Marine Link
Friday, October 28, 2016

MNZ Provides Update on Listing Bulker

June 28, 2007

Maritime New Zealand (MNZ) was advised that the operation to right the listing bulk iron sand carrier Taharoa Express, could take longer than originally estimated. Estimates provided to MNZ from on board the vessel indicated that it could potentially take up to 10 days for the slow, careful process of pumping of excess water from its cargo holds to be completed.

This is due to the vessel’s size and the amount of water contained on board, as well as the capacity of the pumps currently available. The water is used to help pump in the iron sand and is a normal part of loading operations. The carrier has been anchored in Tasman Bay, near Nelson, since last Friday evening. The crew have been working since then to right the vessel, after its load shifted in heavy seas near Cape Egmont.

The pumping operation has so far resulted in the vessel’s list being reduced to about 11 degrees. There are no concerns for the safety of the 25 crew or the vessel.

Maritime Reporter Magazine Cover Oct 2016 - Marine Design Annual

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News