FPSO OSX-1 Mooring System Enroute to Brazil

Thursday, September 15, 2011

The disconnectable buoy that comprises the mooring system of the FPSO OSX-1 (floating production, storage and offloading unit for oil and gas) belonging to OSX, an EBX Group company, has already departed Batam in Indonesia and will arrive in Rio de Janeiro in September. It will be used for producing the first oil by OGX at Waimea in the Campos Basin. This is a large scale piece of equipment, with a height of approximately 17m, a diameter of 14m and weighing over 700 tons. The buoy will be responsible for interconnecting the OSX-1 to well OGX-26 via flexible piping and umbilicals. Production estimates for this well is for up to 20,000 barrels of oil per day already in 2011. The mooring chain, piles and steel wire rope of the FPSO OSX-1 are already in Brazil.The prior installation of this mooring system in Rio de Janeiro will allow for quick connection of the unit, reducing the time required between the arrival of the OSX-1 and the start of its operation.
www.osx.com.br

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Young Brothers Orders Four New Tugs from Conrad

Young Brothers, Limited, Hawai‘i’s largest inter-island cargo service provider, and Conrad Shipyard, signed a contract to build four new tugs, a nearly $80 million

Fundraiser Held for USS Gerald R. Ford Crew

Blackmer, a company in positive displacement and centrifugal pump and reciprocating compressor technologies, has a relationship with the U.S. Military that dates

Meercat Workboats Scores a Hat-trick

The U.K.’s Meercat Workboats says it scored a hat-trick; the Hampshire-based boat builder announced it is moving premises, that Seawork was a huge success and that

Offshore

Another Fugro Vessels Joins Largest SEEP-Hunting Survey

Fugro has deployed multi-purpose offshore survey vessel Fugro Gauss to join the Fugro Brasilis offshore Mexico, to help complete the world’s largest seep-hunting

JIP Validates DNV GL's Helica Software

A joint industry project run by DNV GL has replicated stresses measured in an umbilical subjected to tension and bending in full-scale tests, further validating

Gas Plant Fire Halts US Gulf Coast Platforms

At least two offshore oil platforms halted operations on Tuesday in the U.S. Gulf of Mexico after a fire at a natural gas processing plant in Mississippi shut a

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0722 sec (14 req/sec)