Offshore O&G: Cuts, Delays in Norway as Costs Soar

Posted by Greg Trauthwein
Thursday, April 24, 2014
Home: http://www.npd.no/en/Publications/Facts/Facts-2012/Preface1/

More oil and gas projects in Norway could be put on hold because of rising costs, adding to a growing list of developments that have been delayed or called off, Bente Nyland, the head of the Norwegian Petroleum Directorate said on Thursday.

Most vulnerable will be small fields, projects to increase the recovery from producing assets, and new finds further than 40 km from existing infrastructure, Nyland told Reuters.

Oil firms are cutting back on capital spending across the world as years of cost inflation has squeezed margins, cutting back their ability to pay dividends.

Norway, where the per unit cost has increased 10-fold in 10 years has already fallen victim to cuts. Statoil earlier this year sharply reduced its investment budget while Shell this month called off a multi-billion dollar project to increase recovery at its Ormen Lange gas field.

Statoil's $15.5 billion Johan Castberg find in the Arctic, put on hold last year because of high costs, is also hanging in the balance but Nyland said she expected Statoil to eventually go ahead with the development.

"Increased costs will of course reduce the profitability of ongoing projects and might put a project on hold. The value of the future project will also be reduced," Nyland said.

"Costs are high and we know that companies have announced stronger investment discipline."

"We are afraid that this will cut some of the 165 (planned) projects to improve recovery and it might also stop the development of some of the 88 discoveries ... probably some of them will never be realized if this cost growth continues."

Increased oil recovery tends to be a low margin business and relies heavily on drilling new wells, a problem as drilling costs have doubled over the past decade.

With oil prices seen falling over the next two years and drilling costs staying high, spending on getting more out from fields can easily be abandoned, Nyland said.

"When the cost is increasing, you stop two things: exploration and increased oil recovery projects."

Developments in the Barents Sea in Norway's Arctic could also be at risk because they tend to be much further from shore than fields in the North Sea and the area lacks infrastructure.

(By Balazs Koranyi, Editing by David Evans)

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Vestas Profit Beats Forecast

Danish wind turbine maker Vestas Wind Systems posted much higher than expected second-quarter earnings and slightly increased its guidance for the full year, signaling

Maersk Drilling Rig Team Train Local Talent

Maersk Drilling says that its 'Mærsk Deliverer' rig team has initiated seven local acceleration programmes in Angola. The goal is to train and develop local talent

New Offshore Vessel Management Mobile App

Telerik says that its customer Bhagwan Marine, a leader in servicing the oil and gas industry, together with partner, Glenfield Digital Group, has released the

Finance

Vestas Profit Beats Forecast

Danish wind turbine maker Vestas Wind Systems posted much higher than expected second-quarter earnings and slightly increased its guidance for the full year, signaling

HK's COSCO International Reports Strong Profit Growth

For the  six months ended 30th June 2014, shipping services provider COSCO International has announced that its 2014 Interim Results show strong profit growth with Net Profit up 45% YOY.

Asia–U.S. Container Lines to Introduce Freight Increase

The Transpacific Stabilization Agreement (TSA) informs that member container shipping lines are proposing an across-the board general rate increase (GRI) of at

Energy

Russia Conducts High North Geophysical Surveys

For the first time, as part of the Arctic-2014 high-latitude expedition, nuclear icebreakers 'Akademik Fedorov' and 'Yamal' have conducted an entire complex of geophysical research at the North Pole,

Mærsk Putting Valuable Experience to Good Use

The Mærsk Deliverer rig team has initiated seven local acceleration programmes in Angola. The goal is to train and develop local talent to take on increasingly

CIMC Raffles' COSLInnovator is "Rig of the Month"

In July 2014, the CIMC Raffles North Sea semisubmersible drilling rig unit, COSLInnovator, was awarded as "Rig of the Month” again by STATOIL. It is the fifth

Government Update

Russia Conducts High North Geophysical Surveys

For the first time, as part of the Arctic-2014 high-latitude expedition, nuclear icebreakers 'Akademik Fedorov' and 'Yamal' have conducted an entire complex of geophysical research at the North Pole,

BOEM to Open Bids for Gulf of Mexico Lease Sale

The Bureau of Ocean Energy Management (BOEM) Gulf of Mexico Regional Director John Rodi will open the Gulf of Mexico Western Planning Area Lease Sale 238 at 9 a.

Nuship Canberra Embarks on Final Sea Trials

Nuship Canberra, the first of two Landing Helicopter Dock (LHD) ships being built for the Australian Defense Force, has sailed on her final contractor sea trials

Offshore Energy

Maersk Drilling Rig Team Train Local Talent

Maersk Drilling says that its 'Mærsk Deliverer' rig team has initiated seven local acceleration programmes in Angola. The goal is to train and develop local talent

Russia Conducts High North Geophysical Surveys

For the first time, as part of the Arctic-2014 high-latitude expedition, nuclear icebreakers 'Akademik Fedorov' and 'Yamal' have conducted an entire complex of geophysical research at the North Pole,

Mærsk Putting Valuable Experience to Good Use

The Mærsk Deliverer rig team has initiated seven local acceleration programmes in Angola. The goal is to train and develop local talent to take on increasingly

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1349 sec (7 req/sec)