FPSO OSX-1 Mooring System Enroute to Brazil

Thursday, September 15, 2011

The disconnectable buoy that comprises the mooring system of the FPSO OSX-1 (floating production, storage and offloading unit for oil and gas) belonging to OSX, an EBX Group company, has already departed Batam in Indonesia and will arrive in Rio de Janeiro in September. It will be used for producing the first oil by OGX at Waimea in the Campos Basin. This is a large scale piece of equipment, with a height of approximately 17m, a diameter of 14m and weighing over 700 tons. The buoy will be responsible for interconnecting the OSX-1 to well OGX-26 via flexible piping and umbilicals. Production estimates for this well is for up to 20,000 barrels of oil per day already in 2011. The mooring chain, piles and steel wire rope of the FPSO OSX-1 are already in Brazil.The prior installation of this mooring system in Rio de Janeiro will allow for quick connection of the unit, reducing the time required between the arrival of the OSX-1 and the start of its operation.
www.osx.com.br

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

MHI Receives "Best IR Award"

Mitsubishi Heavy Industries, Ltd. (MHI) has received one of this year's "Best IR Awards" presented annually by the Japan Investor Relations Association (JIRA).

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Everett College to Launch New Research Boat

Everett Community College’s Ocean Research College Academy (ORCA) will launch its new research vesel on November 22 with a celebration at 11 a.m. at the Port of Everett.

Offshore

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Security Naval Architecture Navigation Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1199 sec (8 req/sec)