Shell's Olympus Platform Sails for GofM

MarineLink.com
Wednesday, July 17, 2013
Olympus TLP: Photo credit Shell

Shell’s massive Olympus tension leg platform (TLP) sets sail from Ingleside, Texas for a 425 mile trek to its final home on the Mars Field in the Gulf of Mexico.

For 10 days, tugboats will pull the over 120,000 ton platform to location where work will begin to secure the platform in place.  The Olympus TLP will be moored to the seafloor by tendons grouped at each of the structure's corners and will float in approximately 3000 feet of water.

The Olympus TLP is Shell’s sixth and largest tension leg platform and will provide process infrastructure for two of Shell’s deep water discoveries, West Boreas and South Deimos. The project also includes pipelines that will be routed through West Delta 143C, the recently installed shallow water platform.



The Olympus TLP is expected to start production in 2014, producing at a rate of 100k boe.
 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Keel Laid for Holland America Line’s New Ship

Holland America Line celebrated the keel laying of its new 2,650-guest Pinnacle Class ship on August 22 at Fincantieri’s Marghera shipyard in Italy. A 680-ton block

Jones Act is Critical to Conn. Economy

Study shows Connecticut shipbuilding industry worth $2.5 billion to state’s economy, supports nearly 23,000 jobs The American Maritime Partnership (AMP) joined

CWind Launches New Vessel

CWind, a provider of integrated services to the offshore wind industry, has launched its new vessel CWind Fulmar in a naming ceremony in Brightlingsea. The CWind Fulmar, built by CTruk Ltd.

Offshore Energy

CWind Launches New Vessel

CWind, a provider of integrated services to the offshore wind industry, has launched its new vessel CWind Fulmar in a naming ceremony in Brightlingsea. The CWind Fulmar, built by CTruk Ltd.

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

Underwater Engineering

Seadrill's Q2 2014 Revenue Holds Nearly Steady

Revenues for the second quarter of 2014 were US$1,222 million compared to US$1,221 million in the first quarter of 2014, according to the company's financial report.

Rock On: UK's Kent Beach Flood Defence Starts

Rocks are being delivered as work by Van Oord starts on the £30m scheme to protect 1,400 properties at Broomhill Sands Coastal Defence Scheme in Kent, informs UK's Environment Agency.

Wood Group Kenny Wins 2 Contracts from Petrobras

Wood Group Kenny (WGK) has won two contracts with a total value of over $2 million with Brazilian operator Petrobras. In the first, WGK has begun a conceptual

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2422 sec (4 req/sec)