Marine Link
Tuesday, April 23, 2024
SUBSCRIBE

Mike Donlon News

15 Nov 2013

Great Lakes Shipyard Commissions New Cutting Machine

Photo: Great Lakes Shipyard

Great Lakes Shipyard announced the installation of a new state-of-the-art plasma cutting machine, the Plate Pro Extreme 3100. The addition of this cutting table expands the range of services available to its customers and improves the efficiency of Great Lakes Shipyard operations, while also enhancing the quality and precision of the work being produced. Bringing this capability in-house allows the Shipyard to make more of its own parts without relying on outside vendors or subcontractors.

05 Nov 2013

Miller Ferry Up for Routine Maintenance at Great Lakes Shipyard

M/V South Bass (Photo: Great Lakes Shipyard)

Miller Boat Line’s ferry, M/V South Bass, is receiving its routine five-year drydocking and USCG inspection at Great Lakes Shipyard. The vessel was hauled out using the Marine Travelift, and the work on the vessel will be completed in two to three weeks. This marks the first time Great Lakes Shipyard has performed work on the M/V South Bass. Since 2010, repairs have been performed on all of the other ferries in the Miller Boat Line fleet, including routine five-year drydockings…

27 Nov 2012

Goodtime III at Great Lakes Shipyard

Goodtime III

Cleveland’s Goodtime III arrived at Great Lakes Shipyard earlier this month to undergo drydocking and repair work. The vessel received its five-year year US Coast Guard hull and machinery inspection and had its hull repainted. Great Lakes Shipyard has performed work on the previous Cleveland-based excursion boats, Goodtime and Goodtime II. This is the first repair contract that Great Lakes Shipyard has had for Goodtime III. Goodtime III, a family owned and operated business since 1958…

24 Sep 2012

Training the Next Generation at Great Lakes Towing

The Great Lakes Towing Company and Great Lakes Shipyard have entered into another year as a partner in St. Martin de Porres High School’s Corporate Work Study Program. Four students, one from each grade level, work one day a week in various departments at the Company headquarters to help fund about 50% of the cost of their education. The relationship between the school and the Company is aimed at assisting the young men and women develop habits that give them an introduction to the marine industry and enable them to be successful in college, careers, and life. St. Martin de Porres, a Cleveland-based Cristo Rey Network school, aims to “to transform urban Cleveland one student at a time” by offering college preparatory education to students of modest economic means.

21 Sep 2012

GLS Completes USCG Repairs

Great Lakes Shipyard Performs Emergency Repairs on USCG Aids to Navigation Barge. United States Coast Guard Cutter MOBILE BAY of Sturgeon Bay, Wisconsin departed Great Lakes Shipyard, Cleveland, Ohio after completion of drydocking and repairs to the bow thruster on it 120-foot Aids to Navigation Barge. The barge was hauled out on Monday, September 17th using the Shipyard’s 770-ton Marine Travelift. The shipyard immediately removed the bow thruster and disassembled it in the shop for repairs.

20 Sep 2012

Bow Thruster Repaired Fast by Great Lakes Shipyard

'Mobile Bay': Photo credit Great Lakes Shipyard

Great Lakes Shipyard, Cleveland, Ohio, performs emergency repairs on USCG Aids to Navigation barge. United States Coast Guard Cutter Mobile Bay of Sturgeon Bay, Wisconsin departs Great Lakes Shipyard, Cleveland, Ohio after completion of drydocking and repairs to the bow thruster on it 120-foot Aids to Navigation Barge. The barge was hauled out on Monday, September 17th using the Shipyard’s 770-ton Marine Travelift. The shipyard immediately removed the bow thruster and disassembled it in the shop for repairs.