Marine Link
Thursday, April 25, 2024
SUBSCRIBE

Marys River News

30 Mar 2024

St. Marys River Reopened After Laker Strikes Channel Light

(Photo: U.S. Coast Guard)

The St. Marys River has reopened to vessel traffic after a U.S.-flagged Great Lakes freighter struck a channel light in the waterway.At approximately 1 a.m. on Thursday, the 730-foot bulk carrier American Mariner suffered a marine casualty and went bow-first into the Munuscong Junction Light, the U.S. Coast Guard said. The incident occurred in Munuscong Lake, which is a section of the St. Marys River in Michigan state.The American Steamship Company-owned vessel is operated by Grand River Navigation under a bareboat charter.

30 Mar 2024

Great Lakes Freighter Strikes Channel Light on St. Marys River

(Photo: U.S. Coast Guard)

A portion of the St. Marys River has been closed to vessel traffic after a U.S.-flagged Great Lakes freighter struck a channel light in the waterway.At approximately 1 a.m., the 730-foot bulk carrier American Mariner suffered a marine casualty and struck the Munuscong Junction Light with its bow, the U.S. Coast Guard said. The incident occurred in Munuscong Lake, which is a section of the St. Marys River in Michigan state.The American Steamship Company-owned vessel is currently operated by Grand River Navigation under a bareboat charter.

27 Mar 2024

US Coast Guard Cutter Sea Dog Damaged

(File photo: James Kimber / U.S. Coast Guard)

The U.S. Coast Guard Cutter Sea Dog (WPB 87373) sustained damage during the crew’s inbound transit from sea to the St. Marys River, Monday, the Coast Guard (USCG) said.The damaged cutter moored in Fernandina Beach, Fla., with assistance from additional Coast Guard assets and a commercial towing vessel, the USCG said.There were no reported injuries, damage to other vessels or environmental impact, and navigation remains unaffected, the agency added, noting the incident is under…

28 Mar 2023

NOAA, Coast Guard to Collect Data from a Great Lakes Icebreaker

(Photo: NOAA)

This week, NOAA's Office of Response and Restoration (OR&R) scientists worked with the U.S. Coast Guard during ice-breaking in Lake Superior Harbor in Duluth, Minnesota, aboard the Coast Guard Cutter Spar. This project is the first set of experiments funded by the newly developed Great Lakes Center of Expertise.Teams from both Coast Guard District 9 and NOAA deployed uncrewed aircraft system (UAS) with multispectral, thermal and LIDAR sensors to collect data while the Spar was breaking ice in the harbor.

29 Dec 2022

New Lock at the Soo Reauthorized in WRDA 2022 at $3.219 Billion

The New Lock at the Soo Artistic Rendering depicts how the Soo Locks will look once the New Lock at the Soo is complete in Sault Ste. Marie, Mich. (Image: USACE)

U.S. Army Corps of Engineers, Detroit District New Lock at the Soo Project in Sault Ste. Marie, Michigan is reauthorized in the Water Resources Development Act (WRDA) 2022 on Dec 23, 2022. The project reauthorization amount is $3.219 billion.An authorization sets how much money agencies and programs can receive, and how they should spend the money. This authorization makes it possible for the project to maintain efficient funding eligibility. Due to recent cost increases, the project cost was estimated to exceed the previously authorized spending limit.“With continued funding…

21 Oct 2022

New Lock at the Soo: Unlocking the Great Lakes

(Image: U.S. Army Corps of Engineers)

The U.S. Army Corps of Engineers, Detroit District works on unlocking the Great Lakes by providing a much-needed resiliency at the Soo Locks with the construction of the New Lock at the Soo. The New Lock at the Soo will be the same dimensions as the Poe Lock, 1,200 feet long, 110 feet wide and 30 feet deep.Often called the “linchpin” of the Great Lakes navigation system, the Soo Locks are located in Sault Ste. Marie, Michigan between the upper Peninsula of Michigan and the Canadian province of Ontario. The Soo Locks enable bulk carrier vessels to safely bypass the swift-moving St.

19 Oct 2022

USACE Orders Crane Barge for St. Marys River

(Image: U.S. Army Corps of Engineers)

The U.S. Army Corps of Engineers, Detroit District in concert with the Philadelphia District and the Marine Design Center awarded a 11.4 million contract to Southwest Shipyard in Houston for a new crane barge on the St. Marys River.“The new crane barge will perform critical lock and hydropower facility maintenance at the Soo Project Office (Soo Locks),” said Justin Proulx, Chief of the St. Marys River Section. “Additionally, the new vessel will support channel maintenance and will be ready to respond to critical maritime incidents on the St Marys River…

06 Jul 2022

USACE Awards $1 Billion Contract for New Lock at the Soo Phase 3

The New Lock at the Soo Artistic Rendering depicts how the Soo Locks will look once the New Lock at the Soo is complete in Sault Ste. Marie, Mich. (Image: Ricky Garcia / USACE)

The U.S. Army Corps of Engineers' Detroit District said it anticipates Phase 3 construction will start this summer following a $1.068 billion contract for the New Lock at the Soo Phase 3 awarded July 1, 2022.This contract allows the contractor Kokosing Alberici Traylor, LLC (KAT), a joint venture headquartered in Westerville, Ohio to begin constructing the largest phase, the new lock chamber and rehabilitation of the downstream approach walls. With continued funding, the remaining work, valued at $803.95 million may be awarded over the next three years.

11 Jan 2022

Canadian Coast Guard Begins Great Lakes Icebreaking

CCGS Samuel Risley performs icebreaking duties on the St. Marys River, Ontario in March 2021. (CNW Group/Canadian Coast Guard)

The Canadian Coast Guard's (CCG) annual icebreaking season on the Great Lakes, which provides assistance to the shipping industry, is underway. Working in partnership with the U.S. Coast Guard (USCG) District 9, the CCG has two icebreakers assigned to the Great Lakes for the entire winter season: CCGS Griffon and CCGS Samuel Risley. These vessels are supported as required by additional CCG vessels after the St. Lawrence Seaway reopens in March 2022.Although the St. Lawrence Seaway, Welland Canal and Sault Ste.

21 Apr 2021

New Soo Lock Construction Begins

Joint venture contractors Kokosing-Alberici mobilize some of their equipment to the New Lock at the Soo site on April 13, 2021 in Sault Ste. Marie, Mich. (Photo: USACE)

The U.S. Army Corps of Engineers (USACE) said the New Lock at the Soo project is on schedule as construction resumes on phase one and is initiated on phase two this week.Trade West Construction, Inc., and joint venture Kokosing-Alberici began moving equipment to the site the week of April 12 and 19.Trade West continues phase one, deepening the upstream channel to the Sabin and Davis Locks, which will be replaced by the new lock. USACE officials expect phase one completion in November 2021.Kokosing-Alberici is starting phase two this year, rehabilitating the upstream approach walls.

08 Jan 2021

Canadian Coast Guard Begins Icebreaking on the Great Lakes

The CCGS Samuel Risley performs icebreaking duties on the St. Marys River, Ontario in March 2020. (Photo: Canadian Coast Guard)

The Canadian Coast Guard’s annual icebreaking season on the Great Lakes, which provides assistance to the shipping industry, is underway. Working in partnership with U.S. Coast Guard District 9, the Canadian Coast Guard has two icebreakers assigned to the Great Lakes for the entire winter season: CCGS Griffon and CCGS Samuel Risley. These vessels are supported as required by additional Coast Guard vessels during the spring icebreaking season.Although the St. Lawrence Seaway, Welland Canal and Sault Ste.

24 Sep 2020

Phase Two Contract Awarded for New Soo Lock Project

Trade West Construction continues the deepening of the Upstream Channel for the New Lock at the Soo in Sault Ste. Marie, Michigan. Deepening is the first phase of the new lock project and will be completed in the fall 2021. (Photo: Michelle Briggs)

The second phase construction contract for the New Lock at the Soo has been awarded to Kokosing Alberici LLC of Westerville, Ohio, U.S. Army Corps of Engineers officials announced Thursday.The much-anticipated mega-project will require three phases of construction. Kokosing Alberici's $111 million contract to complete the second phase will stabilize the existing approach walls, allowing modern vessels to tie up and wait their turn to pass through the new lock. Construction will…

10 Sep 2020

Sensor Systems Improve Marine Navigation Near US Naval Bases

A Coast Guard ATON (Aids to Navigation) buoy in Kings Bay, Ga., that will house one of the new PORTS current meters. (Photo: NOAA)

Maritime navigational safety near two U.S. Navy installations in Kings Bay, Ga., and Portsmouth, N.H. has been improved thanks to new Physical Oceanographic Real-Time Systems, also known as PORTS, installed by NOAA and the U.S. Navy. They are the first new PORTS in two years, and the 34th and 35th in the nationwide network.The system near Naval Submarine Base Kings Bay, the East Coast home to America’s Ohio-class submarines, is an integrated series of sensors which will provide critical real-time information on oceanographic and meteorological conditions.

15 Jun 2020

Great Lakes Shipping Companies Navigate Market Challenges Ahead

American Steamship Company’s M/V American Courage upbound on the Cuyahoga River in Cleveland, Ohio with a load of taconite from the iron ranges on Lake Superior for ArcelorMittal Cleveland, one of the most productive integrated steel mills in the world. (Photo Credit: Thomas Rayburn)

For U.S.-flag shipping on the Great Lakes, 2019 was a good year. Total cargos were 90 million net tons, up 7.5% over 2018 and 4.6% over the five-year average. 49.7 million net tons of iron ore were shipped, up 8.5% over 2018 and 11.7% over the five year. Limestone was up 9.7% over 2018 and 10.2% over the five-year average. In 2010 and 2011, coal and limestone were each about 20 million net tons. Since then, coal has shown a steady decline as coal-fired power generating plants…

10 Jun 2020

Barge Grounds in St. Marys River

(Photo: USCG Sector Sault Ste Marie)

A salvage plan is being developed to refloat a barge that went aground in the lower St. Marys River, near Sweets Point, Mich.At 12:30 a.m. Wednesday, the U.S. Coast Guard Sector Sault Sainte Marie Command Center received notification that the 302-foot barge PML2501 towed by the 132-foot towing vessel Anglian Lady grounded in the lower St. Marys River. Both assets are Canadian and had been en route from Sault Sainte Marie, Ont. to Burns Harbor, Ind. at the time of the incident.

12 Dec 2019

Icebreaking Kicks Off on the Great Lakes

File photo: The US Coast Guard Cutter Katmai Bay, a 140-foot ice-breaking tug, escorts a motor vessel  through Lake Michigan near Lansing Shoal, in 2014. The cutter was operating as part of Operation Taconite, which is the icebreaking operation for the northern Great Lakes. (U.S. Coast Guard photo by Daniel R. Michelson)

It's that time of year.The US Coast Guard announced it has commenced icebreaking operations in response to expanded ice growth in the commercial ports of western Lake Superior.Operation Taconite, launched by Coast Guard Sector Sault Sainte Marie on Wednesday, is one of two icebreaking operations that support the Great Lakes. It encompasses Lake Superior, St. Marys River, Straits of Mackinac, Georgian Bay, Green Bay, northern Lake Huron, and Lake Michigan.The authority for Coast Guard domestic icebreaking was created in 1936, by Executive Order 7521 signed by President Franklin D.

07 Jan 2019

Coast Guard Begins Ice Breaking Ops in the Western Great Lakes

File Image: USCG Credit

U.S. Coast Guard Sector Sault Sainte Marie commenced Operation Taconite, the Coast Guard’s largest domestic icebreaking operation, Monday, in response to expanded ice growth in the commercial ports of Western Lake Superior and the St. Marys River.Operation Taconite encompasses Lake Superior, St. Marys River, Straits of Mackinac, Georgian Bay, Green Bay, northern Lake Huron, and Lake Michigan. Ice breaking operations are based on the following order of priorities: search and rescue…

12 Apr 2018

Season’s First Saltie Heads for Duluth-Superior

The first ‘saltie’ of the 2018 commercial navigation season is on its way to the Port of Duluth-Superior. The 656-foot bulk carrier Federal Weser is scheduled to pass beneath Duluth’s Aerial Lift Bridge by 10 p.m. tonight and is expected to start loading Monday morning at the CHS terminal on the Superior side of the harbor. If all goes according to plan, the ship should depart late Tuesday or Wednesday with 21,400 metric tons of durum wheat bound for Algeria. The Federal Weser, part of the Fednav fleet, last visited the Twin Ports in 2015. This year, the Marshall-Islands-flagged bulker stopped on its way to Duluth-Superior to deliver a load of steel in Sault Ste. Marie, Ontario. The vessel has 22 crew members on board and is under the command of Captain Umesh C. Sharma.

19 Dec 2016

Ice breaking Begins in Great Lakes

The Coast Guard Cutter Alder approaches the Portage Lake Lift Bridge in Houghton, Mich., Dec. 16, 2016. The Alder and other Great Lakes Coast Guard cutters commenced Operation Taconite, the Coast Guard’s largest domestic ice-breaking operation, encompassing Lake Superior, the St. Mary’s River, the Straits of Mackinac and Lake Michigan, Dec. 19, 2016. (U.S. Coast Guard photo)

U.S. Coast Guard Sector Sault Sainte Marie commenced Operation Taconite Monday in response to developing ice conditions in the commercial ports of western Lake Superior and the St Marys River. Operation Taconite is the Coast Guard’s largest domestic ice-breaking operation, encompassing Lake Superior, the St. Mary’s River, the Straits of Mackinac and Lake Michigan. As a result of the operation, certain waterways may close after due consideration is given to the protection of the marine environment…

24 Mar 2016

US, Canadian Coast Guards Leaders Discuss Partnership

Julie Gascon, Assistant Commissioner of the Canadian Coast Guard’s Central and Arctic Region and Rear Adm. June Ryan, the commander of the USCG 9th District met with their employees aboard Coast Guard ships and a CCG helicopter in Sault Ste. Marie Ontario and Sault Ste. Marie Michigan March 21 2016. (Photo credit: USCG)

Rear Adm. June E. Ryan, commander of the U.S. Coast Guard Ninth District, was welcomed aboard the Canadian Coast Guard Ship Samuel Risley by Assistant Commissioner Julie Gascon and Captain Signe Gotfredsen of the Canadian Coast Guard, Central and Arctic Region Monday. After a relatively mild winter on the Great Lakes escorting ships through ice and preventing ice jams, the Samuel Risley was upbound through the Soo Locks and the St. Marys River to Lake Superior for further icebreaking at the Port of Thunder Bay and buoy-tending duties.

10 Aug 2017

Merchant Vessel Aground in Saint Marys River

A 629-foot U.S. cargo ship ran aground on the north side of Sugar Island in the St. Marys River, Wednesday at 11:40 p.m. The merchant vessel Calumet departed ESSAR Steel in Sault Ste. Marie, Ontario and was transiting downbound in the St. Marys River to its next port of call in Brevort, Michigan, when it ran aground. The U.S. Coast Guard is on scene and no injuries have been reported. The vessel is currently aground and stable. There are currently no signs of pollution. The St. Marys River is closed to commercial vessels from the Soo Locks to 6 Mile Point. The vessel’s company, Grand River Navigation Inc., is taking precautionary measures to help ensure the safety of the environment and developing a salvage plan. The cause of the grounding is under investigation. Source: U.S.

14 Aug 2017

Cargo Ship Runs Aground in Saint Marys River

The 629-foot cargo vessel Calumet sits hard aground in the St. Mary's River southeast of Sault Ste. Marie, Michigan, while a Coast Guard response boat - medium encircles the vessel, August 10, 2017. The vessel was heading to its next port of call in Brevort, Michigan when it ran aground. (US Coast Guard photo)

The St. Marys River is closed to commercial vessels from the Soo Locks to 6 Mile Point, after a 629-foot U.S. cargo ship ran aground on the north side of Sugar Island, Wednesday, at about 11:40 p.m. The merchant vessel, Calumet, departed Essar Steel in Sault Ste. Marie, Ont. and was transiting downbound on the St. Marys River to its next port of call in Brevort, Mich., when it ran aground. The vessel was not carrying any cargo. There was no pollution, and no injuries have been reported. The U.S. Coast Guard is monitoring the vessel, and the U.S.

15 Dec 2017

USCG Begins Icebreaking in the Western Great Lakes

The Coast Guard Cutter Mackinaw, a 240-foot heavy icebreaker, breaks ice near Marine City, Mich., along the St. Clair River, Jan. 28, 2015. (U.S. Coast Guard photo by Daniel R. Michelson)

U.S. Coast Guard Sector Sault Sainte Marie has commenced icebreaking Operation Taconite in response to expanded ice growth in the commercial ports of western Lake Superior and the lower St. Marys River. Before ice impedes commercial navigation, icebreakers were assigned to each region. U.S. Coast Guard Cutter Alder was assigned to manage the ice breaking needs of western Lake Superior, specifically the twin ports of Duluth, Minn., and Superior, Wisc., as well as the Port of Thunder Bay, Ont. U.S. Coast Guard Cutter Biscayne Bay was assigned to the St. Marys River.