Northrop Grumman to Build New CG Cutter

Wednesday, December 01, 2010

According to a Nov. 30 report from the Associated Press, the U.S. Coast Guard has awarded a $480m contract to Northrop Grumman for the construction of a fourth National Security Cutter. The ship will be 418 ft long and be built in Pascagoula.

(Source: The Associated Press)
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fundraiser Held for USS Gerald R. Ford Crew

Blackmer, a company in positive displacement and centrifugal pump and reciprocating compressor technologies, has a relationship with the U.S. Military that dates

Meercat Workboats Scores a Hat-trick

The U.K.’s Meercat Workboats says it scored a hat-trick; the Hampshire-based boat builder announced it is moving premises, that Seawork was a huge success and that

First MAN D2676 Workboat Engine Ready for Launch

Last December, MAN Engines introduced its latest generation in-line six-cylinder engines for workboats. Now the first MAN D2676 LE443 engine off the production

 
 
Maritime Security Naval Architecture Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0618 sec (16 req/sec)