RoRo Facility Installed in Ostuferhafen

MarineLink.com
Thursday, August 22, 2013
New RoRo facility for Berth No.1

The RoRo facility for Berth No. 1, which has been completely refurbished at ADM Kiel by Nobiskrug GmbH, was installed this morning. The pontoon-feeder for the ferry aft ramps weighing 1,800 tons was floated into position and moored.

Dr. Dirk Claus, Managing Director at  Seehafen Kiel GmbH & Co. KG, said, “The new RoRo device is another milestone in extending Kiel’s freight and logistic activities. From now on, cargo vessels can be loaded both via the ramp as well as by using two port cranes at Berth No. 1.”

The heart of the revamped RoRo facility is the buoyant pontoon of 1,800 tons, carrying the 32-meter-wide track installed on a steel deck for all kind of rolling cargo and serving as support surface for the aft ramps of the ferry vessels. A 23-meter-long and new bridge connects the pontoon with the quay wall in a flexible way so that loading and unloading the vessels is possible any time, no matter how the water levels might change. Dr. Claus said, “The new bridge can bear an axle load of up to 100 tons so that our options for handling heavy special cargo as well as mass general cargo have been extended significantly.”

The new RoRo-bridge is part of a project of about 5.4 million Euro which is subsidized by the state of Schleswig-Holstein with funds from the German Federation. The project also comprises the – already completed – adaption of the water depth at Berth No. 1 to a constant 10 m as well as a stronger fender system along the quay wall. The investment into the freight and logistic capacities is complemented by a warehouse that was taken into operation at the beginning of this month as well as a gantry crane for the rail terminal in Ostuferhafen. Dirk Claus: “The increasing traffic from and to Russia as well as the Baltic States requires more and more powerful port facilities. Our Ostuferhafen is absolutely meeting this demand.”

On the occasion of installing the new RoRo facility today, Mr Ralph Müller-Beck, State Secretary at the Schleswig-Holstein Ministry of Economic Affairs, Employment, Transport and Technology, caught up on the current development in Ostuferhafen. On a round tour of the Ostuferhafen, the State Secretary was also shown the new Scanning Gate and the usage of Yard IT, which are both contributing to increasing the area productivity on a sustainable basis. Dirk Claus: “Next to all these optimization measures, the next key point is the extension of Ostuferhafen by an adjacent commercial park.” At the moment, the project approval procedure is underway in order to integrate the area of 4 hectares into the port premises next year

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Nabors Posts Quarterly Loss as Drilling Activity Slows

Offshore driller Nabors Industries Ltd reported a quarterly loss, hurt by lower drilling activity amid a slump in global crude prices.   The company posted a net loss of $891.

Crowley Ships Massive Electrical Equipment

Crowley Maritime Corporation’s liner services group recently transported two massive electrical equipment enclosures with a combined weight of 196,000 pounds to San Juan, Puerto Rico.

Maersk Drilling Secures Contract for Newest Drillship

Maersk Drilling was awarded a contract from eni Ghana Exploration and Production Ltd. for employment of the newbuild drillship Maersk Voyager.   The contract

Ports

Canadian Navy Delays Opening of Arctic facility

Canada's military has again delayed the opening of a major new Arctic port, a sign the government is struggling to assert sovereignty over a remote resource-rich region.

Seafarers ... Get Some Rest!

With global focus on the mariner courtesy of MLC2006, reinforced by a number of high profile catastrophic maritime casualties that are directly linked to “the human factor,

Uber-Style Cargo Moving App Catching on at Congested LA Ports

Los Angeles area ports are using a Uber-style app called Cargomatic to help clear congestion from recent slowdowns, the Wall Street Journal reported yesterday.    After

News

Canadian Navy Delays Opening of Arctic facility

Canada's military has again delayed the opening of a major new Arctic port, a sign the government is struggling to assert sovereignty over a remote resource-rich region.

Nabors Posts Quarterly Loss as Drilling Activity Slows

Offshore driller Nabors Industries Ltd reported a quarterly loss, hurt by lower drilling activity amid a slump in global crude prices.   The company posted a net loss of $891.

Mariner Medevaced in Alaska

An ailing mariner was medevaced from a fishing vessel in Beaver Inlet, approximately 13 miles southeast of Dutch Harbor, Sunday, the U.S. Coast Guard reported.   The

Vessels

Corvus Energy Wins Order for Battery Hybrid Ferries

Scandlines ferries designed with battery hybrid propulsion to operate on the Rostock-Gedser commercial route.    Corvus Energy, Siemens AS and Scandlines have

Her Majesty The Queen to Name Britannia

Her Majesty The Queen, accompanied by His Royal Highness The Duke of Edinburgh, will name the new P&O Cruises vessel Britannia in Southampton on March 10, 2015, P&O Cruises announced.

Haven Marine Bags Back To Back Dockings

Despite a slow start to the year, Haven Marine Services reports it is now seeing a change in fortunes with two dockings for Svitzer in quick succession, with one

Ferries

Corvus Energy Wins Order for Battery Hybrid Ferries

Scandlines ferries designed with battery hybrid propulsion to operate on the Rostock-Gedser commercial route.    Corvus Energy, Siemens AS and Scandlines have

Record Thames Ridership

A record 9.8 million passengers are using the River Thames‎, two years on from the launch of the Mayor's River Action Plan, it was announced today. The River Action Plan,

Tallink & Meyer Turku to Build LNG Ferry

AS Tallink Grupp and Meyer Turku Oy signed a contract for the construction of LNG powered fast ferry for Tallinn-Helsinki route shuttle operations. The dual

Logistics

Crowley Ships Massive Electrical Equipment

Crowley Maritime Corporation’s liner services group recently transported two massive electrical equipment enclosures with a combined weight of 196,000 pounds to San Juan, Puerto Rico.

Port Conference Comes to Hamburg

This year’s IAPH World Ports Conference will be held in Hamburg from June 1-5.   International representatives from business, politics and science will gather

Johan Sverdrup Contract to "Pioneering Spirit"

Statoil has signed a contract with Allseas for installation of three platform topsides on the Johan Sverdrup field.   The vessel will be installing the topsides for the drilling,

 
 
Maritime Contracts Maritime Security Navigation Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2325 sec (4 req/sec)