Dredging Operations Prolonged on Delaware River

MarineLink.com
Monday, February 03, 2014

The safety zone around dredging operations in Marcus Hook Range in the Delaware River remains in effect until on or about February 28, 2014.

The Dredge ESSEX has transitioned to the downriver portion of Marcus Hook Range, south of the Sunoco Marcus Hook Refinery, to complete dredging operations. The safety zone includes all waters within a 150 yards radius of the Dredge ESSEX and all related dredging equipment. Vessels requesting to transit Marcus Hook Range shall contact the Dredge ESSEX on VHF channel 13 or 16, 30 minutes prior to arrival. Vessels shall then transit around the dredge project, utilizing the downriver portion of the Marcus Hook Anchorage below Sunoco Marcus Hook Refinery, while operating at the minimum safe speed necessary to maintain steerage and reduce wake.

At this time, the upriver portion of the anchorage is re-opened for anchorage purposes and the downriver portion will be closed with the exception of transiting traffic. Vessels desiring to anchor within the upriver portion of Marcus Hook Anchorage must obtain permission from the Captain of the Port at least 24 hours in advance, at (215) 271-4807. The COTP will permit one vessel at a time in Marcus Hook Anchorage on a "first-come, first-served" basis. Vessels will not be permitted to occupy the anchorage beyond 24 hours. Vessels are encouraged to use Mantua Creek Anchorage (Anchorage #9) and Deepwater Point Anchorage (Anchorage #6) as alternatives.

The operator of any vessel in the safety zone shall proceed as directed by the designated representative of the Captain of the Port and shall contact the Dredge ESSEX on VHF channel 13 or 16, for passing information.

The safety zone will be lifted by an MSIB once dredging operations are concluded.

gac.com

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Odfjell Finalizes LPG/Ethylene Joint Venture Deal

Following Odfjell SE’s May 16, 2014 announcement declaring the signing of a definitive agreement to form a LPG/E shipping joint venture, Odfjell today announced

Marorka Opens Offices in Copenhagen

Marorka announced it is currently expanding following a substantial injection of funds. The expansion plan was approved and Marorka will extend its worldwide network in 2014.

DP World Mulls Senegal Free Zone

DP World  is looking to develop a free zone in Senegal, Chairman Sultan Ahmed bin Sulayem said on Wednesday. Sulayem was speaking at an African investment event in Dubai.

Maritime Safety

MOL Merges Group Companies; Upgrades Bridge Simulator

MOL adds DPS and enhances safe operation by integrating expertise through merger Mitsui O.S.K. Lines, Ltd. (MOL) announced the merger of MOL Marine Consulting, Ltd.

General Dynamics Bags $ 50 mi Submarine Contracts

General Dynamics Advanced Information Systems, a business unit of General Dynamics was awarded two contract modifications totaling $50 million to continue supporting

USCG Cutter Rush Returns

The crew of Coast Guard Cutter Rush returned to its homeport following a successful 72-day deployment in the Central and Western Pacific, Monday. Rush departed

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1625 sec (6 req/sec)