Marine Link
Thursday, April 18, 2024
SUBSCRIBE

Sps Overlay Technology News

07 Oct 2003

Repair Technology: SPS Overlay: Fix Steel Decks Faster

Despite the quality of protection and commitment to maintenance, a certainty in the marine business is that metal structures eventually corrode and wear. Whether it is 25 months or 25 years, most all marine structures will enter a shipyard for some quantity of steel renewal throughout its life. While the process of removing and replacing steel, particularly decks, is at best a manual and laborious process, Intelligent Engineering (IE) is touting its innovative SPS Overlay structural re-instatement process as a means to help shipowners and ship repairers to save valuable time and money. What is SPS? SPS, invented by IE in association with BASF, is a patented system whereby two metal plates are bonded to a solid elastomer core.

26 Jun 2006

IE Profits from Offshore Focus

As Intelligent Engineering (IE) prepares to carry out another drilling rig repair using its SPS Overlay technology in the reinstatement of the pipe-rack deck on board the Pride South Atlantic, a semi-submersible unit belonging to Pride International, the company's recent focus on the offshore sector is clearly paying dividends. Work on board the Pride South Atlantic, commencing in early July, is the latest in a series of new offshore contracts and will involve the reinstatement of a 490 sq. m. deck area to be carried out at the Maua Jurong facility in Niteroi, close to Rio de Janeiro in Brazil. Denis Welch. "One, a significant percentage of the world's mobile offshore drilling units (MODUs) are 20 years old or more and require steel upgrades and reinstatements.

07 Jul 2003

P&O Euro Ferries Puts 3 Ships With A&P

A&P Birkenhead has won a three-ship contract from P&O European Ferries for passenger/car ferries operating across the Irish Sea. The ships involved are the 14,426 grt European Pioneer, the 18,653 grt European Envoy, and the 12,879 grt European Leader. All three ferries will be drydocked over the coming weeks, the first due to arrive in Birkenhead on July 21. The principle work on all three is deck renewals using the "Sandwich Plate System", patented by UK's Intelligent Engineering. Other scheduled repair work will also be carried out, with the yard remaining very flexible over the requirements of P&O. Intelligent Engineering (IE) has designed and patented the revolutionary technology called Sandwich Plate System (SPS).