Foreship Designs Wasaline Ferry
Naval architecture, design and marine engineering specialist Foreship has ensured that Wasaline ferry is designed for lean, green and flexible performance.According to a press release from the Finland-based marine engineering consultancy firm, energy efficiency, flexibility and optimised space availability will be built into the new Wasaline ferry that will transform freight and passenger connections between Umeå in Sweden and Vaasa in Finland. Last week, Kvarken Link converted a letter of intent with Finnish builder Rauma Marine Constructions into a firm contract to construct the Super 1A Ice Class ferry by 2021, with capacity for 1,500 lane metres of freight and 800 passengers.
Agreement to Develop Gas-Fueled Ships
Wärtsilä and Samsung Heavy Industries (SHI) have signed a co-operation agreement to develop gas-fuelled merchant vessels. The intention is to jointly develop next-generation ships with efficient and competitive propulsion machinery concepts that meet or exceed the demands of future environmental regulations. The focus of the Wärtsilä/SHI joint study will be on utilizing liquefied natural gas (LNG) as fuel for operating vessels. This is especially relevant in Emission Control Areas (ECAs). Wärtsilä's input will be related to the propulsion machinery, with particular reference to large bore, dual-fuel engines combined with mechanical propulsion solutions. SHI will concentrate on the design of highly efficient vessels incorporating fuel storage facilities and gas-powered propulsion machinery.
Wärtsilä to Supply Dual-Fuel Engines for Korean LNG Carriers
Wärtsilä has received an order from Hyundai Heavy Industries Co. Ltd. of Korea to supply four sets of Wärtsilä 50DF dual-fuel engines to power a series of 155,000 m3 dual-fuel-electric LNG carriers, with an option on four more sets. The ships were ordered last month by BP Shipping of the UK and are scheduled for delivery from Hyundai Heavy Industries' shipyard in Ulsan and Hyundai Samho Heavy Industries' shipyard in Mokpo from the middle of 2007 onwards. Each ship will be equipped with two twelve- and two nine-cylinder Wärtsilä 50DF dual-fuel engines with an aggregate power of 39.9 MW. Delivery of these engines from Wärtsilä's Trieste factory will commence in early 2006.