Marine Link
Friday, April 19, 2024
SUBSCRIBE

Gulfport Facility News

14 Jul 2020

USMI’s Family Recipe

Special Warfare Combatant-craft Crewmen conduct a Maritime External Air Transportation System training evolution in Moses Lake, Wash. (U.S. Army photo by Christopher Prows)

Barry Dreyfus Jr., CEO of United States Marine Inc. (USMI), doesn’t keep the recipe to his company’s success a secret. In fact, it’s displayed plainly for all to see on the homepage of USMI’s website: family, integrity and quality. These have been cornerstones of the 36-year-old firm, today regarded as one of the nation’s premier military small craft builders.Headquartered in Gulfport, Miss., with a maintenance/repair facility in Chesapeake, Va., USMI is a fully integrated manufacturer of military, patrol and special warfare boats available in lengths from 21 feet to 90 feet.

29 May 2020

USMI: 35 Years and Going Strong

Spanning 35 exciting years, USMI’s core values of Family, Integrity and Quality have served the firm and its military customers well. The next 35 promise to be just as compelling.Little more than one month ago, on April 16, 2019, Gulfport, MS-based United States Marine Inc. (USMI) celebrated its 35th anniversary of continuous Department of Defense production, with hopes of many more years to come. According to CEO and President Barry Dreyfus, Jr., they’ll do just that by exceeding customer expectations by adhering to USMI’s core values of Family, Integrity and, of course, Quality. Over three and one-half decades, the firm has thrived, primarily by evolving into one of the nation’s premier military small craft builders.RootsThe company originally built World Class racing sailboats.

07 Nov 2013

Ingalls Reports Third Quarter Results

Mike Petters, HII president and chief executive officer

Huntington Ingalls Industries (HII), a company that designs, builds and maintains nuclear and non-nuclear ships for the U.S. Navy and Coast Guard and provides after-market services for military ships around the globe, reported third quarter 2013 revenues of $1.64 billion, up 2.6% from the same period last year. Third quarter diluted earnings per share was $1.36, compared to $0.26 in the same period of 2012. Segment operating income in the third quarter was $142 million, compared to $89 million in the same period last year.

04 Sep 2013

Ingalls to Close Gulfport Facility Due to Reduction in Navy Builds

Ingalls Shipbuilding's Gulfport facility during the build of U.S. Navy’s second Zumwalt-class guided missile destroyer, Michael Monsoor (DDG 1001) in April 2013 (Photo: HII)

Huntington Ingalls Industries (HII) announced today the closure of its Gulfport Composite Center of Excellence in Gulfport, Miss. "This is a difficult but necessary decision," said HII President and CEO Mike Petters. "Due to the reduction in the Zumwalt-class (DDG 1000) ship construction and the recent U.S. Navy decision to use steel products on Lyndon B. Current work being performed at Gulfport is expected to be completed by the end of the first quarter of 2014, with closure expected by May 2014.

08 Apr 2013

Ingalls Gulfport Facility Reaches Milestone

Ingalls Shipbuilding's Gulfport facility recently turned the DDG 1001 hangar ship shape to allow final outfitting.

Huntington Ingalls Industries announced  its Ingalls Shipbuilding division achieved a milestone in the construction process of the composite hangar that will be used on the U.S. Navy's second Zumwalt-class guided missile destroyer, Michael Monsoor (DDG 1001). Recently, the shipbuilders at the company's Gulfport, Miss., facility turned the inverted hangar to an upright position, or ship-shape, which is an important and necessary feat in the construction schedule of this component.

01 Jun 2012

Supplying Brazil's Booming OSV Market

Local equipment suppliers reap dividends, but there’s room for foreign businesses – if they know how to play. After huge oil finds in recent years, Brazil's need for offshore vessels continues to expand and could double between now and the end of the decade. Brazil's state-run oil company Petrobras wants to extract billions of barrels of oil while also developing its shipbuilding and service industries to create jobs. Meanwhile, Brazil is trying to use locally made vessels and equipment, but foreign companies are benefiting from the nation's oil bonanza too.

18 Jan 2012

US Navy: DDG 1000's Composite Deckhouse Milestone

Composite materials are used to make cars, planes and boats, and have been used to build minesweepers and small surface combatants. Now, the largest composite structure ever built—the DDG 1000 destroyer deckhouse—has been fabricated in Mississippi and is being shipped to Maine for assembly aboard the future USS Zumwalt (DDG 1000). In this dramatic example of a “shared build,” General Dynamics Bath Iron Works is the lead yard, but the superstructure and hangar are being built at Huntington Ingalls Industries (formerly Northrop Grumman Ship Systems) Composite Center of Excellence at Gulfport…

05 Dec 2011

Ingalls Wins $46m for DDG 1002 Work

The deckhouse for DDG 1000, the first Zumwalt-class destroyer, is currently under construction at Ingalls Shipbuilding's Composite Center of Excellence in Gulfport, Miss. (Photo: HII)

Huntington Ingalls Industries (NYSE:HII) announced that the company's Ingalls Shipbuilding division has been awarded an advance procurement contract for work on the U.S. Navy's third Zumwalt-class destroyer, DDG 1002. The contract is valued at $46 million, with the majority of the work taking place at the company's Composite Center of Excellence in Gulfport. "Strategically, this is a very important contract to our company and specifically to the composite shipbuilders working in Gulfport," said Karrie Trauth, Ingalls Shipbuilding's DDG 1000 program manager.

03 Aug 2010

NG Shipbuilding Gulfport Awarded OSHA Star Status

Photo courtesy Northrop Grumman

Northrop Grumman Corporation (NYSE:NOC) Shipbuilding's facility in Gulfport, Miss. has been recognized for exemplary shipyard safety and received "star" status in the U.S. Occupational Safety and Health Administration (OSHA)-sponsored Voluntary Protection Program (VPP). OSHA representatives presented the official VPP star status certification and flags to management and shipbuilders working at the Gulfport facility on July 29.

15 Feb 2008

Northrop Grumman Gets $1.4b DDG 1001 Contract

The U.S. Navy awarded Northrop Grumman Corporation a $1.4b cost plus incentive fee contract for the construction of a Zumwalt-class destroyer, DDG 1001, as well as major components for the DDG 1000. The contract was awarded to Northrop Grumman Shipbuilding, a newly-formed company sector comprising the former Ship Systems and Newport News shipbuilding sectors. Northrop Grumman Shipbuilding's Gulfport facility will build the composite deckhouse for all DDG 1000 class destroyers; this award includes the construction of the deckhouse for DDG 1000.

06 Apr 2004

Senesco Marine Expansion Continues

Senesco Marine hired Norman Hodge as Vice President of new construction. Most recently Hodge was General Manager of Conrad's in Orange, Texas. Prior to working for Conrad's he was the Plant Manager at Halter Marine's Gulfport facility in Mississippi. During that time he was in charge of operations at three shipyards with a total of 500 employees. Hodge has been directly involved in the construction of over two thousand barges of various types and design over the years. At Senesco Marine, Hodge will oversee the construction of all new barges. Last year Senesco Marine launched two 80,000-barrel double-hulled liquid fuel barges. This year the shipyard plans to launch two more 80,000-barrel double-hulled barges along with a 100,000-barrel double-hulled barge.

07 Apr 2000

Contracts

Friede Goldman Halter, Inc. announced that it has recently finalized six new contracts with a total value of approximately $40 million. -The Venezuelan government for the construction of two 153-foot LCU-type logistics support vessels. Financing for the project has been secured through the Export-Import Bank and all guarantees have been obtained. Construction for the vessels is anticipated to begin during the second quarter at the company's Moss Point Marine shipyard in Escatawpa, MS and delivery is slated for the fourth quarter of 2001. -Atwood Oceanics for the design and construction of a deepwater mooring system. The 8-point combination traction-winch/windlass mooring system will be installed on the Atwood Eagle…

06 Apr 2000

Friede Goldman Halter Finalizes $40 Million In New Contracts

Friede Goldman Halter, Inc. announced that it has recently finalized six new contracts with a total value of approximately $40 million. · The Venezuelan government for the construction of two 153-foot LCU-type logistics support vessels. Financing for the project has been secured through the Export-Import Bank and all guarantees have been obtained. Construction for the vessels is anticipated to begin during the second quarter at the company's Moss Point Marine shipyard in Escatawpa, MS and delivery is slated for the fourth quarter of 2001. · Atwood Oceanics for the design and construction of a deepwater mooring system. The 8-point combination traction-winch/windlass mooring system will be installed on the Atwood Eagle…

17 May 2006

Northrop Grumman Reworks Hurricane Plans

According to the AP, with the next hurricane season two weeks away, Northrop Grumman Ship Systems has made changes in its plans to protect its coastal shipbuilding facilities and recover from a storm as powerful as Hurricane Katrina, a company official said Tuesday. Northrop Grumman, which bills itself as the world's largest military shipbuilder, will evacuate workers and start securing its facilities in Pascagoula, Gulfport and New Orleans at least 24 to 36 hours earlier than it typically did for past hurricanes, officials said. Vehicles and equipment will be moved to higher ground. Water, food, generators and gasoline will be stockpiled in greater quantities. Fewer workers will stay behind to ride out the storm.

01 Nov 2005

Full Speed Ahead for Trinity Yachts

Trinity Yachts, LLC has moved one ) nearly completed yacht and four of their partially built yachts over to their new production facility in Gulfport, Miss. These yachts were towed through the Intracoastal waterways that are strewn with sunken or damaged fishing and pleasure boats left over from Hurricane Katrina. According to John Dane III, President of Trinity Yachts, “The last eight weeks have been very hectic since hurricane Katrina stuck, and with the Ft. Lauderdale International Boat Show quickly approaching, we really haven’t had a chance to pause and reflect on how far we have come. The modern shipyard based in Gulfport, MS., has over 9 acres/3.6 hectares (392,040 sq. ft./119,493 sq. m) of covered building area situated on approximately 50 acres/20.5 hectares of land.

13 Sep 2002

Retired Rear Adm. Foley to Head Northrop Grumman Gulfport Facility

Northrop Grumman Corporation's Ship Systems sector announced today that retired Rear Adm. John B. "Jay" Foley III, USN, one of the U.S. Navy's outstanding leaders during a 33-year career, has been named vice president of the company's shipbuilding operations in Gulfport, Miss. The company said that Foley, who recently retired from the Navy as commander, Naval Surface Force, U.S. Atlantic Fleet, will bring his leadership and naval expertise to the Gulfport facility beginning Sept. 16, 2002. "We are delighted to have Jay Foley joining our team," said Dr. Philip A. Dur, Northrop Grumman corporate vice president and president of the company's Ship Systems sector.

12 Nov 1999

TDI-Halter Builds First Super 116-C Jackup Rig

TDI-Halter, the Offshore Division of Halter Marine Group, Inc., recently completed the new construction of the first LeTourneau Super 116-C design jackup drilling rig for Perforadora Central, S.A. de C.V. The jackup was christened Tonala by Gabriela Alvarez-Morphy, wife of Patricio Alvarez-Morphy, president and CEO. Halter utilized its rig and marine shipyards for the construction of Tonala. The three 46 ft. diameter spudcans, built at the South Yard, and three 477 ft. long legs, fabricated at the Orange Yard, were built in Texas and transported by barge to the Pascagoula facility. The wingtank modules and accommodation block were built in Mississippi at Halter's Gulfport facility. The cantilever beams were fabricated by Superior Fabricators in Louisiana, and installed in Pascagoula.

05 May 2000

News

Litton Ingalls Shipbuilding signed a Memorandum of Agreement (MOA) with SeaAmerica Cruise Lines, Inc., based in Hollywood, Fla. Under the MOA, LSS and SeaAmerica will develop a ship design leading to contract negotiations for the construction of two 42,000-ton, 1,000-passenger cruise ships. The program will include options for two additional ships. Construction of the ships would utilize both of Litton Ship Systems' production facilities, Litton Ingalls Shipbuilding in Pascagoula and Litton Avondale Industries in New Orleans, and would maximize the resources and experience of both shipyards to achieve operating synergies. Accommodations will include 87 percent outside cabins (most with private balconies)…

10 Jun 2003

Northrop Grumman’s Ship Systems Breaks Ground on Modernization Project

at its Ship Systems sector's Gulfport Operations in Gulfport, Miss. The modernization project is expected to create the first large-scale advanced composite manufacturing facility to produce U.S. Navy and U.S. Coast Guard ships. The modernization will dedicate $30 million to increasing capacity for composite construction, $19 million for ship construction and outfitting improvements, $8 million for additional support facilities, and $7 million to upgrade distributive systems. Mississippi Gov. Ronnie Musgrove, principal speaker at the ceremony, told more than 200 guests and shipbuilders in attendance about the partnership between Northrop Grumman and the state and how this expansion project will economically benefit all parties involved.

07 Sep 2005

Northrop Grumman Update for Gulf Employees

information. [email protected] . http://www.navsea.navy.mil. accounted for and their needs are being addressed. operating at full capacity and may be experiencing high call volume. connecting with the (877) 744-7642 number try to call at a later time. This number is staffed 24 hours a day. reach the number to remain patient if asked to hold. normal production no earlier than, Sunday, Sept.11. should continue to report to work for 7 a.m. to 6 p.m. shifts. to work if possible, for a 7 a.m. to 6 p.m. transportation and managers in finance, estimating and contracts. normal production no earlier than, Sunday, Sept.11. if possible. overnight. Sept. 2 and Sept. time worked. employee this Friday, Sept. period ending Sept. 80 hours of pay. Direct Deposit Update for Sept. deposits.

21 Sep 2005

Northrop Grumman's Gulfport Facility Operational Following Katrina

Katrina recovery efforts. response cutter for the U.S. Coast Guard. and launched at the facility since 1996. begin mid-next year. (CHSV) test article being constructed for the Office of Naval Research. which will mitigate risks for manufacturing large composite hull forms. Systems sector. U.S. Coast Guard. phase of the fast response cutter program. surveillance and reconnaissance (C4ISR) and logistics support. as an asset in the Integrated Deepwater System. critical design review, on track to occur in December or January. construction in Gulfport mid-next year. four Osprey (MHC 51)-class coastal mine hunters in the mid 1990s. specifically adapted to meet post-9/11 mission requirements. will be made out of glass-reinforced plastic laminate. exceptional response and reaction capability.