'Missing Link' LNG Bunker Barge Concept

Press Release
Monday, June 10, 2013
LNG Bunker Barge Concept: Image credit NLI

NLI Solutions (NLI) has developed a concept for a LNG Bunker Barge (often described as the 'missing link' in prospective LNG bunkering plans) based on the NLI LNG tank design.

The concept has been further developed in a design study together with the Marine division of Rolls-Royce and Wilhelmsen Technical Solutions (WTS).

LNG is among the cleanest and most cost efficient options for low emission shipping. Interest in LNG as a marine fuel is rapidly increasing, but one limiting factor is practical availability of LNG bunker facilities.Today, only one example exists, capable of carrying 187 m3 of LNG, even though ocean-going ships need to bunker several thousand cbm, and the HighTechBarge is designed to answer multiple demands for a cost-effective, high-tech high-volume barge.

For safe operations and increased manoeuvrability, the HTB will be equipped with podded propulsion similar to those used in offshore support vessels as well as state-of-the-art electronics for early threat detection.

The NLI LNG tank is an atmospheric, prismatic steel tank, type ’B‘, with a capacity of 4000 m3 of LNG. It will be fitted with a new insulation system with very low levels of boil off gas.
Onboard power and propulsion are fed by an environmentally-friendly gas engine. The HTB has a large pressure tank on the aft deck for boil off gas handling and gas delivery to engine.

Since re-condensation equipment is very expensive, takes a lot of space, and has very low efficiency for small installations like this, excess boil of gas can be delivered to a shoreside gas grid when the barge is not on bunkering operations. The barge can also deliver electric power to a shoreside electric grid.

Main particulars according to NLI
LOA 63m, BMAX 20m, DEADWEIGHT abt. 2000 T, Service speed  8 knots, LNG tank capacity 4000m3, CNG tank for compressed boil off gas 270 m3, aft deck contains compressors, vaporizers etc. Bunkering operations from tank top. Main engine and gen-set, size pending operation: Bergen C26:33 gas engine; Bergen C gas engines are available with powers from 1440 to 2,430kW.

Planning for the study has involved:
·         NVC – responsible for design, Bergen gas engine, pod drives and bridge systems;
·         TI Marine Contracting (part of WTS) – responsible for insulation systems;
·         NLI – responsible for tank, LNG/gas systems, bunkering systems;
·         DNV – evaluation of the barge concept with respect to limitations and possibilities within the existing codes and regulations.


 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

MNZ & AMSA Award McMurdo COSPAS-SARSAT Contract

McMurdo Group’s Techno-Sciences Inc. says it has been chosen by the Australia Maritime Safety Authority (AMSA) and Maritime New Zealand (MNZ) to deploy their next-generation

BW Offshore Awards SatCom Contract to Orange

Provider of floating production services to the oil and gas industry, BW Offshore, says it has signed a 5-year, $12 million contract with Orange Business Services

Raytheon Anschütz Enhance Bridge INS

German navigation system manufacturer Raytheon Anschütz says it has launched a new Synapsis software release and hardware infrastructure, which will further enhance

Workboats

MN 100: Eastern Shipbuilding Group, Inc.

13300 Allanton Road Panama City, FL 32404 Tel: (850) 522-7400  Email: info@easternshipbuilding.com Website: www.easternshipbuilding.com President: Brian

MN 100: Horizon Shipbuilding, Inc.

13980 Shell Belt Road Bayou La Batre, AL 36509 E-mail: trshort@horizonshipbuilding.com Website: www.horizonshipbuilding.com President and General Manager: Travis R.

MN 100: Kvichak Marine Industries, Inc.

469 NW Bowdoin Place Seattle, WA 98107 Telephone: 206 545 8485 E-mail: sales@kvichak.com Website: www.kvichak.com CEO/President: Keith Whittemore Number of

Fuels & Lubes

MN 100: FloScan Instrument Co., Inc.

3016 NE Blakeley Street Seattle, WA 98105 Telephone: 206 524 6625 / 316 E-mail: joe.dydasco@floscan.com Website: www.floscan.com CEO/President: Chuck Wurster Number

MN 100: Kluber Lubrication North America L.P.

32 Industrial Drive Londonderry, NH 03053 Telephone: 508 404 4807 E-mail: ben.bryant@us.kluber.com Website: www.klubersolutions.com CEO/President: Ralf Kraemer Number

BSEE Conducts Oil Spill Response Equipment Review

Earlier this week, BSEE's Oil Spill Response Division (OSRD) conducted an onsite review of oil spill response equipment listed in DCOR, LLC's Oil Spill Response Plan for platforms offshore Long Beach,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1270 sec (8 req/sec)