the U.S.

08 Aug 2022

Shipyards Adapt to help Navy, Coast Guard Recapitalize Fleets

The first Offshore Patrol Cutter, USCGC Argus (WMSM 915) takes shape at Eastern Shipbuilding Group’s Panama City, Fla., shipyard.  The Coast Guard plans to build 25 OPCs. (ESG photo)

U.S. shipyards are making improvements to building ships for the Navy and Coast Guard today and in the future. In some cases, it means phasing out one class of ship and getting ready for the next. Or, it can be a drastic make-over.The yards include mid-tier yards all the way up to very large facilities devoted exclusively to warships. The ships range from the 353-ton Fast Response Cutter to the 100,000-ton nuclear-powered aircraft carriers. Fincantieri Marinette Marine in Wisconsin…

27 Jul 2022

From Surface to Subsea to Space: U.S. Navy Shipbuilding Outlook 2022

The Ford-class aircraft carrier USS Gerald R. Ford (CVN 78) and the Italian aircraft carrier ITS Cavour (CVH 550) transit the Atlantic Ocean March 20, 2021, marking the first time a Ford-class and Italian carrier have operated together underway. (U.S. Navy photo by Mass Communication Specialist 3rd Class Riley McDowell)

As a rudderless U.S. Navy debates maritime strategy, fleet futures and platform performance, America’s naval shipbuilding industry can look forward to another year of relative stasis.Barring a major geopolitical incident or unexpected maritime provocation, government shipbuilding isn’t going to change course. With Admiral Michael Gilday approaching the final “lame duck” year of his four-year term as Chief of Naval Operations and the 2024 election season looming, the prospect for major changes in the Navy’s demand signal seems limited.Aside from the U.S.

25 Jan 2022

Malyszko Named Plant Operations VP at Newport News Shipbuilding

Karey Malyszko (Photo: HII)

America's largest military shipbuilder Huntington Ingalls Industries (HII) announced on Tuesday that Karey Malyszko has been promoted to vice president of Plant Operations at its Newport News Shipbuilding division in Newport News, Va. Malyszko succeeds Dru Branche who retired in December.Effective immediately, Malyszko assumes overall responsibility for waterfront support services, facilities, environmental health and safety, and security. She reports to Jennifer Boykin, president…

15 Dec 2021

RIX Industries Awarded $1.6M Defense Logistics Agency Contract

The Ford-class aircraft carrier USS Gerald R. Ford (CVN 78) (Photo: Cory J. Daut / U.S. Navy)

RIX Industries, developer of energy technologies and industrial power systems, announced it has secured a $1.6 million contract award from the Defense Logistics Agency (DLA), the nation’s combat logistics support body within the U.S. Department of Defense (DoD). The contract stipulates the purchase of spare RIX liquefier modules for the U.S. Navy’s existing shipboard-qualified liquid oxygen (LOX) production systems, also from RIX. These LOX units, currently deployed onboard USS Gerald R. Ford (CVN 78) and USS John F.

15 Dec 2021

Navy Provides Realistic, Operationally-relevant Test Environment for Technology

Shoreside: Team members collaborate to track and engage a high speed boat straying into an exclusion area. Photo credit: Dave Gentile, Ion

“Synergy” is an overused word. But in the case of the “Advanced Naval Technology Exercises” that are held around the country, ANTX is truly a sum greater than its parts.ANTXs are conducted by the Naval Research & Development Establishment (NR&DE) and hosted at the various Naval Warfare Centers to demonstrate emerging technologies and innovations aimed at solving Navy and Marine Corps problems and addressing mission priorities and gaps. They are not so much exercises, which usually denotes training, but more like technology demonstrations.

25 Aug 2021

Video: First Steel Cut for Aircraft Carrier Doris Miller

(Photo: HII)

A steel cutting ceremony was held on Wednesday for the U.S. Navy’s newest nuclear-powered aircraft carrier Doris Miller (CVN 81).Slated to be the fourth Gerald R. Ford-class aircraft carrier, CVN 81 is currently under construction at Huntington Ingalls Industries' Newport News Shipbuilding shipyard in Newport News, Va. Doris Miller’s keel is scheduled to be laid in 2026 and delivered to the Navy in 2032.Doris Miller is the second ship of the two-carrier contract award HII received in January 2019 for the detail design and construction of the Gerald R.

10 Aug 2021

Video: USS Gerald R. Ford Completes Shock Trials

Shock trials are designed to demonstrate ships’ ability to withstand the effects of nearby underwater explosion and retain required capability. (Photo: Jackson Adkins / U.S. Navy)

The U.S. Navy's new aircraft carrier USS Gerald R. Ford (CVN 78) on Monday underwent its third explosive event off the coast of Jacksonville, Fla., rounding out the ship’s Full Ship Shock Trials (FSST) and validating its shock hardness and ability to sustain operations in a simulated combat environment using live ordnance. During the four-month testing evolution, the first-in-class aircraft carrier withstood the impact of three 40,000-pound underwater blasts, released at distances…

18 Apr 2021

Shipbuilding: HII Celebrates 154 Apprentice School Grads

About 154 graduates of The Apprentice School at Newport News Shipbuilding were honored during graduation exercises on April 17, 2021. Due to COVID 19, the ceremony was held outdoors at the Hampton Roads Convention Center to ensure the safety of all graduates and guests, as well as event staff. Photo by Ashley Cowan/HII

Huntington Ingalls Industries (NYSE:HII) hosted commencement exercises on Saturday, April 17, 2021, for 154 graduates of the company’s Apprentice School at Newport News Shipbuilding. Due to the COVID-19 environment, and in an effort to keep all employees, staff, graduates and their guests safe, the ceremony was held outdoors at the Hampton Roads Convention Center in Hampton.“A drive-in movie-style graduation is likely not what you expected, but I think it’s pretty safe to say that the past year in many ways isn’t what any of us expected…

15 May 2020

Ford Commences Second Round of Carrier Qualifications

(U.S. Navy photo by Mass Communication Specialist Seaman 3rd Class Zachary Melvin)

USS Gerald R. Ford (CVN 78), the only carrier qualification (CQ) asset regularly available on the East Coast this year, commenced its second round of CQs for Fleet Replacement Squadron (FRS) pilots May 10, with a healthy and mission-focused crew.Ford, operating at-sea at the same time as four other U.S. aircraft carriers, is conducting its fourth independent steaming event (ISE) since commencing an 18-month Post Delivery Test and Trials (PDT&T) phase of operations in November…

23 Mar 2020

HII Promotes Jones, Fuller at its Newport News Shipbuilding

Julia Jones was promoted to vice president of manufacturing and facilities, where she is responsible for all manufacturing and facilities operations. Photo: HII

Huntington Ingalls Industries (HII) announced changes to its leadership team at its Newport News Shipbuilding division, effective March 13.Julia Jones was promoted to vice president of manufacturing and facilities, where she is responsible for all manufacturing and facilities operations. She has served as the acting vice president since January. Jones has more than 22 years of shipbuilding experience, including positions of increasing responsibility in operations, planning, manufacturing, nuclear support and corporate strategic planning.

26 Sep 2019

Secretary of Defense Esper Visits Newport News Shipbuilding

HII President and CEO Mike Petters (center) greets Secretary of Defense Mark Esper during his first visit to the company’s Newport News Shipbuilding division and the aircraft carrier USS Gerald R. Ford (CVN 78). Photo by Matt Hildreth/HII

Huntington Ingalls Industries (NYSE: HII) has announced that Secretary of Defense Mark Esper visited the company’s Newport News Shipbuilding division and the aircraft carrier USS Gerald R. Ford (CVN 78). This was Esper’s first visit to the shipyard since he was sworn in to lead the U.S. Department of Defense in July.Esper toured Ford to see the progress being made during the ship’s post-shakedown availability and to learn more about its weapons-handling innovations and increased warfighting capabilities.“Our shipbuilders play a vital role in building our Navy’s future fleet…

12 Jul 2019

Video: HII Finishes CVN-79 Flight Deck

Huntington Ingalls Industries' Newport News Shipbuilding division lifted the upper bow section onto one of the new aircraft carrier being built for the U.S. Navy, signalling the completion of the ship's flight deck.The addition of the upper bow section is one of the last steel structural units, known as a superlift, to be placed on the newbuiild, John F. Kennedy (CVN 79). Weighing 780 tons, the superlift took 18 months to build. It was constructed using digital technology, such as visual work instructions to install piping in the upper bow on the final assembly platen instead of on the ship.“We are very pleased with the progress being made on Kennedy as we inch closer to christening the ship later this year,” said Mike Butler, Newport News’ CVN 79 program director.

16 Jul 2018

USS Gerald R. Ford Returns to Newport News

Gerald R. Ford (CVN 78) arrives at Newport News Shipbuilding (Photo: Huntington Ingalls Industries)

The U.S. Navy’s newest aircraft carrier has returned to Huntington Ingalls Industries’ Newport News Shipbuilding division for 12 months of modifications, upgrades, system improvements and repairs.On Sunday USS Gerald R. Ford (CVN 78) was moved to the shipyard’s Pier 3, where it will undergo a maintenance period typical of newly delivered warships.The $13 billion USS Gerald R. Ford, commissioned July 22, 2017, is the first ship in the nation’s newest class of nuclear-powered aircraft carriers.

01 May 2018

Shipbuilding: HII Awarded Additional Funding for CVN 78

The future USS Gerald R. Ford (CVN 78) underway during sea trials April 8, 2018 (U.S. Navy photo by Ridge Leoni)

U.S. shipbuilder Huntington Ingalls Inc. has been awarded a $61,315,248 cost-plus-fixed fee modification to a previously awarded contract for additional material and labor supporting planning and the preliminary accomplishment of the post-shakedown availability/selected restricted availability (PSA/SRA) on USS Gerald R. Ford (CVN 78).The planning work will be performed in Newport News, Va., and is expected to complete by summer 2018. Preliminary accomplishment of PSA/SRA will be started at Naval Station Norfolk (20 percent)…

04 May 2018

US’ New Aircraft Carrier 75% Structurally Complete

The next nuclear-powered aircraft carrier for the U.S. Navy is now three-quarters structurally complete following the recent installation of the forward area of the ship’s main deck, shipbuilder Huntington Ingalls Industries (HII) announced today.John F. Kennedy (CVN 79), the second ship in the Gerald R. Ford class of carriers, has been taking shape at HII’s Newport News Shipbuilding division since the ship’s keel was laid in August 2015. The ship is being built using modular construction…

09 Apr 2018

Mulherin Receives the Nimitz Award

Matt Mulherin (center) accepts the Fleet Admiral Chester W. Nimitz Award from Alan Kaplan (left), national president of the Navy League of the United States, and Dr. J.P. “Jack” London, executive chairman and chairman of the board of CACI International Inc., on Monday afternoon in National Harbor, Maryland. Photo by Ashley Cowan/HII

Matt Mulherin, former executive vice president of Huntington Ingalls Industries and president of Newport News Shipbuilding, was recognized by the United States Navy League today as a 2018 recipient of its annual Fleet Admiral Chester W. Nimitz Award. This award honors an industry leader who has demonstrated the leadership, statesmanship and dedication to the nation that were exhibited by the award’s namesake. Mulherin, who retired from the company in July 2017 after a distinguished 36-year career…

19 Mar 2018

US Navy Asks Huntington Ingalls for Pricing on Two Aircraft Carriers

Gerald R. Ford (CVN 78) departs Huntington Ingalls Industries Newport News Shipbuilding for builder’s sea trials in April 2017 (U.S. Navy photo by Christopher Delano)

The U.S. Navy asked shipbuilder Huntington Ingalls Industries on Monday for detailed pricing on the cost of two aircraft carriers, showing the Trump administration is taking a serious look at doubling its order for the most expensive ship in the U.S. fleet. The Navy’s request seeks to determine the savings achievable with a two-ship buy. “This opportunity for a two-ship contract is dependent on significant savings that the shipbuilding industry and government must demonstrate,” said James Geurts, assistant secretary of the Navy for research development and acquisitions.

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week