Songa Offshore: Latest Fleet Update

By George Backwell
Friday, September 05, 2014
Offshore Rig: Photo Songa

International midwater drilling contractor, Songa Offshore, operates a fleet of 4 rigs with an additional 4 rigs due to be delivered later this year and in 2015.  August fleet operations were as follows:

  • Songa Delta achieved an operational efficiency of 100% and an earnings efficiency of 100% working for Statoil in Norway.
  • Songa Trym achieved an operational efficiency of 100% and an earnings efficiency of 97% during the month working for Statoil in Norway.
  •  Songa Dee achieved an operational efficiency of 100% and an earnings efficiency of 98% for the operational part of the month. The rig arrived Invergordon in Scotland August 24 for a scheduled SPS (Special Perodic Survey). The rig will continue its contract with Statoil when the SPS is completed.
  • Songa Venus is stacked in Labuan, Malaysia, where it pursues future work.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

BP Freezes Pay in 2015 to Cut Costs

BP is freezing base pay across the group this year, the latest in a series of steps by oil majors to cut costs in response to sinking oil prices.   Over the past year,

Metcalf to Succeed Cox at CSA Helm

Kathy J. Metcalf will assume the role of president and CEO of the Chamber of Shipping of America (CSA), succeeding Joseph J. Cox, who will retire on May 31, 2015,

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Contracts

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Huisman Cranes for New Maersk Subsea Support Vessels

In December 2014, Huisman secured a contract from COSCO (Dalian) Shipyard for the delivery of four customized 400mt Rope Luffing Knuckle Boom Cranes and two 100mt

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

Offshore

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

Maersk Line Gets new AEO number

Maersk Line has been re-certified as an Authorised Economic Operator (AEO) with the AEO-F, the highest achievable accreditation in the European Union programme.

Offshore Energy

World's Largest Ship Sparks Outrage

Jewish groups in the Netherlands and Britain have reacted with rage and despair at the arrival in Rotterdam of the world's biggest ship, the Pieter Schelte, named

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Technip Certified to EDGE Standard

Technip and EDGE Certified Foundation announce today that Technip in Brazil, in France and in Italy, including flexible pipe manufacturing plants in Brazil and France and Group’s headquarters,

Underwater Engineering

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Subsea Crane Takes a Long Journey

Last September the test bed in Rostock was the stage of a single lift of the RL-K 7500 subsea crane. The same crane was then loaded and shipped to the South Korean customer.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Pipelines Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4661 sec (2 req/sec)