Marine Link
Friday, April 19, 2024
SUBSCRIBE

Pierre Marie Valentin News

18 Oct 2001

Coflexip Stena Offshore Modifies Its Management Structure

upon his suggestion, Daniel Valot, Chairman of the Board of Technip-Coflexip, was appointed, effective October 17,, Vice Chairman and Chief Executive Officer of Coflexip, providing him with the same powers as Pierre Marie Valentin. of Technip-Coflexip bylaws, which should occur early December 2001. effective best in class services and products for the development of offshore hydrocarbon fields worldwide. abandonment, the Group solutions in engineering, fabrication and installation are proposed on either an integrated or a segmented basis. expertise in moorings, pipeline-riser-umbilical systems and robotics. of subsea construction and installation vessels.

17 Dec 2001

Technip-Coflexip Announces New Management Structure

and a supervisory board. With Daniel Valot as Chairman, the management board consists of Thomas Ehret, Daniel Burling, Jean Deseillingny and Claire Giraut. Pierre Marie Valentin will serve as chairman and Michel Leveque will serve as vice chairman of the supervisory board. Roger Cairns, Miguel Caparros, Jean-Pierre capron, Jacques deyirmendjian, Jean-Pierre Lamoure, Claude Mandil, Roger Milgrim, Rolf-Erik Rolfsen, Pierre Vaillaud and Bruno Weymuller will serve as members of the supervisory board. Shareholders also authorized the Management Board of Technip-Coflexip to buy and sell up to 10 percent of its share capital (2,665,962 shares) at a maximum of $136 per share and a minimum price of $82 per share.

06 Dec 2000

GLM's Industry SCORE Continues to Improve

Global Marine’s worldwide SCORE, or Summary of Current Offshore Rig Economics, for September 2000 increased 1.8 percent over the previous month. Global Marine Chairman, President and CEO Bob Rose said, “September marks the 13th consecutive month of improvement in the worldwide SCORE and the 15th consecutive month of improvement in the Gulf of Mexico SCORE. Global Marine’s SCORE compares the profitability of current mobile offshore drilling rig rates to the profitability of rates at the 1980-81 peak of the offshore drilling cycle, when speculative new rig construction was common. In the 1980-81 period, when Global Marine’s SCORE averaged 100 percent, new-contract dayrates equaled the sum of daily cash operating costs plus approximately $700 per day per million dollars invested.

27 Jun 2001

Coflexip Stena Offshore Makes Management Changes

Pierre Marie Valentin, Chairman and Chief Executive Officer of Coflexip announced that the management structure of the CSO Group has been changed to reinforce its position as a worldwide leader in providing offshore solutions in deepwater. On this occasion, a new Executive Committee has been nominated. The new CSO Group management structure was implemented as of June 26, 2001 incorporates the know-how of the Group's various parts including those recently acquired in the CSO Aker Maritime Division. The Group's structure is now organized around two main areas of responsibility: "Operations" consisting of operational divisions, reporting to the Chief Operating Officer…