Marine Link
Tuesday, September 27, 2016

FPSO OSX-1 Mooring System Enroute to Brazil

September 15, 2011

The disconnectable buoy that comprises the mooring system of the FPSO OSX-1 (floating production, storage and offloading unit for oil and gas) belonging to OSX, an EBX Group company, has already departed Batam in Indonesia and will arrive in Rio de Janeiro in September. It will be used for producing the first oil by OGX at Waimea in the Campos Basin. This is a large scale piece of equipment, with a height of approximately 17m, a diameter of 14m and weighing over 700 tons. The buoy will be responsible for interconnecting the OSX-1 to well OGX-26 via flexible piping and umbilicals. Production estimates for this well is for up to 20,000 barrels of oil per day already in 2011. The mooring chain, piles and steel wire rope of the FPSO OSX-1 are already in Brazil.The prior installation of this mooring system in Rio de Janeiro will allow for quick connection of the unit, reducing the time required between the arrival of the OSX-1 and the start of its operation.
www.osx.com.br



Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News