Marine Link
Thursday, March 28, 2024
SUBSCRIBE

Kjell E Jacobsen News

23 Dec 2003

Contract Extension on the Ula and Valhall Fields

Smedvig has signed an agreement with BP Norge AS to extend the platform drilling contract on the Ula and Valhall fields in the Norwegian sector of the North Sea. years, with option for one additional year. The estimated contract value for the firm period is approximately NOK 300 million. The contract, which is expected to employ some 200 people, includes in the first phase production drilling from the Valhall injection platform and the Valhall drilling platform. Smedvig has been the drilling contractor on the Ula field since production start-up in 1986 and the drilling contract on the Valhall field since 2000. Norwegian continental shelf," says Kjell E. Jacobsen, CEO, Smedvig asa.

19 Jan 2004

Smedvig Secures Contract Extension for West Venture

Smedvig has signed an agreement with Norsk Hydro to extend the drilling contract for the semi-submersible drilling rig West Venture. The extension of the drilling contract has a firm duration of two years and in addition, annual renewal options for five more years. The estimated contract value for the firm period is US$ 150 million (approximately NOK 1 billion) and includes an incentive scheme related to drilling performance. West Venture is equipped with a dual derrick set allowing for enhanced drilling efficiency. The dual drilling system is especially advantageous in completion of subsea production wells. West Venture has operated…

18 Mar 2004

Smedvig Secures New Contract

Smedvig has been awarded a letter of intent by A/S Norske Shell for the assignment of the deepwater drillship West Navigator on the Ormen Lange field in the Norwegian Sea. The assignment includes drilling of eight deepwater wells in approximately 900 meters of water, with options for four additional wells. The contract value for the firm part of the contract is estimated to US$ 167 million (NOK 1.17 billion). The commencement is planned in the second half of 2005. The drilling period for the firm part of the contract is estimated to 740 days, while the option period could have a duration up to one year. The assignment is subject to final government approval of the Ormen Lange project.

25 Mar 2004

Hvide New President of NSA

The annual General Assembly of The Norwegian Shipowners’ Association has today elected shipowner Johan G. Hvide, Seatrans DA in Bergen, as President for a two years period. Mr. Hvide was unanimously proposed and was elected by acclamation. Elisabeth Grieg from Grieg International AS in Oslo and Trygve Seglem from Knutsen OAS Shipping AS in Haugesund were elected Vice Presidents. President: Johan G. Kjell E.

02 Apr 2004

Smedvig to Build New Semi-Tender

Smedvig has entered into an agreement with Keppel Shipyard in Singapore for the purpose of building a new semi-submersible self-erecting tender rig (semi-tender). Total capital expenditure for the new semi-tender is estimated at $ 94 million, of which Smedvig's share is approximately $ 29 million. The agreement with Keppel Shipyard is based on the principle that Keppel shall build and own the the semi-submersible hull, and Smedvig shall own the derrick equipment set. Smedvig shall for a period of ten years be responsible for marketing, management and operation of the unit. The agreement includes an option for Smedvig to purchase the semi-submersible hull during the ten-year period at a pre-agreed price.

08 Jan 2003

Smedvig to Build New Tender Rig in Southeast Asia

Smedvig has entered into an agreement with Malaysia Shipyard and Engineering Sdn Bnd in South Malaysia for the purpose of building a new self erecting tender rig. including the derrick equipment set. which will significantly increase drilling efficiency. and deepwater areas in Southeast Asia. Smedvig.

22 Nov 2002

Smedvig Sells West Vanguard

Smedvig has signed a contract for the sale of the semi-submersible drilling rig West Vanguard to Diamond Offshore Drilling Ltd. The agreed sales price for the drilling rig, which was built in 1982, is $ 68.5 million. The hand-over of the rig is planned for December 2002. West Vanguard is today assigned to Norsk Hydro on the Norwegian continental shelf. Smedvig will bareboat charter the rig until the end of the present contract. Smedvig and Diamond Offshore will cooperate to ensure a smooth transition of management of the rig including arrangements for securing employment for the employees on West Vanguard. "The sale releases capital for new investment opportunities", says CEO Kjell E Jacobsen in Smedvig.