Marine Link
Friday, March 29, 2024
SUBSCRIBE

Healthcare Industries News

24 Sep 2014

Foster Wheeler For Air Quality Control System Upgrade In West Virginia

Foster Wheeler AG announced today that a subsidiary of its Global Power Group’s Environmental and Industrial division has been awarded a contract by Longview Power, LLC to rehabilitate and optimize the wet flue gas desulfurization system at their existing 700 MWe (net megawatt electric) Longview Power facility in Maidsville, West Virginia, USA. Foster Wheeler has received a full notice to proceed on this contract. The terms of the agreement were not disclosed, and the contract value will be included in the company’s third-quarter 2014 bookings. Foster Wheeler will provide new components as well as engineering and installation services to optimize the performance of the existing dewatering and forced oxidation systems with the fuel currently being used by Longview.

23 Jun 2014

Foster Wheeler Signs Agreement With BOC to Replace Heat Exchangers

Foster Wheeler AG announced today that a subsidiary of its Global Engineering and Construction Group has signed an engineering, procurement and construction management (EPCm) services agreement with BOC, a member of the Linde Group, for the installation of replacement heat exchangers at BOC’s Teesport facility, Teesside, in northeast England. The Foster Wheeler contract value was not disclosed and was included in the company’s first-quarter 2014 bookings. Under this agreement, Foster Wheeler will provide project management, front-end engineering design, detailed engineering design, procurement services, construction supervision and quality assurance for the replacement of existing aluminium plate fin exchangers in the 1,300 tons per day air separation plant.

17 Jun 2014

Foster Wheeler Wins Contract For Retrofit-SCR System

Foster Wheeler AG (Nasdaq: FWLT) announced today that a subsidiary of its Global Power Group has been awarded a contract by Turun Seudun Energiantuotanto Oy (TSE) for the design, supply and erection of a retrofit-selective catalytic reduction (SCR) system for TSE’s Naantali unit 3 in Finland. Foster Wheeler has received a full notice to proceed on this contract. The terms of the agreement were not disclosed, and the contract value will be included in the company’s bookings for the second-quarter of 2014. Commercial operation of the SCR system is scheduled for October 2015. Foster Wheeler will design, supply, erect and commission the selective catalytic NOx reduction system for the Naantali 125 MWe pulverized coal fired boiler (unit 3).

28 May 2014

Foster Wheeler's Terrace Wall Steam Reformer Heater For Kazakhstan

Foster Wheeler AG (Nasdaq:FWLT) announced today that a subsidiary of its Global Engineering and Construction Group has been awarded a contract by Marubeni Corporation for the engineering and material supply of a new Terrace Wall steam reformer heater, including an air preheating system, for the KazMunayGaz oil refinery located at Atyrau, Republic of Kazakhstan. The value of Foster Wheeler’s contract was not disclosed and was included in the company’s first-quarter 2014 bookings. The steam reformer will be part of a hydrogen production unit with a capacity of 24,000 normal cubic meters per hour to be built at the refinery. The hydrogen plant is based on Foster Wheeler’s hydrogen technology. Foster Wheeler’s scope of work is scheduled to be completed in April 2015.