Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Great Lakes Science Center News

14 Dec 2018

INSIGHTS: Lorry Wagner, Ph.D., President, LEEDCo

Dr. Lorry Wagner has served as president of the Cleveland-based Lake Erie Energy Development Corporation (LEEDCo) since May of 2010.LEEDCo is the public private partnership behind the effort to construct Icebreaker Wind, a 6 turbine 20.7 megawatt offshore wind energy demonstration project in Lake Erie, 8 miles off the shore of Cleveland. LEEDCo has received funding from the U.S. DOE under its Advanced Technology Demonstration Projects award and has partnered with Fred. Olsen Renewables of Norway. Dr.

27 Oct 2014

Burger Boat Delivers R/V Arcticus

R/V Arcticus (Photo courtesy of Burger Boat Company)

Burger Boat Company delivered the R/V Arcticus, a 78-foot research vessel for the United States Geological Survey (USGS), on Friday, October 17, 2014. The Arcticus replaces the 38-year-old R/V Grayling and brings the USGS Great Lakes Science Center (GLSC) large vessel fleet up-to-date. The Arcticus will be stationed at the USGS base in Cheboygan, Michigan and incorporates modern marine standards and state-of-the-art technology to more safely and effectively conduct fisheries research.

22 Oct 2014

New Research Vessel Delivered on the Great Lakes

Arcticus

The new oceanographic research and fisheries assessment vessel, Arcticus, completed her sea trials and was delivered to the U.S. Geological Survey's Great Lakes Science Center on October 17. The Arcticus, designed by JMS Naval Architects (JMS) and constructed at Burger Boat Company, replaces the R/V Grayling and becomes the newest member of a five-vessel fleet owned and operated by the Great Lakes Science Center in Ann Arbor, Michigan. JMS completed the concept and contract design and provided all technical representation at the shipyard during construction.

29 Apr 2014

US Coast Guard Foundation Presents US$400,000 Check

Check presentation: Photo USCG

Anne Brengle, president of the Coast Guard Foundation, presented the check to Rear Adm. Fred Midgette, commander of the Coast Guard 9th District at a ceremony in Cleveland. The presentation of the check was held at the Great Lakes Science Center in Cleveland, April 28, 2014. The money will be used to build a community center at Coast Guard Sector Sault Ste. Marie, Mich. Rear Adm. Midgette, commander of the Coast Guard 9th District based in Cleveland, expressed his appreciation for the donation. Pictured: US Coast Guard Foundation president Anne Brengle passes the check to Rear Adm.

24 May 2013

Compliant Hydraulic Fluid Gains Industry Use

Photo: Panolin America

In the search to find EPA Vessel General Permit (VGP) compliant lubricants, ship owners don't have to sacrifice performance or competitive pricing to meet the regulations. Panolin America offers a range of Greenmarine environmentally considerate lubricants, including its high-performance hydraulic fluid HLP Synth. Developed more than two decades ago, HLP Synth derives from saturated synthetic esters, rather than vegetable or mineral oils. Like all Greenmarine products, it is 100% VGP and sVGP compliant.

02 May 2013

Great Lakes June 2013 Symposium

Cleveland Metropolitan Bar Association is to present a public program featuring a range of important issues concerning the Great Lakes. The Great Lakes Symposium is a first-of-its- kind public program focusing on timely legal issues impacting the Great Lakes. Stakeholders will discuss topics ranging from the regulation of phosphorous discharged into the Great Lakes to the development of wind turbines and the Great Lakes Restoration Initiative. The Symposium’s panel discussion will feature noted speakers on Great Lakes topics, including Director Chris Korleski (EPA Great Lakes National Program Office), Retired Congressman Steven LaTourette, Jim Weakley (Lake Carriers’ Association), Brian Cook (Ohio EPA), and Joel Brammeier (Alliance for the Great Lakes).

11 Apr 2013

USGS to Receive New Great Lakes Research Vessel

Photo: USGS

The U.S. Geological Survey awarded a contract for the construction of a large research vessel for Lakes Huron, Michigan, and Superior to Burger Boat Company of Manitowoc, Wis. The vessel will replace the 38-year-old Grayling, bringing the USGS Great Lakes Science Center (GLSC) large vessel fleet up-to-date. The new Grayling will be stationed at the USGS base in Cheboygan, Mich., and will incorporate modern marine standards and state-of-the-art technology to more safely and effectively conduct fisheries research.

15 Oct 2012

Cleveland to Commission Two Cleanup Workboats

sister vessels – Flotsam & Jetsam – will work in tandem to collect and remove floating debris.

Port of Cleveland formally launching work boats for Cleveland Harbor cleanup; Two vessels to remove floating debris from river and downtown lakefront as part of Port’s environmental stewardship mission. The Port of Cleveland is holding a Commissioning Ceremony for its new custom-made boats and their crews. The sister vessels – Flotsam & Jetsam – will work in tandem to collect and remove floating debris. This debris, which can range from tree limbs to plastic bottles, is more than an eyesore; it can be a problem for commercial and recreational boats as well as wildlife.

22 Sep 2011

$23m Contracts Awarded to Great Lakes Shipyard

Caribbean Tugz, LLC, an affiliate of SEACOR Holdings, Inc., Fort Lauderdale, Florida has awarded Great Lakes Shipyard, Cleveland, Ohio vessel construction contracts to simultaneously build two new state-of-the-art 50-ton bollard pull ASD tugboats to be used for ship docking and escort operations at the Hovensa Oil Refinery in St. Croix, U.S. Virgin Islands. The contracts’ total price of the new tugs is $23 million. Design and construction are to start immediately, and the tugs are scheduled for completion in early 2013.

30 Aug 2011

USGS’s R/V Kaho & R/V Muskie Dedicated

Two 17-knot high-speed research vessels for the U.S. Geological Survey are scheduled to be dedicated at Great Lakes Shipyard, Cleveland, Ohio, on Wednesday, August 31, 2011. R/V KAHO and R/V MUSKIE will replace two of the USGS’s oldest research vessels by the same names that are currently operating on Lake Ontario and Lake Erie, respectively. The USCG’s five-vessel fleet supports missions that collect and analyze oceanographic and fisheries information. The U.S. Department of Interior’s U.S.

30 Aug 2011

Dedication & Delivery Ceremony of New USGS Vessels

new USGS research vessel

Two 17-knot high-speed research vessels for the U.S. Geological Survey are to be dedicated at Great Lakes Shipyard, Cleveland, Ohio, on Wednesday, August 31, 2011. R/V KAHO and R/V MUSKIE will replace two of the USGS’s oldest research vessels by the same names that are currently operating on Lake Ontario and Lake Erie, respectively. The USCG’s five-vessel fleet supports missions that collect and analyze oceanographic and fisheries information. The U.S. Department of Interior’s U.S.

20 Jun 2011

Great Lakes Shipyard Overhauls RV Grayling

Photo courtesy Great Lakes Shipyard

Great Lakes Shipyard, Cleveland, OH, finished the 5-year overhaul work on the U.S. Geological Survey Research Vessel Grayling. Under a Fleet Maintenance Contract with the Great Lakes Science Center, Ann Arbor, MI of the U.S. Geological Survey, Department of the Interior, the Grayling was drydocked and given a detailed inspection, cleaning, tune up, repair and modifications. Some of the major work items included overhauling the generators and engines, painting the hull, and repairing of the exhaust and propulsion systems. The 75 ft.

14 Jun 2011

Great Lakes Shipyard Overhauls RV Sturgeon

Great Lakes Shipyard, Cleveland, Ohio, completed five-year overhaul work on the U.S. Geological Survey Research Vessel Sturgeon. Under a Fleet Maintenance Contract with the Great Lakes Science Center, Ann Arbor, MI of the U.S. Geological Survey, Department of the Interior, the Sturgeon was drydocked and given a thorough cleaning, painting, inspection, repair and tune up. Some of the major work items included redesigning the hydraulic system, shaft and propulsion repairs, generator overhauls and steering system repairs. The 105 ft. long Sturgeon was built in 1974 and is home-ported in Cheboygan, MI. The Sturgeon is the Center's second largest vessel with great geographic range and advanced scientific abilities.

24 Jan 2011

Nautica Queen at Great Lakes Shipyard for Repairs

Photo courtesy The Great Lakes Towing Co.

Great Lakes Shipyard, Cleveland, Ohio, will perform deck repairs to the Nautica Queen. The 124 ft long Nautica Queen was built in 1981 and is home-ported in Cleveland, Ohio on the west bank of the flats. The Nautica Queen can accommodate up to 400 passengers in the two enclosed decks and spacious observation deck on the top of the ship. The vessel hosts lunch and dinner cruises as well as Sunday brunch and also hosts corporate and birthday parties as well as wedding receptions.

10 Dec 2010

Second Research Vessel at Great Lakes Shipyard

Photo courtesy Great Lakes Shipyard

Great Lakes Shipyard, Cleveland, Ohio, will perform repairs, haul out and drydocking, as necessary, to the U.S. Geological Survey Research Vessel Sturgeon under a fleet maintenance contract with the Great Lakes Science Center, Ann Arbor, Mich. of the U.S. Geological Survey, Department of the Interior. The 105 ft. long Sturgeon was built in 1974 and is home-ported in Cheboygan, Mich. The Sturgeon is the Center's second largest vessel with great geographic range and advanced scientific abilities.

17 Nov 2010

Great Lakes Shipyard Begins Work on William Market Ferry

Photo courtesy Great Lakes Shipyard

Great Lakes Shipyard, Cleveland, Ohio, drydocked the ferry William Market to begin maintenance and repairs for its U.S. Coast Guard five-year inspection. The work will include routine cleaning and painting, hull inspection, valve overhauls and steering system modifications. In addition to this, all of the ferry’s exterior fiberglass bench seats are being replaced with new aluminum bench seats. This is the second time this year Miller Boat Line, the vessel’s owner, has entrusted one of its vessels to Great Lakes Shipyard.

21 Sep 2010

Miller Showcases New Welding Equipment

The new XR-S and XR-D wire feeders (Image courtesy Miller Electric Mfg. Co.)

Miller Electric Mfg. Co. will showcase a wide range of new and popular welding products, technologies and safety accessories at the FABTECH 2010 show at the Georgia World Congress Center in Atlanta, November 2 – 4. Miller’s booth this year (#6811 in Hall C) will provide attendees with product selection clarity by featuring market specific solutions designed to address the specific needs and challenges of the manufacturing, fabrication, shipbuilding, construction and commercial welding markets. 15.

23 Sep 2010

NY Power Authority’s Havasu II to be Christened

The New York Power Authority’s newly constructed pedestal crane barge will be christened at Great Lakes Shipyard, Cleveland, Ohio. The christening ceremony will take place on Thursday, September 23, 2010, beginning at 11 a.m. The barge will be utilized for deployment and retrieval of an ice boom placed across the Niagara River at Buffalo New York to prevent ice from blocking the hydro-electric water intakes of the New York Power Authority. Bristol Harbor Group Inc., Bristol, Rhode Island, designed the barge for New York Power Authority and also acted as its representatives during construction. Ronald C. Rasmus, President and CEO of The Great Lakes Group, will be the ceremony’s principal speaker.

11 Nov 2010

Great Lakes Shipyard Builds Barges for Corps of Engineers

Photo courtesy Great Lakes Shipyard

Great Lakes Shipyard, Cleveland, Ohio, completed construction and delivery of two new barges for the U.S. Army Corps of Engineers. The barges will be used to perform critical maintenance and inspections of lock and dam facilities on the upper Mississippi River lock and dam section. One of the barges will service Lock and Dam 16 in Illinois City, Ill. while the other one will service Lock and Dam 18 in Gladstone, Ill. Great Lakes Shipyard, a division of The Great Lakes Towing Company…

09 Feb 2005

Construction of Marine Science Vessels Up

Marine science is making great strides forward due in large measure to several new vessels that have delivered recently and others under construction Headlining this news is the Oscar Dyson, the first of four vessels loaded with scientific gear that the National Oceanic and Atmospheric Administration (NOAA) is having built at VT Halter Marine, Pascagoula, Miss. The first vessel was completed in September of 2004 and as the Oscar Dyson was being completed, the contract for the second vessel, Henry B. Bigelow was announced. These 208-ft. by 49-ft. vessels have cutting edge capabilities to gather scientific information on fish populations and the water quality of their habitat.