Vessel Ordering Mania – Why?

By Drewry Container Team
Friday, September 13, 2013

The flood of interest in ordering new container vessels is motivated by other factors than supply and demand.


The recent surge in new vessel orders at a time of industry-wide overcapacity suggests that market fundamentals are no longer the main driver. Even when the most recently ordered ships are delivered in 2016, Europe and the U.S. are still likely to be climbing out of recession, which means that capacity in the east-west trades will continue to outstrip demand.

One of the factors behind the surge in orders is plummeting shipyard prices. Smaller carriers now see an opportunity to gain a competitive edge over the big three at last, and have not been slow to take advantage of it. For example, CSCL’s recent order for 5 x 18,400 teu ships, the first of which is due for delivery in 4Q 2014, each cost $136.6 million, approximately 26% less than Maersk’s 20 x 18,000 teu vessels, which were ordered in 2011, with the first being named only two weeks ago.

The comparison is not exact, as there is a difference in design specification. Maersk’s hull is twin screw, whereas CSCL’s has only one propeller, and Maersk’s vessels also have expensive on-deck cell guides to facilitate cargo operations and improve safety.

The big advantage of the 18,000 teu vessels is its fuel consumption. Compared to the 13,000 teu ships, they are claimed to burn around 35% less per container. As fuel accounts for well over half of all voyage costs, it is easy to see why new market entrants can be lured in, including UASC, which is reported to be discussing the price of five of the giants with an Asian shipyard.

UASC has also expressed interest in ordering four 14,000 teu vessels. In this respect OOCL ordered six 13,000 teu vessels in 2011, each costing $136 million, and NOL ordered 10 x 14,000 ships in 2011, costing $154m, including the upgrading of ten 8,400 teu vessels, whereas Seapan’s order for five 14,000 teu vessels in March 2013 are estimated to have cost just $108m each. The price of K Line’s five 14,000 ships, which were fixed shortly afterwards, is not known.
Getting credit for such orders is still not difficult, strangely, despite the ships not always being ordered to meet demand growth. However, the credit is selective for certain companies and ship types. Also, with many ocean carriers being state-supported in some way, banks appear to see their loans as being as good as sovereign debt, so not high risk, even though the current surplus of vessel capacity is already destroying profitability through swinging freight rate decreases.

This means that maintaining the cash flow required to service ship mortgages is increasingly difficult for carriers. Cash-rich non-owner operators, such as Seaspan, Costamare, Technomar, and Capital Ship Management, clearly see this problem worsening, which explains why they have returned to the market in a big way, providing another factor behind the surge (see table).

They have also been using their cash advantage to help owners acquire specialist tonnage, such as the wide-body vessels now favored in South American schedules.So, even where borrowing to fund newbuilds becomes too difficult, carriers will be able to circumvent the problem through leasing or chartering. The container industry, it seems, remains dominated by optimists.

According to Drewry, non-operating owners clearly expect that, as ocean carriers’ cash flow gets tighter, the charter market will increasingly be used for newer fuel-efficient vessels, including the wide-bodied 8,000/9,000 units currently gaining currency in South America. drewry.co.uk
 

(As published in the August 2013 edition of Maritime Reporter & Engineering News - www.marinelink.com)

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Industry Professionals to Speak at ShipConstructor Conference

The speakers representing various companies at next week's SSI Americas ShipConstructor User Conference, October 7-9, 2014 in Mobile, Alabama, demonstrate SSI's

HII Appoints Brenton as Corporate Director

Huntington Ingalls Industries (HII) announced today that Capt. Kevin Brenton (U.S. Navy, Ret.) has joined the company as corporate director of customer affairs for submarine programs.

Cummins Debuts Mobile Tier 4 Generators

Cummins’ certified Tier 4 Final QSB7 and QSL9 engine platforms form the basis for mobile sets that meet EPA regulations U.S. EPA Tier 4 Final certified mobile

Finance

Norvestor to Become PG’s Largest Shareholder

Norvestor VI, L.P., a fund advised by Norvestor Equity AS, announced it has signed an agreement to invest in Ing Per Gjerdrum AS including its subsidiaries PG Hydraulics AS and PG Construction AS.

GasLog Closes First Option Vessels Dropdown

GasLog Ltd.  announced today the closing of the sale of two modern liquefied natural gas (“LNG”) carriers, the Methane Jane Elizabeth and Methane Rita Andrea,

Brent Holds Above $97, Eyes Worst Quarter Since 2012

Brent crude futures hovered above $97 a barrel on Tuesday, aided by firm U.S. and Chinese data, but the oil benchmark was on track for its deepest quarterly drop

Container Ships

MOL Restructures Asia to S. Africa Service

Mitsui O.S.K. Lines, Ltd. (MOL) announced the restructuring of its existing Asia to South Africa liner services into two direct loops. One service will call South China,

Report on MOL Comfort Incident is out

In response to the casualty of “MOL COMFORT” which occurred on 17 June 2013, ClassNK established the Investigative Panel on Large Container Ship Safety, comprised

DMR Examines Container Terminal Congestion Issues

Container port congestion has been hitting the headlines recently, but the reasons for it vary widely and in many cases it is only a short term issue. Certain world

Vessels

Nigerian Customer Orders Ninth Damen Dredger

A Nigerian customer has added its ninth Damen dredger to its fleet. The Cutter Suction Dredger type CSD500 was chosen due to the availability of Damen Field Services in Nigeria,

Power and Endurance Ready for Austrailian Waters

Wamalhanha is the final newbuild in a series of six tugs of the Robert Allan Design, RAstar 3200 where her main duties will be terminal activities, escort duties, ship assist, towage duties.

Steel Cut for Yamal LNG Project’s Lead Tanker

A steel-cutting ceremony was held on September 29 for the lead gas tanker ordered by SCF Group for transportation of liquefied natural gas (LNG) under the Yamal LNG project.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1427 sec (7 req/sec)