FPSO OSX-1 Mooring System Enroute to Brazil

Thursday, September 15, 2011

The disconnectable buoy that comprises the mooring system of the FPSO OSX-1 (floating production, storage and offloading unit for oil and gas) belonging to OSX, an EBX Group company, has already departed Batam in Indonesia and will arrive in Rio de Janeiro in September. It will be used for producing the first oil by OGX at Waimea in the Campos Basin. This is a large scale piece of equipment, with a height of approximately 17m, a diameter of 14m and weighing over 700 tons. The buoy will be responsible for interconnecting the OSX-1 to well OGX-26 via flexible piping and umbilicals. Production estimates for this well is for up to 20,000 barrels of oil per day already in 2011. The mooring chain, piles and steel wire rope of the FPSO OSX-1 are already in Brazil.The prior installation of this mooring system in Rio de Janeiro will allow for quick connection of the unit, reducing the time required between the arrival of the OSX-1 and the start of its operation.
www.osx.com.br

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Huisman Cranes for New Maersk Subsea Support Vessels

In December 2014, Huisman secured a contract from COSCO (Dalian) Shipyard for the delivery of four customized 400mt Rope Luffing Knuckle Boom Cranes and two 100mt

Coast Guard Cutter William Trump Commissioned

The Coast Guard Cutter William Trump was commissioned during a ceremony at Coast Guard Sector Key West Saturday Jan. 24, 2015. The Trump is the 11th fast response cutter in the Coast Guard fleet.

World's Largest Ship Sparks Outrage

Jewish groups in the Netherlands and Britain have reacted with rage and despair at the arrival in Rotterdam of the world's biggest ship, the Pieter Schelte, named

Offshore

New Chemical Handling Service from Ferguson Group

Tank, Fluid Solutions and Bunded Storage for Dangerous Goods and Chemicals Introduced at Gap Ridge, Karratha.    Ferguson Group Australia, global specialist in offshore DNV 2.

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1394 sec (7 req/sec)