Offshore Wind Rules Set New Standard

MarineLink.com
Wednesday, June 12, 2013

Lloyd’s Register releases new Rules, Class Notation and Guidance Notes for ‘Wind Turbine Installation and Maintenance Vessels and Liftboats’ to reflect industry best practice and new novel designs.

The new Rules form part of the wider Mobile Offshore Unit Rule set 2013 launched by Lloyd’s Register in June, and is for vessels engaged in installation and/or maintenance activities relating to offshore wind turbines. It covers a number of unit types as well as liftboats, whose primary function is to provide support services to offshore wind turbine installations or other types of offshore installation.

Vessels which comply with the requirements of the new Rules will be eligible for a new classification notation (MainWIND).

The release of the new Rules and Guidance Notes coincides with reports that operators are suffering from the substantial incremental rise in the cost of constructing offshore wind assets and is casting new light on the value of independent third-party assurance, and how certification authorities are informing asset design and construction.

Rob Whillock, Offshore Renewables Lead Naval Architect at Lloyd’s Register said, “It is critical that throughout the process of independent assurance, there is an eye to the future of the industry as well as current guidelines.”

Offshore wind projects have tended to run late and over-budget, but the industry is forecast to grow at pace. The European Environment Agency’s (EEA) estimates that Europe’s offshore wind potential is able to meet the continent’s energy demand seven times over.

Whillock states that modern certification authorities have to offer technical solutions that recognize industry’s future growth.

“As the industry matures, we will see a greater number of larger turbines being installed in deeper water and further from shore, such as the planned 9GW wind farm at Dogger Bank, which lies some 125km off the east coast of England,” said Whillock. “Such developments will require owners and operators of offshore wind farms to rethink their installation and service vessels entirely. The new Lloyd’s Register Rules highlight the importance of independent technical assessment of structures, systems and capabilities. We are demonstrating to the world that our offshore Rules reflect best practice.”

The intention of the new Lloyd’s Register Rules is to help clients understand the classification process and clearly set out the rules to be applied to various vessels and unit types, from the Lloyd’s Register classed ship to the Mobile Offshore Unit.

To support the development of these new Rules, Lloyd’s Register developed a set of client guidance notes (titled Mobile Offshore Units - Wind Turbine Installation Vessels) which were also approved at the recent Offshore Technical Committee where more than 100 industry stakeholders attended Lloyd’s Register’s Singapore based Group Technology Centre. These guidance notes provide summary information on classification rules and regulations, national administration requirements, documentation required to be submitted, and the Rules requirements for various types of units used in installing and maintaining offshore wind turbines.
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Upcoming Expo 'Offshore Marintec Russia'

ExpoForum Convention and Exhibition Centre in St. Petersburg, October 7-10  will host the International Specialised Offshore Exhibition and Conference 'Offshore

RWE Dea Awarded Two New Concessions in Egypt

In the International Bid Round 2013, RWE Dea has been awarded two new offshore concessions with operatorship by the Egyptian General Petroleum Corporation (EGPC).

TRIYARDS' Liftboat Orderbook Filling up

*This new order brings total liftboat contracts to date to 14, and showcases TRIYARDS’ engineering versatility * Win affirms TRIYARDS' leadership position as

Classification Societies

Woodside Names LR Energy as Global Inspection Provider

Australia’s Woodside has signed on Lloyd’s Register Energy to act as its global inspection provider across a number of assets.Lloyd’s won the contract to provide surveillance inspection,

Prime Minister Solberg Visits DNV GL

Norway’s Prime Minister Erna Solberg visited DNV GL Høvik yesterday, September 16. Group President & CEO Henrik Madsen was host. “The Prime Minister was both

Hans Hansen is DNV GL's Area Manager for Scandinavia

In the power sector DNV GL supports the industry in delivering a secure, sustainable, available and affordable energy supply. In his new role Hans Tormod Hansen

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1618 sec (6 req/sec)