Marine Link
Wednesday, April 24, 2024
SUBSCRIBE

Lula News

27 Mar 2024

Brazilian Built Submarine with French Tech Launched

(Photo: Naval Group)

The presidents of France and Brazil on Wednesday launched a submarine built in the South American country with French technology in a program that aims to build Brazil's first nuclear-powered submarine by the end of the decade.Presidents Emmanuel Macron and Luiz Inacio Lula da Silva attended a ceremony in the Itaguai shipyard near Rio de Janeiro, launching the third diesel-powered submarine built in a $10 billion partnership.Brazil first lady Janja da Silva smashed a champagne


24 Nov 2023

Petrobras to Invest $102 Billion in Next Five Years

Source: Petrobras

Brazil's Petrobras will invest around $102 billion within the 2024-2028 period, the firm's new strategic plan showed on Thursday, representing a major boost in expected investments by the state-run oil company.The plan, the first released by the oil giant since CEO Jean Paul Prates took the helm of the company, includes investments in a range of different segments, with most of it going into oil exploration and production.The figure represents a 31% leap from the $78 billion Petrobras


02 Mar 2023

Israel Urges Brazil to Undock Iranian Warships

© Thalma / Adobe Stock

Israel on Thursday criticised Brazil's decision to grant berth to two Iranian warships in the face of U.S. pressure, and urged President Luiz Inacio Lula da Silva's government to send them away.The vessels docked in Rio de Janeiro on Sunday. Reuters reported that Brazil had declined to admit them in January, in a goodwill gesture from Lula as he flew to Washington to meet U.S. President Joe Biden.Israel and Iran have been locked in a Cold War-style conflict for decades, which has included mutual accusations of maritime sabotage


07 Feb 2023

Brazil Govt Will Promote Recovery in Shipbuilding, Oil & Gas, President Lula Says

Brazilian President Luiz Inacio Lula da Silva - Credit: PalĂĄcio do Planalto - CC BY 2.0

Brazilian President Luiz Inacio Lula da Silva said on Monday his government would promote recovery in the country's shipbuilding and oil and gas sectors, with more investment from state-run oil firm Petrobras SA  and development bank BNDES. "Petrobras will return to invest here in Rio de Janeiro and the BNDES will invest more in the country's productive sectors," he said during the inauguration of a health facility in Rio de Janeiro state. (Reuters - Reporting by Rodrigo Viga Gaier; Editing by Sarah Morland)

22 Dec 2022

Brazil Will Halt Santos Port Privatization

© Cifotart / Adobe Stock

Brazil's government will not proceed with the privatization of the port of Santos, the largest in Latin America, the incoming minister of ports and airports was quoted as saying on Thursday by a Brazilian newspaper.Marcio Franca, tapped to head the ministry in President-elect Luiz Inacio Lula da Silva's government, told O Estado de S. Paulo's online edition that the decision had been made not to privatize the port, located just southeast of Sao Paulo and a key gateway for exports of agricultural commodities including soybeans and sugar.Franca could not be reached for comment on the decision


01 Nov 2022

Main Road to Brazil's Paranagua Port, Major Grain Export Hub, Still Blocked

©Portos do Parana

The main access road to Brazil's Paranagua port, the country's second busiest for grain exports, remained blocked by political protesters on Tuesday, according to a statement from the port authority, hobbling shipping from one of the world's top food producers. Blockades in the area were first reported Monday afternoon after similar demonstrations erupted throughout the country as supporters of outgoing Brazilian President Jair Bolsonaro protested against his narrow election loss to leftist Luiz Inacio Lula da Silva.

24 Sep 2019

Equinor to be ‘Offshore Wind Major’

The multi-billion capital investment by Equinor at its new Dogger Bank Offshore Wind Farm will see it rival its major oil and gas projects, according to Rystad Energy."The offshore wind project Dogger Bank in the UK North Sea will not only be Equinor’s largest project through 2026, it will also rank as the sixth largest offshore development project in the world during this period," said the energy research firm.UK authorities announced on Friday that Equinor and joint venture partner SSE have been chosen to develop the world’s largest offshore wind farm, Dogger Bank, with an expected $11 billion in capital investments from 2020-2026.Audun Martinsen


13 Feb 2019

Video: FPSO Travels from China to Brazil

(Photo: Boskalis)

Dutch firm Boskalis transported the 90,000-ton FPSO P-67 from Qingdao, China to Rio de Janeiro, Brazil, aboard the semi-submersible heavy transport vessel BOKA Vanguard.FPSO P-67 was built by China’s Offshore Oil Engineering Company (COOEC), and delivered to Brazil's Petrobras in 2018.The FPSO recently began producing in the deepwater Lula Norte area, in the pre-salt of Santos Basin offshore Brazil.

19 Jul 2018

Petrobras to Start Up Four New Platforms in Q4

Brazil's state-controlled oil company Petrobras will start pumping pre-salt oil from four new platforms between October and December, the company's director for production and technology development Hugo Repsold said on Wednesday.Speaking to reporters at an oil industry event, he said Petrobras could study building its own platforms after 2022 and predicted the company would head towards sustainable growth of oil production in the next few years.The four new platforms in the Santos basin are the P-67 and P-69 in the Lula oil field, and the P-75 and P-76 in the Buzios fields.

16 Jan 2018

Petrobras: Fire Contained on Platform in Lula Field

File photo: P-66 FPSO sailing to its final destination (Courtesy Petrobras)

Brazil's state-controlled oil company Petróleo Brasileiro said on Tuesday a fire at a platform in the Santos Basin was contained and did not cause injuries or environmental damage.   Production there remains halted until safety tests can be completed, the company said. The fire was discovered early on Tuesday on a floating production storage and offloading (FPSO) unit in the Lula Field. The unit is operated by Petrobras in consortium with Royal Dutch Shell and Petrogal .   Reporting by Marta Nogueira

07 Feb 2017

Keppel Delivers FPSO for Brazil

Keppel Offshore & Marine’s shipyard in Brazil, BrasFELS, has delivered P-66, the first of the Replicante series of floating production storage and offloading (FPSO) units, to Tupi BV. Keppel Offshore & Marine Ltd (Keppel O&M), through its wholly owned subsidiary, Keppel FELS Brasil SA's BrasFELS shipyard, has delivered the FPSO P-66 to Tupi BV (a consortium formed by Petróleo Brasileiro S.A. - Petrobras, operator with 65 percent; BG E&P Brasil - a subsidiary of Royal Dutch Shell plc, with 25 percent; and Petrogal Brasil with 10 percent), which is represented by Petrobras. P-66 departed the shipyard on February 4, 2017 to be deployed in the Lula Sul field, Santos Basin, Brazil. BrasFELS was engaged for two Replicante projects, P-66 and P-69.

07 Feb 2017

Petrobras:P-66 leaves shipyard for Lula field

On Saturday (February 4), the floating production, storage and offloading vessel (FPSO) P-66 left the Brasfels shipyard in Angra dos Reis, Rio de Janeiro. It is now heading to the Lula Sul module in the Lula field, Santos Basin pre-salt, where it is expected to arrive in the next few days. The production system will come online after the vessel has been moored and the first production well has been connected. P-66 is the Lula Consortium’s first FPSO to be deployed in the Santos Basin pre-salt. It was assembled at the Brasfels shipyard in Angra dos Reis, where the equipment and systems were also tested. The FPSO will separate the oil from the gas and water during the production process, storing it in tanks, and finally transferring it into oil tankers, which will then transport it.

05 Feb 2017

Nazi Sub Found in the Atlantic Ocean

A Nazi submarine that sunk in the Atlantic Ocean during World War II has been unearthed by German researchers off the coast of the Azores in the middle of the Atlantic Ocean, AP reports. The same type of submarine - 67m-long VIIC U-boat - was portrayed in Steven Spielberg’s classic film Raiders of the lost Ark. The Rebikoff-Niggeler Foundation says the wreck of U-581 was found last September at a depth of about 900 metres near the Azores island of Pico. The U-581 was tasked with taking down the British squad carrier Llangibby Castle in February 1942, but it failed the mission and was sunk by the British destroyer Westcott before it could finish the job.

27 Dec 2016

Arpoador Shipyard and Pre-salt FSVs

Logistics hubs and Fast Supply Vessels will be key assets in the complex offshore transport solution Petrobras has devised for moving workers and goods, to and from Brazil’s remote pre-salt plays. Here is a look at a modern local shipyards building the heavy-duty aluminum vessels, with overall lengths ranging from over 30 meters to around 50 meters. Claudio Paschoa, Maritime Reporter’s correspondent in Brazil spoke to Flavio Santarelli, Arpoador Shipyard’s Director of Operations. The logistics involved in transporting supplies and people to the production FPSOs located as far as 300km offshore has been daunting. Offshore logistics hubs


11 Jul 2016

Petrobras Bringing Two FPSO Platforms Online

Cidade de Saquarema (File photo: SBM Offshore)

Brazil's state-led oil company Petroleo Brasileiro SA is working hard to meet its production targets, the company's head of exploration and production, Solange Guedes, said on Monday in a telephone interview.   Guedes said the company's floating, production, storage and offloading ship (FPSO) named Cidade de Saquarema could begin operations in the Lula Central field this month and that she expects that Cidade de Caraguatatuba FPSO in the Lapa field to start operations in August.     (Reporting by Marta Nogueira; Writing by Jeb Blount)

31 May 2016

Petrobras Announces new President, Management Changes

Petrobras reports that it has received the letter of resignation of Mr. Aldemir Bendine the functions of a member of the Board of Directors and President of the Company today. In addition, Mr. Bendine also resigned today, the office of member of the Board of Directors of Petrobras Distribuidora - BR. In view of the resignation, the Board held a special meeting that has elected Pedro Pullen Parente engineer as a member of the Board of Petrobras today. The Council at the same meeting also elected Mr. Pedro Parente for the office of President of the Company since 05.31.2016 and has appointed the Director of Human Resources, Safety, Environment and Health and Human Services, Hugo Repsold Junior, for the interim exercise of the functions of the President of the Company.

19 May 2016

Heavy LIfting: Moving Modules for Brazilian FPSO

Load-out of the fourth module onto the module carrier MV Mega Trust using Mammoet’s SPMTs. (Photo: Mammoet)

On April 6, Mammoet, a service provider specializing in engineered heavy lifting and transport, completed a load-out of the first set of four modules bound for the FPSO (Floating Production, Storage and Offloading) P66 vessel. This is the first of eight FPSOs currently under construction for oil production in Brazil. The end client, TUPI BV, is a consortium composed of Petrobras Netherlands BV (PNBV, 65 percent), the British Gas Group (BG Group, 25 percent) and Galp Energia S.A. (10 percent), working on the ongoing development of the Lula Alto field, located in the Santos Basin, Brazil.

06 Apr 2016

Keppel Secures MODEC FPSO Project in Brazil

Keppel Offshore & Marine Ltd, through subsidiary Keppel FELS Brasil SA's BrasFELS shipyard, has been awarded a Floating Production Storage and Offloading (FPSO) module fabrication and integration project by its repeat customer MODEC Offshore Production Systems (Singapore) Pte. Ltd., a MODEC, Inc. group company, for a contract value of over BRL 500 million (SGD190 million). BrasFELS' work scope for this project comprises the fabrication and integration of nine topside production modules for the FPSO Cidade de Campos dos Goytacazes MV29. The vessel is expected to arrive at the shipyard by the first quarter of 2017 for the integration phase.

06 Apr 2016

Keppel Bags BRL 500 mln MODEC Project

Keppel Offshore & Marine Ltd (Keppel O&M), through its subsidiary, Keppel FELS Brasil SA's BrasFELS shipyard has been awarded a Floating Production Storage and Offloading (FPSO) module fabrication and integration project by its repeat customer MODEC Offshore Production Systems (Singapore) Pte. Ltd., a MODEC, Inc. group (MODEC) company, for a contract value of over BRL 500 million (SGD190 million). BrasFELS' work scope for this project comprises the fabrication and integration of nine topside production modules for the FPSO Cidade de Campos dos Goytacazes MV29. The vessel is expected to arrive at the shipyard by the first quarter of 2017 for the integration phase.

05 Mar 2016

Brazil Onshore Assets for Sale produce 2% of Output

Brazil's state-run oil company Petroleo Brasileiro SA said on Friday it plans to sell its rights to 104 onshore oil and gas concessions, part of efforts to raise cash and focus increasingly scarce capital on more profitable offshore assets. The company, known as Petrobras, said in a securities filing that 98 of the areas are producing fields. Oil output from those areas is about 35,000 barrels a day, or less than 2 percent of the company's petroleum output and less than some single wells in Petrobras' giant offshore Lula field. The Petrobras statement did not say how much natural gas the areas produce. Six of the areas are still in the exploratory phase. Small Brazilian and international oil companies have long called on the company to sell the bulk of its onshore oil and gas portfolio.

01 Mar 2016

Offshore Brazil: Production Starts at FPSO Unit

In February, a second floating production, storage, and offloading (FPSO)* unit deployed by NYK for the BM-S-11 consortium through a joint venture company started oil production in a pre-salt area off Brazil. This FPSO unit, FPSO Cidade de Marica, is owned by a shareholder consortium comprising SBM Offshore N.V. (Netherlands), Queiroz Galvão Óleo e Gás S.A. (Brazil), and a joint venture company between NYK (48.72 percent; head office: Chiyoda-ku, Tokyo; president: Tadaaki Naito) and the Mitsubishi Corporation (51.28 percent; head office: Chiyoda-ku, Tokyo; president & CEO: Ken Kobayashi). The joint venture has a 20-year time charter contract with Petroleo Brasileiro S.A. (Petrobras) to operate the FSPO.

03 Oct 2015

Brazil Court Allows Lula Questioning in Petrobras Corruption Case

Brazil's Supreme Court authorized the questioning by Federal Police of ex-President Luiz Inácio Lula da Silva as a witness in a broadening corruption case focused on state-run oil company Petrobras , a spokesperson for the court said on Friday. (Reporting by Stephen Eisenhammer; Editing by Chris Reese)

01 Sep 2015

MODEC FPSO Achieves First off Brazil

FPSO Cidade de Itaguai MV26 (Photo: MODEC)

MODEC, Inc. announced today that its FPSO Cidade de Itaguai MV26, operating in the Iracema Norte area of Lula field, in the Pre-Salt layer of Santos Basin offshore Brazil, has achieved First Oil production on July 31, 2015, five months ahead of the schedule anticipated under the contract. The FPSO is chartered by Tupi B.V., a subsidiary of Petroleo Brasileiro S.A. (Petrobras), under a 20-year lease and operation contract. Moored 240 kilometers off the coast of Rio de Jeneiro at a water depth of around 2