MetalCraft Marine Delivers FireStorm70

Wednesday, September 29, 2010
Photo courtesy MetalCraft Marine Inc.

MetalCraft Marine of Kingston, Ontario & Clayton, New York recently delivered a new CBRNE FireStorm 70 to Jacksonville Fire/Rescue, Fla. The $4.7m dollar vessel was purchased with a 2008 Port Security Grant.

Speed    41 knots fully loaded
Length, o.a.    70-ft, flush deck
Beam, o.a    22.8 ft
Draft    42 inces
Pumps    4x Hale 8 FKF pumps producing over 14,000 GPM @150 psi.
Monitors    1x Remote Stang, 2 x remote Elkhart and 2 x manual Elkhart’s
Engine    Quad Caterpillar C18 @ 1015 HP
Jets    Quad Hamilton HJ403

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

COSCO Delivers Bulker

The Board of Directors of COSCO Corporation (Singapore) Limited announced that COSCO (Dalian) Shipyard Co., Ltd a subsidiary of the Company's 51% owned COSCO Shipyard Group Co.

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

WFW Advises ING Bank on $340m Loan Facility for Euronav

Watson, Farley & Williams (WFW) has advised ING Bank N.V. (ING) as sole bookrunner and facility agent for a syndicate of banks on a $340 million loan facility made available to Euronav NV.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1616 sec (6 req/sec)