'Missing Link' LNG Bunker Barge Concept

Press Release
Monday, June 10, 2013
LNG Bunker Barge Concept: Image credit NLI

NLI Solutions (NLI) has developed a concept for a LNG Bunker Barge (often described as the 'missing link' in prospective LNG bunkering plans) based on the NLI LNG tank design.

The concept has been further developed in a design study together with the Marine division of Rolls-Royce and Wilhelmsen Technical Solutions (WTS).

LNG is among the cleanest and most cost efficient options for low emission shipping. Interest in LNG as a marine fuel is rapidly increasing, but one limiting factor is practical availability of LNG bunker facilities.Today, only one example exists, capable of carrying 187 m3 of LNG, even though ocean-going ships need to bunker several thousand cbm, and the HighTechBarge is designed to answer multiple demands for a cost-effective, high-tech high-volume barge.

For safe operations and increased manoeuvrability, the HTB will be equipped with podded propulsion similar to those used in offshore support vessels as well as state-of-the-art electronics for early threat detection.

The NLI LNG tank is an atmospheric, prismatic steel tank, type ’B‘, with a capacity of 4000 m3 of LNG. It will be fitted with a new insulation system with very low levels of boil off gas.
Onboard power and propulsion are fed by an environmentally-friendly gas engine. The HTB has a large pressure tank on the aft deck for boil off gas handling and gas delivery to engine.

Since re-condensation equipment is very expensive, takes a lot of space, and has very low efficiency for small installations like this, excess boil of gas can be delivered to a shoreside gas grid when the barge is not on bunkering operations. The barge can also deliver electric power to a shoreside electric grid.

Main particulars according to NLI
LOA 63m, BMAX 20m, DEADWEIGHT abt. 2000 T, Service speed  8 knots, LNG tank capacity 4000m3, CNG tank for compressed boil off gas 270 m3, aft deck contains compressors, vaporizers etc. Bunkering operations from tank top. Main engine and gen-set, size pending operation: Bergen C26:33 gas engine; Bergen C gas engines are available with powers from 1440 to 2,430kW.

Planning for the study has involved:
·         NVC – responsible for design, Bergen gas engine, pod drives and bridge systems;
·         TI Marine Contracting (part of WTS) – responsible for insulation systems;
·         NLI – responsible for tank, LNG/gas systems, bunkering systems;
·         DNV – evaluation of the barge concept with respect to limitations and possibilities within the existing codes and regulations.


 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Added Value Innovation Drives Control of BWTS

Specifying for ballast water treatment systems can be a difficult process. Ian Hamilton, sales manager for marine electrical wiring control and instrumentation specialists CMR Group, offers guidance.

New Research Group to Spur Maritime Transport

A new research initiative, entitled Vessels for the Future, was launched with the aim of improve shipping’s safety record, sustainability and global competitiveness.

“Bright Ideas” program - Ash Center - Harvard University

The Ash Center for Democratic Governance and Innovation at the John F. Kennedy School of Government, Harvard University, recognized the Port of Houston Partners

Workboats

Mariner Medevaced in Alaska

An ailing mariner was medevaced from a fishing vessel in Beaver Inlet, approximately 13 miles southeast of Dutch Harbor, Sunday, the U.S. Coast Guard reported.   The

Editorial: Gettin’ Crabby with Deadliest Catch

As February is our traditional cruise shipping edition, naturally we’ve selected a fishing boat and two crabs for the cover. But as many of you may already know,

Haven Marine Bags Back To Back Dockings

Despite a slow start to the year, Haven Marine Services reports it is now seeing a change in fortunes with two dockings for Svitzer in quick succession, with one

Fuels & Lubes

Interview: Nakilat's Samir Bailouni

SGMF Membership - Uncovered: An interview with Samir Bailouni, Nakilat The Society for Gas and Marine Fuel (SGMF) recently interviewed one of its members, Samir

ADB Okays $30mln for Pak LNG Terminal

The Asian Development Bank (ADB) has approved a $30 million project loan to Engro Elengy Terminal Private Limited, a special purpose company which will build Pakistan’s

Brightoil Reports Steady Growth in Interim Results

Brightoil Petroleum (Holdings) Limited announced its interim results for the six months ended December 31, 2014, reporting steady growth over the period.   During the period,

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2015 sec (5 req/sec)