NUTEP, a container terminal operator in the Black Sea port of Novorossiysk, completed the latest phase of its ambitious port development program with the upgrade of its railway facilities there. The company has removed the original rail lines, constructed a new yard at the rear of the terminal and increased overall block-train capacity at the terminal to 30 trains – about 112 TEU each – a month. The total length of the railway lines is now more than 4km and, at 425m each, the two new loading sidings allow NUTEP to handle two block-trains a day.