SCHOTTEL Propelled Tugs for Post-Panamax Era

Posted by Eric Haun
Thursday, February 27, 2014
Tractor tug Cerro Itamut 2 x SCHOTTEL SRP 2020 © Astilleros Armon, Spanien: Cerro Itamut – one of 14 tractor tugs for the Panama Canal Authority propelled by two SRP 2020.

The Panama Canal Authority is investing in especially powerful tugs for the Post-Panamax era: 14 tractor tugs and 13 ASD tugs with SCHOTTEL propulsion systems were commissioned in the last four years. The youngest generation of 14 tractor tugs delivered by Astilleros Armon Shipyard was recently completed.

One tug after another started in Spain and travelled the high seas for about a month, on their own and under their own power. They have a bollard pull of 85 tons. With a length of 28.90 meters and a width of 13.50 meters, they are a good deal larger than the ASD tugs. Two SCHOTTEL SRP 2020 Rudderpropellers (each with 2,330 kW of input power) drive each tug. The tugs, which are named after mountains in Panama (Cerro Itamut, Cerro Picacho etc.), will take the place of locomotives at the new Atlantic locks.

Thirteen ASD tugs from Cheoy Lee shipyard in Hong Kong were delivered before, all of this generation named after Panamanian rivers. The first vessel to arrive in Panama was the Calovébora in 2010, the others followed in intervals of six weeks. The tugs needed just over two months for the 9,700 miles, with a stop in Honolulu to refuel. The 27.40 meters long and 12.20 meters wide ships with a bollard pull of about 65 tons were built according to Robert Allan’s Z-Tech 6500 design. Each tug is driven by two SCHOTTEL SRP 1515 Rudderpropellers, with an input power of 2,180 kW each.

Four more ASD tugs with two SCHOTTEL SRP 1212 Rudderpropellers each have already been in service on the canal since 2001. Older models have been replaced in the course of modernizing the fleet.

The 5 de Noviembre ferry is another modern ship with a SCHOTTEL propulsion system engaged on the Panama Canal. The double-ended ferry is in service at the Gatun locks. Whereas vehicles used to have to wait at a narrow bridge for 45 minutes, today they only need three minutes to make the crossing. The ferry, which was also built in the Cheoy Lee/Hin Lee shipyard, is 42 meters long and 14 meters wide, with space for 24 trucks and 20 passengers. Two SRP 170 Rudderpropellers permit a cruising speed of 8 knots when the ferry is fully laden.

schottel.de
 

  • ASD tug CALOVEBORA 2 x SCHOTTEL SRP 1515 © Cheoy Lee Werft Hong Kong : The Calovébora on her way from Hong Kong to Panama, equipped with two SCHOTTEL SRP 1515

    ASD tug CALOVEBORA 2 x SCHOTTEL SRP 1515 © Cheoy Lee Werft Hong Kong : The Calovébora on her way from Hong Kong to Panama, equipped with two SCHOTTEL SRP 1515

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

First Supramax Vessel for Japan-Italy Venture

'DACC Tirreno' was delivered at the Oshima shipyard in Japan yesterday, the first of four Supramax bulk carriers for the dACC Maritime Limited fleet, the joint

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

BAE Systems to Expand San Diego Shipyard

BAE Systems announced it will invest approximately $100 million to expand drydocking capabilities at its San Diego shipyard.   The investment, which will include

Marine Power

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

USA Urged Not to Delay Arctic Drilling

The U.S. should immediately begin a push to exploit its enormous trove of oil in the Arctic waters off of Alaska, or risk a renewed reliance on imported oil in the future, reports AP.

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

News

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Marine Equipment

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

Viking Bags Charter Deal for AHTS Brage Viking

Viking Supply Ships has entered into a contract with an Oil major for the charter of “Brage Viking” commencing 1stof April 2015. The duration is for 2 years and 8 months firm,

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Contracts Maritime Security Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3195 sec (3 req/sec)