Navy’s First Mobile Landing Platform Departs San Diego

MarineLink.com
Friday, July 12, 2013
SAN DIEGO (Nov. 12, 2012) Mobile landing platform ship USNS Montford Point (MLP 1) is floated out of General Dynamics NASSCO shipyard. (U.S. Navy photo courtesy of General Dynamics NASSCO/Released)

USNS Montford Point (MLP 1) departs San Diego  for Naval Station Everett, Wash. Montford Point is the Navy’s first mobile landing platform, delivered to the Navy in San Diego May 14 and expected to be fully operational in fiscal year 2015.


The ship, crewed by 33 contract mariners working for a company under charter to Military Sealift Command, will perform system tests during the voyage to its temporary layberth. Montford Point is scheduled for final contract trials in September, with its core capability set installed later this year.


The Navy’s second MLP, John Glenn, had its keel laid in December, with completion and delivery expected in March 2014.


The MLP class of modular, flexible ships belongs to MSC’s Maritime Prepositioning Force as a mobile sea-base option that provides our Navy fleet with critical afloat capability supporting the flexible deployment of forces and supplies. Contract mariners will operate and navigate the MLP ships on behalf of the Navy and Marine Corps.


“Montford Point will provide the key link – ‘the pier in the ocean’ – that will permit the military to engage in true seabasing sustainment of equipment and supplies to our troops ashore, from beyond the horizon,” said Mike Touma, assistant engineering officer in MSC’s Prepositioning Program.


Designed to increase inter-theater agility, the MLP is ready to support our warfighters wherever and whenever needed. MLP is a highly flexible ship class that provides logistics movement from sea to shore supporting a broad range of military operations.


Leveraging float-on/float-off technology and a reconfigurable mission deck to maximize capability, the MLP provides a seagoing pier when access to on-shore bases and support are unavailable. The platform includes add-on modules that support a vehicle staging area, vehicle transfer ramp, large mooring fenders and up to three Landing Craft, Air Cushioned vessel lanes to enhance its core requirements.


Notably, the MLP can operate up to 25 miles from shore and transfer equipment at sea with 1.25-meter waves and when its mission deck is removed, it can serve as a semi-submersible platform, offering salvage and point-to-point capabilities as well.


Military Sealift Command operates approximately 110 noncombatant, U.S. Navy civilian-crewed ships that replenish U.S. Navy ships, conduct specialized missions, strategically preposition combat cargo at sea around the world, and move military cargo and supplies used by deployed U.S. forces and coalition partners.

 

Maritime Reporter November 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Italy Ending Med Sea Rescues

Rights groups warn of risk of more deaths; EU mission Triton will have more limited scope. Italy said on Friday it would close a sea rescue mission that has saved the lives of more than 100,

Libyan Government: Ports, Oil Fields Safe

Libyan oil ports and fields are safe and under government control, the country's interior minister said on Friday after visting the eastern Brega port. "This

Keel Laid, Fabrication Started on 2 Navy Warships

This week, General Dynamics Bath Iron Works celebrated two milestone events for the Arleigh Burke-class program. On October 30, Bath Iron Works held a keel laying

News

U.S.& Iran Meet Ahead of Deadline for Atom Deal

U.S. Secretary of State John Kerry will meet Iran's foreign minister and the European Union foreign policy chief in Oman on Nov. 9-10 to discuss the Iranian

Tugboat Crew Missing After Collision

Five members of a tugboat crew are missing after a collision with a merchant ship about 9NM off Tanjung Gelang yesterday (30 October). One crew member was rescued by fishermen.

ClassNK Registered Al Kout Delivered to KOTC

Leading classification society ClassNK announced that it has completed work on the 165,178GT VLCC Al Kout, built by Daewoo Shipbuilding & Marine Engineering Co.

Marine Equipment

Tugboat Crew Missing After Collision

Five members of a tugboat crew are missing after a collision with a merchant ship about 9NM off Tanjung Gelang yesterday (30 October). One crew member was rescued by fishermen.

ClassNK Registered Al Kout Delivered to KOTC

Leading classification society ClassNK announced that it has completed work on the 165,178GT VLCC Al Kout, built by Daewoo Shipbuilding & Marine Engineering Co.

Royal IHC Bags Dredging Package Order

  Royal IHC (IHC) has secured a new contract with the Chinese shipyard, Jin Hai Heavy Industrial Group, for the delivery of a dredging installation package for a trailing suction hopper dredger.

Vessels

Tugboat Crew Missing After Collision

Five members of a tugboat crew are missing after a collision with a merchant ship about 9NM off Tanjung Gelang yesterday (30 October). One crew member was rescued by fishermen.

ClassNK Registered Al Kout Delivered to KOTC

Leading classification society ClassNK announced that it has completed work on the 165,178GT VLCC Al Kout, built by Daewoo Shipbuilding & Marine Engineering Co.

Royal IHC Bags Dredging Package Order

  Royal IHC (IHC) has secured a new contract with the Chinese shipyard, Jin Hai Heavy Industrial Group, for the delivery of a dredging installation package for a trailing suction hopper dredger.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2025 sec (5 req/sec)