The contract is for the engineering, procurement, construction & installation (EPCI) of a complete pile upend, plus a lifting tool for the wind farm installation project. ArGe Baltic 2 foundations, a joint venture between Hochtief and GeoSea, has awarded Dutch Ulstein subsidiary, Ulstein Idea Equipment Solutions BV, the contract for work on the Baltic 2 wind farm installation project. The upend frame provides increased safety during pile upending operations by ensuring a balanced support and full control of the pile throughout the entire upending cycle.